CN203593965U - Template supporting device for wet joint of T-shaped beam bridge floor system - Google Patents

Template supporting device for wet joint of T-shaped beam bridge floor system Download PDF

Info

Publication number
CN203593965U
CN203593965U CN201320626142.XU CN201320626142U CN203593965U CN 203593965 U CN203593965 U CN 203593965U CN 201320626142 U CN201320626142 U CN 201320626142U CN 203593965 U CN203593965 U CN 203593965U
Authority
CN
China
Prior art keywords
tee girder
bridge floor
template
shaped beam
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320626142.XU
Other languages
Chinese (zh)
Inventor
孙飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Original Assignee
Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd filed Critical Sixth Engineering Co Ltd of China Railway 19th Bureau Group Co Ltd
Priority to CN201320626142.XU priority Critical patent/CN203593965U/en
Application granted granted Critical
Publication of CN203593965U publication Critical patent/CN203593965U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a template supporting device for a wet joint of a T-shaped beam bridge floor system. The problems that the template supporting device is easily damaged, the template is difficult to remove and the repeating utilization factor of the template is low in the traditional template supporting technology of the bridge floor wet joint in erection of a dual-line T-shaped bridge are solved. The template supporting device comprises a left T-shaped beam (1) and a right T-shaped beam (2), wherein a thin steel template (4) is provided with two rows of preformed holes, the tail ends of lifting hooks (5) are provided with threads, the tail end of one lifting hook (5) is connected with a nut (8) in a threaded manner after penetrating one of the preformed holes, the head part hook of the other lifting hook (5) penetrating from one preformed hole in the left row is hooked on a right end head (6) of an embedded reinforcing steel bar of the left T-shaped beam (1), and the head part hook of the lifting hook (5) penetrating from one preformed hole in the right row is hooked on a left end head (6) of an embedded reinforcing steel bar of the right T-shaped beam (1). By adopting the template supporting device disclosed by the utility model, no support rack is arranged on the bridge floor, so that the bridge floor is prevented from being crushed and damaged by vehicles; the repeating utilization factor of the templates is high; and the construction efficiency is improved.

Description

The tee girder bridge deck seam erecting device that wets
Technical field
The present invention relates to a kind of mould before the wet seam of bridge floor being built in two-wire tee girder sets up and install device.
Background technology
In the time setting up tee girder bridge, after two-wire tee girder has set up, on bridge floor, can form 3 wet seams, the in the situation that of normal line spacing, every wet seam generally has 30 centimetres wide, and more than 30 meter long, construction process requirement will carry out reinforced concrete to wet seam builds, to complete the civil engineering of bridge floor.Building before wet seam, to carry out formwork erection to wet seam, then just can carry out cement builds, existing formwork way is to adopt to hang modular form and punching to the structure of drawing, namely template adopts wooden form or bamboo offset plate, utilize No. 12 fining twisted steels as to pull bar, pull bar is through in pvc pipe, the stressed support as template of one steel pipe or a lumps of wood is set between two tee girders of bridge floor, by clamp nut, wooden form sling and be fastened on wet seam below, and every 3 meters, an auxiliary form removal hole is being set along bridge longitudinal direction, the diameter of this hole is 3 centimetres, pre-buried pvc pipe in the wet seam of precast, pull bar is passed from pvc pipe.Because bridge floor ancillary works is too much, comprise the wet seam of T beam bridge floor system, laterally connecting partition, gear quarrel wall, transverse stretching, slip casting, sealing off and covering anchorage, sidewalk angle bar frame is installed, sidewalk pedestrian andante is installed, cable channel is installed, the a lot of working procedures of shrinkage joint installation etc., on bridge floor, often there is the situation of cross-operation, particularly the heavy-duty vehicle such as Beam transportation vehicle passes through from bridge floor continually, often occur to be erected at the situation of hanging mould steel pipe or lumps of wood press-bending or compressive strain of the wet seam on bridge floor, cause formwork again, and form removal is met difficulty, need be by reserved form removal hole, down suppress the demoulding of template ability by instruments such as wooden sticks through reserving hole, meanwhile, reserved form removal hole is easily crammed, also affect engineering attractive in appearance.In addition, in the time of stripping, because wooden form self is heavier, volume is also large, is generally to adopt wooden form to be directly slowly put on level land by rope, then after picking up by workman, transports to the construction technology of bridge floor, exist workload large, the serious problem with affecting integral construction efficiency of damaged template.
Summary of the invention
The invention provides the wet seam erecting device of a kind of tee girder bridge deck, solved easily damaged, form removal is difficult and template recycling rate of waterused is low problem of erecting device that existing two-wire tee girder exists the formwork support process of the wet seam of bridge floor in setting up.
The present invention solves above technical problem by the following technical programs:
The wet seam erecting device of a kind of tee girder bridge deck, comprise left tee girder and right tee girder, between left tee girder and right tee girder, be provided with wet seam, the right-hand member head of the embedded bar of left tee girder is arranged in wet seam, the left end head of the embedded bar of right tee girder is arranged in wet seam, on thin steel form, be provided with two row's preformed holes, tail end at suspension hook is provided with screw thread, the tail end of suspension hook is screwed together with nut from preformed hole passes, the head crotch of the suspension hook passing from the preformed hole of left bank is articulated on the right-hand member head of embedded bar of left tee girder, the head crotch of the suspension hook passing from right row's preformed hole is articulated on the left end head of embedded bar of right tee girder.
In the every row's preformed hole arranging on thin steel form, the spacing between adjacent preformed hole equates.
A kind of wet seam formwork form removal method of tee girder bridge deck, comprises the following steps:
The first step, on the thin steel form of the rectangle of 3 millimeters thick, get out two row's preformed holes, the wet seam that thin steel form is formed between left tee girder and right tee girder, be delivered to wet seam below;
Second step, by the tail end of suspension hook from top to bottom the preformed hole from thin steel form through thin steel form, nut is screwed onto to the tail end of suspension hook;
The 3rd step, the head crotch of the suspension hook passing from the preformed hole of left bank is articulated on the right-hand member head of embedded bar of left tee girder, the head crotch of the suspension hook passing from right row's preformed hole is articulated on the left end head of embedded bar of right tee girder;
The 4th step, adjust respectively the nut that the afterbody of each suspension hook is spirally connected, make thin steel form parallel with T beam bridge floor and with two T beams go out eaves bottom joint close, complete formwork;
The 5th step, solidify and reach after technological requirement when the steel concrete being cast in wet seam, knock the nut being spirally connected on the bottom surface of thin steel form with iron hammer, make the tail break of suspension hook and come off, the thin steel form coming off is downwards delivered on bridge floor from other does not carry out the wet seam of formwork, during in order to next formwork, uses.
Erecting device of the present invention does not arrange any steel pipe or wood lump supporting support on bridge floor, the destruction of thoroughly having avoided bridge floor contact haulage vehicle to cause the spreading of erecting device; Template adopts thin steel form to be not easy distortion, and form removal is very easy to operation, workman only need rap hook nut and suspension hook exposed parts with tup below, and suspension hook exposed parts is just tear-away, utilizes a crowbar sled gently, punching block will come off, workman just can be delivered to template on bridge floor along beam seam, and used convenient especially next time, and template Reusability rate is high, improve efficiency of construction, guaranteed that the wet joint concrete of having built is smooth.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is that the present invention is at the structural representation of overlooking in direction.
The specific embodiment
The wet seam erecting device of a kind of tee girder bridge deck, comprise left tee girder 1 and right tee girder 2, between left tee girder 1 and right tee girder 2, be provided with wet seam, the right-hand member head 6 of the embedded bar of left tee girder 1 is arranged in wet seam, the left end head 7 of the embedded bar of right tee girder 2 is arranged in wet seam, on thin steel form 4, be provided with two row's preformed holes, tail end at suspension hook 5 is provided with screw thread, the tail end of suspension hook 5 is screwed together with nut 8 from preformed hole passes, the head crotch of the suspension hook 5 passing from the preformed hole 3 of left bank is articulated on the right-hand member head 6 of embedded bar of left tee girder 1, the head crotch of the suspension hook 5 passing from right row's preformed hole is articulated on the left end head 7 of embedded bar of right tee girder 2.
In the every row's preformed hole arranging on thin steel form 4, the spacing between adjacent preformed hole equates.
A kind of wet seam formwork form removal method of T beam bridge floor system, comprises the following steps:
The first step, on the thin steel form 4 of the rectangle of 3 millimeters thick, get out two row's preformed holes, the wet seam that thin steel form 4 is formed between left tee girder 1 and right tee girder 2, be delivered to wet seam below;
Second step, by the tail end of suspension hook 5 from top to bottom the preformed hole from thin steel form 4 through thin steel form 4, nut 8 is screwed onto to the tail end of suspension hook 5;
The 3rd step, the head crotch of the suspension hook 5 passing from the preformed hole 3 of left bank is articulated on the right-hand member head 6 of embedded bar of left tee girder 1, the head crotch of the suspension hook passing from right row's preformed hole 5 is articulated on the left end head 7 of embedded bar of right tee girder 2;
The 4th step, adjust respectively the nut 8 that the afterbody of each suspension hook 5 is spirally connected, make thin steel form 4 parallel with T beam bridge floor and with two T beams go out eaves bottom joint close, complete formwork;
The 5th step, solidify and reach after technological requirement when the steel concrete being cast in wet seam, knock the nut 8 being spirally connected on the bottom surface of thin steel form 4 with iron hammer, make the tail break of suspension hook 5 and come off, the thin steel form 4 coming off is downwards delivered on bridge floor from other does not carry out the wet seam of formwork, during in order to next formwork, uses.
The tightness degree of template depends on the suspension hook 5 fastening degree of nut 8 below, and this formwork way makes wet joint template and beam body wing plate concrete closely by pasting to a great extent, does not occur spillage and pitted skin phenomenon.

Claims (2)

1. the wet seam erecting device of tee girder bridge deck, comprise left tee girder (1) and right tee girder (2), between left tee girder (1) and right tee girder (2), be provided with wet seam, the right-hand member head (6) of the embedded bar of left tee girder (1) is arranged in wet seam, the left end head (7) of the embedded bar of right tee girder (2) is arranged in wet seam, it is characterized in that, on thin steel form (4), be provided with two row's preformed holes, tail end at suspension hook (5) is provided with screw thread, the tail end of suspension hook (5) is screwed together with nut (8) from preformed hole passes, the head crotch of the suspension hook (5) passing from the preformed hole (3) of left bank is articulated on the right-hand member head (6) of embedded bar of left tee girder (1), the head crotch of the suspension hook (5) passing from right row's preformed hole is articulated on the left end head (7) of embedded bar of right tee girder (2).
2. the wet seam erecting device of a kind of tee girder bridge deck according to claim 1, is characterized in that, in the upper every row's preformed hole arranging of thin steel form (4), the spacing between adjacent preformed hole equates.
CN201320626142.XU 2013-10-11 2013-10-11 Template supporting device for wet joint of T-shaped beam bridge floor system Expired - Lifetime CN203593965U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320626142.XU CN203593965U (en) 2013-10-11 2013-10-11 Template supporting device for wet joint of T-shaped beam bridge floor system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320626142.XU CN203593965U (en) 2013-10-11 2013-10-11 Template supporting device for wet joint of T-shaped beam bridge floor system

Publications (1)

Publication Number Publication Date
CN203593965U true CN203593965U (en) 2014-05-14

Family

ID=50674862

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320626142.XU Expired - Lifetime CN203593965U (en) 2013-10-11 2013-10-11 Template supporting device for wet joint of T-shaped beam bridge floor system

Country Status (1)

Country Link
CN (1) CN203593965U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197307A (en) * 2021-12-31 2022-03-18 山东省交通规划设计院集团有限公司 Prefabricated bridge deck, cable-stayed bridge and construction method of cable-stayed bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114197307A (en) * 2021-12-31 2022-03-18 山东省交通规划设计院集团有限公司 Prefabricated bridge deck, cable-stayed bridge and construction method of cable-stayed bridge

Similar Documents

Publication Publication Date Title
CN103510466B (en) Wet joint construction method of T-shaped beam bridge floor system
CN103114681B (en) High-altitude long-span reinforced concrete beam treat pouring structure
CN109137744B (en) Asymmetric construction method and control method for main truss of large-span flexible suspension bridge
CN104947719B (en) The rear pouring tape construction method of formwork erecting structure is hung in basement roof post-cast strip
CN105064511A (en) Connecting structure of prestress hollow floor slab and H-shaped steel beam and construction method thereof
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN101446074B (en) Installation and closure construction method for steel sliding roadway arch on top surface of steel trussed beam bridge
CN107905111B (en) A kind of rigid frame-continuous girder end bay construction technology
CN104895279B (en) The cladding attachment structure and its construction method of precast wall panel and precast beam
CN209456892U (en) Cable-stayed bridge steel overhangs structure of sidewalk
CN111074795A (en) Construction method for pouring continuous beam in cantilever mode spanning existing railway
CN113106837B (en) Combined box girder wing plate hanging and pouring device capable of adjusting inhaul cable system and construction method
CN103993666A (en) Improved supporting system construction method suitable for large overhung outer floating plate roof
CN103469736B (en) Template supporting device of diaphragm plate of T-shaped bridge surface and template supporting and removing method
CN203593965U (en) Template supporting device for wet joint of T-shaped beam bridge floor system
CN107119582B (en) T-shaped rigid frame bridge back tower cable-stayed reinforcing structure and construction method thereof
CN113216527A (en) Cornice structure of antique building
CN213173317U (en) Be used for T roof beam wet seam construction equipment of encorbelmenting
CN209990143U (en) Floor template support system of suspension type
CN205024843U (en) Joint construction of prestressing force hollow floor and H shaped steel roof beam
CN204475145U (en) Self-anchored suspension bridge anchoring is across cast-in-place box beam
CN204690801U (en) Formwork erecting structure is hung in basement roof ater-casting
CN206636168U (en) A kind of overhanging scaffold system
CN103469734B (en) Negative bending moment bellows hole path pressure grouting construction method
CN207469749U (en) A kind of steel reinforced concrete beam forms is without support system erecting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140514