CN203585668U - Composite pipeline connector - Google Patents
Composite pipeline connector Download PDFInfo
- Publication number
- CN203585668U CN203585668U CN201320621248.0U CN201320621248U CN203585668U CN 203585668 U CN203585668 U CN 203585668U CN 201320621248 U CN201320621248 U CN 201320621248U CN 203585668 U CN203585668 U CN 203585668U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- pipe body
- pipe
- connecting body
- connector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000002131 composite material Substances 0.000 title abstract description 8
- 239000000498 cooling water Substances 0.000 claims abstract description 17
- 239000013505 freshwater Substances 0.000 claims abstract description 16
- 238000001816 cooling Methods 0.000 claims 1
- 238000007789 sealing Methods 0.000 abstract description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 6
- 238000001514 detection method Methods 0.000 abstract description 3
- 238000009434 installation Methods 0.000 description 9
- 238000000034 method Methods 0.000 description 5
- 150000001875 compounds Chemical class 0.000 description 1
Images
Landscapes
- Measuring Fluid Pressure (AREA)
Abstract
Description
技术领域 technical field
本实用新型属于柴油机的结构设计,具体涉及一种复合管道连接器。 The utility model belongs to the structural design of a diesel engine, in particular to a compound pipeline connector.
背景技术 Background technique
柴油机在严寒地区工作时,为保证柴油机的顺利起动,需安装一套冷却水预热器,在柴油机起动前先对机内冷却水进行预热。一些柴油机受工作空间限制,预热器回水管路只能安装在由淡水泵至机油冷却器的冷却水管上,该冷却水管为铸铝件,其上只有一个螺纹接口,用于安装检测淡水压力的传感器管路,若要连接预热器回水管路必须将传感器管路卸下,此时无法检测柴油机运行时的淡水压力。 When the diesel engine is working in a severe cold area, in order to ensure the smooth start of the diesel engine, it is necessary to install a set of cooling water preheater to preheat the cooling water in the engine before starting the diesel engine. Some diesel engines are limited by the working space, the return water pipe of the preheater can only be installed on the cooling water pipe from the fresh water pump to the oil cooler. If you want to connect the return water line of the preheater, the sensor line must be removed, and the fresh water pressure when the diesel engine is running cannot be detected at this time.
实用新型内容 Utility model content
为了解决上述技术问题,本实用新型提出一种复合管道连接器,既保证柴油机淡水压力检测用传感器管路的安装,又满足预热器的正常工作。 In order to solve the above technical problems, the utility model proposes a composite pipeline connector, which not only ensures the installation of the sensor pipeline for diesel engine fresh water pressure detection, but also satisfies the normal operation of the preheater.
本实用新型采用下述技术方案完成其发明任务: The utility model adopts the following technical solutions to complete its inventive task:
一种复合管道连接器,所述连接器包括有管道体、连接体、三通体和密封圈;具有中心通孔的连接体的外部为台阶形的筒式结构,所述的连接体的中心通孔为预热回水通道;所述的连接体左端的外壁为小直径段,通过连接体左端小直径段台阶的外螺纹,与出淡水泵的冷却水管螺纹连接;所述连接体的右端中心通孔具有一段内螺纹,与管道体螺纹联接;具有中心通孔的管道体的外部为台阶形的筒式结构,管道体的中心通孔为预热回水通道;管道体左端的外螺纹与连接体右端内孔的内螺纹连接,管道体右端管壁的外螺纹,与预热器回水管路中的截止阀螺纹连接;在管道体上开有一个小孔,用于将冷却水通过三通体引至传感器管路;所述的三通体安装在所述连接体、管道体外壁的台阶端面上,所述三通体主通道为光孔,所述三通体的中间通道与管道体上开置的小孔对应,三通体的中间通道上设计有内螺纹,用于连接检测淡水压力的传感器管路;所述的密封圈共有两个,分别位于连接体、管道体外壁的台阶端面上,并位于连接体与三通体、管道体与三通体之间,对管道起密封作用。 A composite pipe connector, the connector includes a pipe body, a connecting body, a tee body and a sealing ring; the outside of the connecting body with a central through hole is a stepped cylindrical structure, and the central through hole of the connecting body The hole is a preheating return water channel; the outer wall of the left end of the connecting body is a small diameter section, which is threaded with the cooling water pipe of the fresh water pump through the external thread of the small diameter section step at the left end of the connecting body; the center of the right end of the connecting body The through hole has a section of internal thread, which is threadedly connected with the pipe body; the outside of the pipe body with the central through hole is a stepped cylindrical structure, and the central through hole of the pipe body is a preheating return water channel; the external thread at the left end of the pipe body is connected with the The internal thread of the inner hole at the right end of the connecting body is connected, and the external thread of the pipe wall at the right end of the pipe body is threadedly connected with the stop valve in the return water pipe of the preheater; there is a small hole on the pipe body for passing the cooling water through the three The whole body is led to the sensor pipeline; the three-way body is installed on the step end surface of the connecting body and the outer wall of the pipeline, the main channel of the three-way body is a light hole, and the middle channel of the three-way body is opened on the pipeline body Corresponding to the small hole, the middle channel of the tee body is designed with an internal thread for connecting the sensor pipeline for detecting fresh water pressure; there are two sealing rings, which are respectively located on the stepped end surface of the connecting body and the outer wall of the pipeline, and It is located between the connecting body and the tee body, the pipe body and the tee body, and plays a sealing role on the pipe.
所述连接体其中一段的外壁为正六面形,便于连接体的装拆;所述管道体其中一段的外壁为正六面形,便于管道体的装拆。 The outer wall of one section of the connecting body is regular hexahedral, which facilitates the assembly and disassembly of the connecting body; the outer wall of one section of the pipe body is regular hexahedral, which is convenient for the assembly and disassembly of the pipe body.
使用前组装过程:先将连接体安装在出淡水泵冷却水管上,再将密封圈、三通体、密封圈依次套在管道体上,管道体左端与连接体螺纹连接,连接体和管道体上的台阶端面对密封圈和三通体定位,螺纹旋紧后压紧密封;在螺纹旋紧过程中,三通体根据实际安装需求360°任意旋转,将三通体中间通道孔调整到适宜的方向后定位,以便传感器管路安装,安装到位后管道体上小孔处于由连接体、密封圈、三通体、管道体四个零部件形成的密闭空间内;管道体的右端外螺纹与预热器管路中的截止阀相连接。 Assembly process before use: first install the connecting body on the cooling water pipe of the fresh water pump, then put the sealing ring , tee body, and sealing ring on the pipe body in sequence, the left end of the pipe body is threaded with the connecting body, and the connecting body and the pipe body The stepped end faces the sealing ring and the tee body to be positioned, and the thread is tightened to seal; during the thread tightening process, the tee body can be rotated arbitrarily 360° according to the actual installation requirements, and the middle channel hole of the tee body is adjusted to a suitable direction. Positioning for the installation of the sensor pipeline. After the installation is in place, the small hole on the pipeline body is in a closed space formed by the four parts of the connecting body, the sealing ring, the tee body and the pipeline body; the external thread at the right end of the pipeline body and the preheater tube The shut-off valve in the road is connected.
本实用新型的特点是:1、能够同时满足对柴油机进行冷却水预热及淡水压力检测;2、连接体、管道体采用螺纹连接,安装、拆卸方便;3、三通体是套在连接体和管道体的台阶外圆上,安装过程中不与连接体和管道体一同旋转,安装空间小;4、安装时,三通体可根据实际工作需求360°旋转变换中间螺纹端方向。 The features of the utility model are: 1. It can meet the requirements of cooling water preheating and fresh water pressure detection for the diesel engine at the same time; 2. The connection body and the pipeline body are connected by threads, which is convenient for installation and disassembly; 3. The three-way body is set on the connection body and On the outer circle of the step of the pipe body, it does not rotate together with the connecting body and the pipe body during installation, and the installation space is small; 4. During installation, the tee body can be rotated 360° to change the direction of the middle thread end according to the actual work requirements.
附图说明 Description of drawings
图1为本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model.
图2为图1的A-A剖面图。 FIG. 2 is a cross-sectional view along line A-A of FIG. 1 .
图3为图1的B-B剖面图。 Fig. 3 is a B-B sectional view of Fig. 1 .
图中,1、连接体,2、密封圈,3、三通体,4、管道体。 In the figure, 1, connecting body, 2, sealing ring, 3, tee body, 4, pipe body.
具体实施方式 Detailed ways
结合附图和具体实施例对本实用新型加以说明。 The utility model is described in conjunction with the accompanying drawings and specific embodiments.
如图1所示,一种复合管道连接器,所述连接器包括有连接体1、三通体3、密封圈2和管道体4;具有中心通孔的连接体1的外部为台阶形的筒式结构,所述连接体1的中心通孔,为预热回水通道;在连接体1左端的外壁为小直径段,通过连接体左端小直径段的外螺纹,与出淡水泵的冷却水管螺纹连接;所述连接体1的右端中心通孔具有一段内螺纹,与管道体4螺纹联接;具有中心通孔的管道体4的外部为台阶形的筒式结构,管道体的中心通孔为预热回水通道;管道体左端的外螺纹与连接体右端内孔的内螺纹连接,管道体右端管壁的外螺纹,与预热器回水管路中的截止阀螺纹连接;在管道体4上开有一个小孔,用于将冷却水通过三通体3引至传感器管路;所述的三通体3安装在所述连接体1、管道体4外壁的台阶端面上,所述三通体主通道为光孔,所述三通体的中间通道与管道体上开置的小孔对应,三通体的中间通道上设计有内螺纹,用于连接检测淡水压力的传感器管路;所述的密封圈2共有两个,分别位于连接体1、管道体4外壁的台阶端面上,并位于连接体1与三通体3、管道体4与三通体3之间,对管道起密封作用。
As shown in Figure 1, a composite pipe connector, the connector includes a connecting body 1, a
参照图2、图3,所述连接体其中一段的外壁为正六面形,便于连接体1的装拆;所述管道体其中一段的外壁为正六面形,便于管道体4的装拆。 Referring to Fig. 2 and Fig. 3, the outer wall of one section of the connecting body is regular hexahedral, which is convenient for the assembly and disassembly of the connecting body 1;
使用前组装过程:先将连接体1安装在出淡水泵冷却水管上,然后将密封圈2、三通体3、密封圈2依次套在管道体4上,管道体左端螺纹旋入连接体内螺纹,连接体1和管道体4上的台阶端面对密封圈2和三通体3定位,螺纹旋紧后压紧密封;在螺纹旋紧过程中,三通体3根据实际安装需求360°任意旋转,将三通体中间通道孔调整到适宜的方向后定位,以便检测淡水压力的传感器管路安装,安装到位后管道体上小孔处于由连接体1、密封圈2、三通体3、管道体4四个零部件形成的密闭空间内;管道体4的右端外螺纹与预热器管路中的截止阀相连接。
Assembly process before use: first install the connecting body 1 on the cooling water pipe of the fresh water pump, then put the
柴油机起动前对柴油机内部冷却水预热,预热回路中的截止阀处于打开状态,冷却水通过连接体1、管道体4的中心孔进入柴油机进行预热,预热回路水流方向如图1所示;柴油机完成预热后,关闭预热回路中的截止阀,柴油机内部冷却水进入复合管道连接器,水流方向与图1所示水流方向相反,通过连接体中心通孔、管道体上小孔进入由连接体1、密封圈2、三通体3、管道体4形成的密闭空间,然后流入测量淡水压力的传感器管路,测量柴油机正常运行时淡水压力。
Before starting the diesel engine, preheat the cooling water inside the diesel engine. The shut-off valve in the preheating circuit is in an open state. The cooling water enters the diesel engine through the central hole of the connecting body 1 and the pipe body 4 to preheat the diesel engine. The water flow direction of the preheating circuit is shown in Figure 1 Shown; after the diesel engine is preheated, close the stop valve in the preheating circuit, the internal cooling water of the diesel engine enters the composite pipe connector, and the water flow direction is opposite to that shown in Figure 1, passing through the central through hole of the connecting body and the small hole on the pipe body Enter the closed space formed by connecting body 1, sealing
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320621248.0U CN203585668U (en) | 2013-10-10 | 2013-10-10 | Composite pipeline connector |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320621248.0U CN203585668U (en) | 2013-10-10 | 2013-10-10 | Composite pipeline connector |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203585668U true CN203585668U (en) | 2014-05-07 |
Family
ID=50583582
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320621248.0U Expired - Fee Related CN203585668U (en) | 2013-10-10 | 2013-10-10 | Composite pipeline connector |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203585668U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103486386A (en) * | 2013-10-10 | 2014-01-01 | 河南柴油机重工有限责任公司 | Composite pipeline connector |
CN112388213A (en) * | 2020-12-02 | 2021-02-23 | 布莱凯特设备(苏州)有限公司 | Cooling device for welding conveying assembly line |
-
2013
- 2013-10-10 CN CN201320621248.0U patent/CN203585668U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103486386A (en) * | 2013-10-10 | 2014-01-01 | 河南柴油机重工有限责任公司 | Composite pipeline connector |
CN112388213A (en) * | 2020-12-02 | 2021-02-23 | 布莱凯特设备(苏州)有限公司 | Cooling device for welding conveying assembly line |
CN112388213B (en) * | 2020-12-02 | 2022-04-12 | 布莱凯特设备(苏州)有限公司 | Cooling device for welding conveying assembly line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203585668U (en) | Composite pipeline connector | |
CN203836426U (en) | Stainless steel liner movable connector pipe fitting | |
CN103486386A (en) | Composite pipeline connector | |
CN104455815B (en) | Tapered sealing pipe connector for excavator | |
CN204986094U (en) | Long -life high pressure fuel pipe sealing joint | |
CN102852466B (en) | Special buttress thread oil sleeve connecting joint | |
CN105370221A (en) | Drill pipe quick-connecting mechanism | |
CN101382210B (en) | Filter press pipe sealing structure and pipe sealing method | |
CN203517075U (en) | Pipeline connecting assembly | |
CN203870303U (en) | Joint box cable quick-sealing assembly | |
CN104565626A (en) | Auxiliary sealing structure for spherical joint | |
CN205175610U (en) | Erection joint of LNG line pressure sensor | |
CN205244708U (en) | Singly close union tee of rivers | |
CN204269312U (en) | A kind of helium nitrogen gas mixing device for gases at high pressure leak detection | |
CN204474701U (en) | A kind of blast furnace water-cooling but wall pressure testing device | |
CN203958292U (en) | Heavy motor vehicle hydraulic power-assist steering system detects connection structure | |
CN102944414A (en) | Erosive abrasion test device for fracturing tool | |
CN203519249U (en) | Design of sealing and connecting structure with no damage to taper-pipe thread for pressure sensor | |
CN201412105Y (en) | Clamp flange throttling device | |
CN201547287U (en) | Female connection soft-sealing gate valve | |
CN204922332U (en) | Perpendicular straight joint of cutting ferrule formula | |
CN206059120U (en) | A kind of optical fiber lead-out structure of intelligent transformer | |
CN205315185U (en) | Sealed diverging device based on kang mingsi PT sprayer measurement experiment | |
CN217003234U (en) | An electric high temperature two-way ball valve | |
CN222163083U (en) | Hydraulic pipe network system for rapidly judging faults |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140507 Termination date: 20181010 |