CN203589426U - Lifting device for mounting grounding wire hanging hook - Google Patents

Lifting device for mounting grounding wire hanging hook Download PDF

Info

Publication number
CN203589426U
CN203589426U CN201320804010.1U CN201320804010U CN203589426U CN 203589426 U CN203589426 U CN 203589426U CN 201320804010 U CN201320804010 U CN 201320804010U CN 203589426 U CN203589426 U CN 203589426U
Authority
CN
China
Prior art keywords
sleeve
rod
hook
hanging ring
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320804010.1U
Other languages
Chinese (zh)
Inventor
周鑫
王晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Sichuan Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201320804010.1U priority Critical patent/CN203589426U/en
Application granted granted Critical
Publication of CN203589426U publication Critical patent/CN203589426U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本实用新型公开了用于安装接地线挂钩的升降装置,包括主杆、副杆以及套筒,所述套筒套接在主杆上,副杆与套筒通过铰链连接,所述套筒的外壁上设有挂环,所述挂环的形状为方框形或圆环形,挂环所在的平面与水平面平行。本实用新型采用上述结构,能够快速、准确地将接地线挂接在高压线上,提高检修维护的工作效率。

The utility model discloses a lifting device for installing a ground wire hook, comprising a main rod, an auxiliary rod and a sleeve, the sleeve is sleeved on the main rod, the auxiliary rod and the sleeve are connected through a hinge, and the sleeve is A hanging ring is provided on the outer wall, the shape of the hanging ring is square or circular, and the plane where the hanging ring is located is parallel to the horizontal plane. The utility model adopts the above-mentioned structure, can quickly and accurately hook the grounding wire to the high-voltage wire, and improve the work efficiency of maintenance.

Description

用于安装接地线挂钩的升降装置Lifting device for installing ground wire hook

技术领域 technical field

本实用新型涉及接地线的挂接领域,具体是用于安装接地线挂钩的升降装置。 The utility model relates to the field of connecting grounding wires, in particular to a lifting device for installing a grounding wire hook.

背景技术 Background technique

目前,在进行高压检修维护时,必须将高压线接地。由于高压线离地面的距离较大,需要借助较长的操作杆来实现。一般的做法是先将连接接地线的挂钩固定在绝缘杆上,将该绝缘杆挂接在一根操作杆上,然后通过操作杆将接地线挂钩挂接到高压线上,最后绝缘杆从操作杆上自然脱落。但是这种操作方法有几个问题,首先,由于挂钩和绝缘杆有一定的重量,而且高压线与地面的距离较大,导致操作杆既要承重,又要保证够得着高压线,另外,操作杆本身不能太重又得保证一定的强度,所以对操作杆的要求很高。目前的操作杆在挂接接地线挂钩时,操作人员相对吃力,而且由于操作杆较长,当挂钩被举起时,操作杆完全严重,操作杆的顶端抖动也严重,导致挂钩无法快速、准确地挂接到高压线上,影响检修维护的工作效率。   At present, when carrying out high-voltage inspection and maintenance, the high-voltage line must be grounded. Due to the large distance between the high-voltage line and the ground, it needs to be realized with the help of a longer operating rod. The general method is to first fix the hook connecting the grounding wire on the insulating rod, then hang the insulating rod on an operating rod, and then connect the grounding wire hook to the high-voltage line through the operating rod, and finally the insulating rod is lifted from the operating rod. Fall off naturally. However, there are several problems with this method of operation. First, because the hook and insulating rod have a certain weight, and the distance between the high-voltage line and the ground is relatively large, the operating rod must not only bear the load, but also ensure that the high-voltage line can be reached. In addition, the operating rod It cannot be too heavy and must ensure a certain strength, so the requirements for the operating rod are very high. When the current operating lever is hooked to the hook of the grounding wire, the operator is relatively laborious, and because the operating lever is long, when the hook is lifted, the operating lever is completely severe, and the top of the operating lever shakes seriously, resulting in the hook not being able to be fast and accurate The ground is connected to the high-voltage line, which affects the work efficiency of maintenance. the

实用新型内容 Utility model content

本实用新型提供了用于安装接地线挂钩的升降装置,目的是解决目前的操作杆无法快速、准确地将接地线挂接在高压线上,从而影响检修维护的工作效率的问题。 The utility model provides a lifting device for installing a grounding wire hook, and aims to solve the problem that the current operating lever cannot quickly and accurately hook the grounding wire to the high-voltage line, thus affecting the work efficiency of maintenance.

本实用新型的目的通过下述技术方案实现:用于安装接地线挂钩的升降装置,包括主杆、副杆以及套筒,所述套筒套接在主杆上,副杆与套筒通过铰链连接,所述套筒的外壁上设有挂环,所述挂环的形状为方框形或圆环形,挂环所在的平面与水平面平行。 The purpose of this utility model is achieved through the following technical solutions: the lifting device for installing the grounding wire hook includes a main rod, a secondary rod and a sleeve, the sleeve is sleeved on the main rod, and the secondary rod and the sleeve are connected through a hinge connection, the outer wall of the sleeve is provided with a hanging ring, the shape of the hanging ring is a square frame or a ring, and the plane where the hanging ring is located is parallel to the horizontal plane.

进一步地,所述主杆上设有滑槽,套筒的内壁上设有与滑槽相配合的导轮。 Further, the main rod is provided with a sliding groove, and the inner wall of the sleeve is provided with a guide wheel matched with the sliding groove.

进一步地,所述套筒的下端设有两根平行的挡杆,两根挡杆位于挂环的正下方。 Further, the lower end of the sleeve is provided with two parallel blocking rods, and the two blocking rods are located directly below the hanging ring.

进一步地,所述挂环的上沿设有凹槽。 Further, a groove is provided on the upper edge of the hanging ring.

进一步地,所述主杆和副杆均为多节结构,相邻两节杆体通过螺柱和螺孔连接。 Further, the main rod and the auxiliary rod are multi-section structures, and two adjacent rod bodies are connected by studs and screw holes.

本实用新型具有以下有益效果: The utility model has the following beneficial effects:

(1)本实用新型采用主杆和副杆的组合形式,主杆上套接套筒,主杆起到主要支撑的作用,将安装有接地线挂钩的绝缘杆挂接在套筒上,副杆负责升降套筒,当套筒升至主杆的顶端时,副杆辅助支撑套筒,并调节套筒上的挂环角度,使挂钩挂接在线缆上,在副杆的辅助作用下,主杆的顶端不会出现晃动,挂钩更容易准确地挂在线缆上。 (1) The utility model adopts the combination form of the main pole and the auxiliary pole. The sleeve is sleeved on the main pole, and the main pole plays the role of main support. The rod is responsible for lifting the sleeve. When the sleeve rises to the top of the main rod, the auxiliary rod supports the sleeve and adjusts the angle of the hanging ring on the sleeve so that the hook is hooked on the cable. With the assistance of the auxiliary rod , the top of the main rod will not shake, and the hook is easier to hang on the cable accurately.

(2)本实用新型在套筒上设置两根挡杆,绝缘杆挂在挂环上后,绝缘杆的下端刚好卡在两根挡杆之间,增加了绝缘杆的受力点,防止绝缘杆的下端晃动而影响绝缘杆上端的挂钩的稳定性,从而方便安装,提高安装的准确性和效率。 (2) The utility model sets two retaining rods on the sleeve. After the insulating rod is hung on the hanging ring, the lower end of the insulating rod is just stuck between the two retaining rods, which increases the stress point of the insulating rod and prevents insulation The lower end of the rod shakes and affects the stability of the hook at the upper end of the insulating rod, thereby facilitating installation and improving installation accuracy and efficiency.

(3)本实用新型的挂环上设置凹槽,绝缘杆上设置对应的挂件,通过该挂件将绝缘杆挂在挂环上,挂件对应卡在凹槽内,从而使绝缘杆无法沿着挂环做圆周运动,即挂钩的位置相对固定,方便将挂钩挂接在线缆上。 (3) A groove is set on the hanging ring of the utility model, and a corresponding pendant is set on the insulating rod. The insulating rod is hung on the hanging ring through the pendant, and the pendant is correspondingly stuck in the groove, so that the insulating rod cannot be hung along the hanging ring. The ring moves in a circle, that is, the position of the hook is relatively fixed, which is convenient for hooking the hook on the cable.

附图说明 Description of drawings

图1为本实用新型的实施例1的整体结构示意图; Fig. 1 is the overall structural representation of embodiment 1 of the present utility model;

图2为本实用新型的实施例1的使用状态结构示意图; Fig. 2 is a schematic structural diagram of the use state of Embodiment 1 of the present utility model;

图3为本实用新型的实施例2的结构示意图; Fig. 3 is the structural representation of embodiment 2 of the present utility model;

图4为本实用新型的实施例3的使用状态结构示意图; Fig. 4 is a schematic structural view of the use state of Embodiment 3 of the present utility model;

图5为本实用新型的实施例4的挂环的结构示意图。 FIG. 5 is a schematic structural view of the hanging ring of Embodiment 4 of the present invention.

具体实施方式 Detailed ways

下面结合实施例及附图,对本实用新型作进一步的详细说明,但本实用新型的实施方式不仅限于此。 The utility model will be further described in detail below in conjunction with the embodiments and accompanying drawings, but the implementation of the utility model is not limited thereto.

实施例1: Example 1:

如图1所示,本实施例所述的用于安装接地线挂钩的升降装置,包括主杆1、副杆2以及套筒3,套筒3套接在主杆1上,副杆2与套筒3通过铰链连接,套筒3的外壁上设有挂环4,挂环4的形状为方框形或圆环形,挂环4所在的平面与水平面平行。 As shown in Figure 1, the lifting device for installing the grounding wire hook described in this embodiment includes a main rod 1, an auxiliary rod 2 and a sleeve 3, the sleeve 3 is sleeved on the main rod 1, and the auxiliary rod 2 is connected to the main rod 1. The sleeve 3 is connected by a hinge, and the outer wall of the sleeve 3 is provided with a hanging ring 4. The shape of the hanging ring 4 is a square frame or a circular ring, and the plane where the hanging ring 4 is located is parallel to the horizontal plane.

如图2所示,将安装有挂钩的绝缘杆挂在挂环3上,主杆1维持在竖直状态,调节副杆2,使套筒3缓缓向主杆1的顶端运动,套筒3达到挂接点时,通过副杆2控制挂钩的位置和方向,然后配合主杆1将挂钩挂接到线缆上。 As shown in Figure 2, hang the insulating rod with the hook on the hanging ring 3, keep the main rod 1 in a vertical state, adjust the auxiliary rod 2, and make the sleeve 3 slowly move to the top of the main rod 1, and the sleeve 3 When the hooking point is reached, control the position and direction of the hook through the secondary lever 2, and then cooperate with the main lever 1 to hook the hook to the cable.

进行接地线挂钩挂接的时候,虽然操作的时候需要两个人,一人扶住主杆,另一人控制副杆,但两人的操作都相对省力,相比传统的挂钩操作杆而言,不仅操作效率更高,而且挂钩的整个运动比较稳定,挂钩在主杆顶端不会出现晃动,很容易快速地将挂钩挂接到线缆上。 When hooking the grounding wire hook, although two people are required for the operation, one person holds the main rod and the other controls the auxiliary rod, but the operation of the two people is relatively labor-saving. Compared with the traditional hook operation rod, not only the operation The efficiency is higher, and the whole movement of the hook is relatively stable, the hook will not shake at the top of the main pole, and it is easy to quickly hook the hook to the cable.

实施例2: Example 2:

如图3所示,本实施例与实施例1基本相同,不同的地方是,本实施例在主杆1上设置滑槽,套筒3的内壁上设有与滑槽相配合的导轮5,从而使套筒3的运动更省力,减小副杆操作人员的劳动强度,也有利于实现套筒3的快速升降。 As shown in Figure 3, this embodiment is basically the same as Embodiment 1, the difference is that this embodiment is provided with a chute on the main rod 1, and the inner wall of the sleeve 3 is provided with a guide wheel 5 matched with the chute , so that the movement of the sleeve 3 is more labor-saving, reduces the labor intensity of the sub-rod operator, and is also conducive to the rapid lifting of the sleeve 3 .

实施例3: Example 3:

如图4所示,本实施例与实施例1基本相同,不同的地方是,本实施例的套筒3的下端设有两根平行的挡杆6,两根挡杆6位于挂环4的正下方,当绝缘杆挂在套筒3的挂环4上时,绝缘杆的下端刚好卡在两根挡杆6之间,通过挂环4和挡杆6的作用,绝缘杆的上端和下端均不会晃动,从而增强了绝缘杆上端的挂钩的稳定性,方便安装,提高安装的准确性和效率。 As shown in Figure 4, this embodiment is basically the same as Embodiment 1, the difference is that the lower end of the sleeve 3 of this embodiment is provided with two parallel retaining rods 6, and the two retaining rods 6 are located at the ends of the hanging ring 4. Directly below, when the insulating rod is hung on the hanging ring 4 of the sleeve 3, the lower end of the insulating rod is just stuck between the two retaining rods 6. Through the action of the hanging ring 4 and the retaining rod 6, the upper and lower ends of the insulating rod All will not shake, thereby enhancing the stability of the hook at the upper end of the insulating rod, facilitating installation, and improving the accuracy and efficiency of installation.

实施例4: Example 4:

    如图5所示,本实施例与实施例3基本相同,不同的地方是,本实施例的挂环4的上沿设有凹槽7。一般要将绝缘杆挂在挂环4上,需要在绝缘杆上设置对应的挂件,通过该挂件将绝缘杆挂在挂环4上,由于挂环4的形状为环形,绝缘杆完全可能沿着挂环的圆周转动,导致挂钩的开口方向发生变化,从而影响挂钩的挂接。为此,本实施例在挂环4上设置凹槽7,绝缘杆挂在挂环4上后,挂件对应卡在凹槽7内,从而使绝缘杆无法沿着挂环4做圆周运动,即挂钩不会发生转动,挂钩的开口位置相对固定,方便将挂钩挂接在线缆上。 As shown in Figure 5, this embodiment is basically the same as Embodiment 3, except that the upper edge of the hanging ring 4 of this embodiment is provided with a groove 7. Generally, to hang the insulating rod on the hanging ring 4, a corresponding pendant needs to be set on the insulating rod, and the insulating rod is hung on the hanging ring 4 by the hanging piece. The circular rotation of the hanging ring causes the opening direction of the hook to change, thereby affecting the hooking of the hook. For this reason, in this embodiment, a groove 7 is provided on the hanging ring 4. After the insulating rod is hung on the hanging ring 4, the pendant is correspondingly stuck in the groove 7, so that the insulating rod cannot move in a circle along the hanging ring 4, that is, The hook does not rotate, and the opening position of the hook is relatively fixed, which is convenient for hooking the hook on the cable.

实施例5: Example 5:

本实施例与实施例4基本相同,不同的地方是,本实施例主杆1和副杆2均为多节结构,相邻两节杆体通过螺柱和螺孔连接,从而方便调节主杆1和副杆2的长度,同时也方便收纳。 This embodiment is basically the same as Embodiment 4, the difference is that the main rod 1 and the auxiliary rod 2 of this embodiment are multi-section structures, and the two adjacent rod bodies are connected by studs and screw holes, so as to facilitate the adjustment of the main rod 1 And the length of the auxiliary rod 2, it is also convenient for storage.

本实用新型已经通过上述实施例进行了说明,但应当理解的是,上述实施例只是用于举例和说明的目的,而非意在将本实用新型限制于所描述的实施例范围内。此外,本领域技术人员可以理解的是,本实用新型并不局限于上述实施例,根据本实用新型的教导还可以做出更多种的变型和修改,这些变型和修改均落在本实用新型所要求保护的范围以内。  The utility model has been described through the above embodiments, but it should be understood that the above embodiments are only for the purpose of illustration and description, and are not intended to limit the utility model to the scope of the described embodiments. In addition, those skilled in the art can understand that the utility model is not limited to the above-mentioned embodiments, and more variations and modifications can be made according to the teaching of the utility model, and these variations and modifications all fall within the scope of the utility model. within the scope of the claimed protection. the

Claims (5)

1. for the lowering or hoisting gear of clamp for ground wire is installed, it is characterized in that: comprise mobile jib (1), secondary bar (2) and sleeve (3), described sleeve (3) is socketed on mobile jib (1), secondary bar (2) is connected through the hinge with sleeve (3), the outer wall of described sleeve (3) is provided with link (4), described link (4) be shaped as square frame-shaped or annular, the plane at link (4) place is parallel with horizontal plane.
2. according to claim 1 for the lowering or hoisting gear of clamp for ground wire is installed, it is characterized in that: described mobile jib (1) is provided with chute, the inwall of sleeve (3) is provided with the guide wheel (5) matching with chute.
3. according to claim 1 for the lowering or hoisting gear of clamp for ground wire is installed, it is characterized in that: the lower end of described sleeve (3) is provided with two parallel pins (6), two pins (6) be positioned at link (4) under.
4. according to claim 1 for the lowering or hoisting gear of clamp for ground wire is installed, it is characterized in that: the upper edge of described link (4) is provided with groove (7).
5. according to claim 1 for the lowering or hoisting gear of clamp for ground wire is installed, it is characterized in that: described mobile jib (1) and secondary bar (2) are multi-section structure, adjacent two pole bodies are connected with screw by double-screw bolt.
CN201320804010.1U 2013-12-10 2013-12-10 Lifting device for mounting grounding wire hanging hook Expired - Lifetime CN203589426U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320804010.1U CN203589426U (en) 2013-12-10 2013-12-10 Lifting device for mounting grounding wire hanging hook

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320804010.1U CN203589426U (en) 2013-12-10 2013-12-10 Lifting device for mounting grounding wire hanging hook

Publications (1)

Publication Number Publication Date
CN203589426U true CN203589426U (en) 2014-05-07

Family

ID=50587279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320804010.1U Expired - Lifetime CN203589426U (en) 2013-12-10 2013-12-10 Lifting device for mounting grounding wire hanging hook

Country Status (1)

Country Link
CN (1) CN203589426U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104037582A (en) * 2014-06-19 2014-09-10 国网四川省电力公司成都市新都供电分公司 Labor-saving adjustable ground wire hook mounting mechanism
CN109358212A (en) * 2018-12-05 2019-02-19 贵州电网有限责任公司 A hook-up fine-tuning device for power testing

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104037582A (en) * 2014-06-19 2014-09-10 国网四川省电力公司成都市新都供电分公司 Labor-saving adjustable ground wire hook mounting mechanism
CN109358212A (en) * 2018-12-05 2019-02-19 贵州电网有限责任公司 A hook-up fine-tuning device for power testing
CN109358212B (en) * 2018-12-05 2024-04-19 贵州电网有限责任公司 Hanging fine adjustment device for electric power test

Similar Documents

Publication Publication Date Title
CN204435979U (en) A kind of protection device for installing of electric power facility
CN103326304B (en) 10kV charged drainage wire supporting device
CN203760908U (en) Cement pole crossarm installation tool
CN203589426U (en) Lifting device for mounting grounding wire hanging hook
CN102761077B (en) Insulating hoisting bracket for strain insulator string of 1000kV extra-high alternating current line
CN203289011U (en) Tension cross arm hoisting device
CN102664377B (en) Double-cross arm assembler for single lever and double-cross arm mounting method
CN103332608A (en) Special suspender for replacing GW6 disconnector knob insulator
CN206820365U (en) A device for replacing line weight hammers
CN205355684U (en) Straight line porcelain insulator dismouting hoist
CN105305314A (en) Distribution network straightway line lifting device
CN207002096U (en) A kind of distribution auxiliary hanging device
CN105305316B (en) A kind of mountain region effort-saving circuit line lifter
CN205204677U (en) Special lifting device of circuit breaker
CN105110202A (en) Boom-rotating type hoisting support for pole-mounted switch
CN103138204A (en) Multifunctional installing rack used for replacing tension cross arm
CN204420321U (en) A kind of portable combination cable support
CN202578116U (en) Single-person on-pole assembler for dual-fan cross arm
CN203301067U (en) Apparatus for replacing pin insulator
CN204012427U (en) Insulated ladder level is adjustable hanger
CN203529713U (en) High-voltage bushing hoisting structure
CN203707374U (en) 110 kV bus knife down lead wire clamp protector
CN203345912U (en) Portable special suspension tool
CN201536236U (en) Bracket for hoisting heavy objects on object like an electrical pole
CN103326264B (en) Single-column vertical-telescopic-type outdoor high-voltage alternating replacing options

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20140507

CX01 Expiry of patent term