CN203572907U - Leakage protector without trip and power cut in leakage test - Google Patents
Leakage protector without trip and power cut in leakage test Download PDFInfo
- Publication number
- CN203572907U CN203572907U CN201320724263.8U CN201320724263U CN203572907U CN 203572907 U CN203572907 U CN 203572907U CN 201320724263 U CN201320724263 U CN 201320724263U CN 203572907 U CN203572907 U CN 203572907U
- Authority
- CN
- China
- Prior art keywords
- protector
- relay
- switch
- leakage
- trip coil
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Breakers (AREA)
Abstract
The utility model provides a leakage protector without trip and power cut in a leakage test, belonging to the field of leakage protector test. The leakage protector comprises a protector input end and a protector output end which is connected with the protector input end through a protector main switch. A protector main control chip which is connected with the protector main switch supplies power for a release coil through driving a release coil relay so as to drive a release to act. The leakage protector is characterized in that a detection reset switch is arranged between the release coil relay and the release coil, the output end of the protector main control chip is provided with a test relay which is in parallel connection with the release coil relay, a test port is arranged at the same time, and the test port is connected with the protector output end through the test relay. According to the leakage protector, when the leakage test is carried out, the leakage test can be completed without trip and power cut, and the normal production and life are ensured.
Description
Technical field
While carrying out leakage tests, without an earth leakage protective device for tripping operation power-off, belong to earth leakage protective device field tests.Be specifically related to a kind of when carrying out leakage tests without tripping operation power-off earth leakage protective device.
Background technology
As shown in Figure 3; when existing protector carries out leakage tests; the hand-held residual current tester of tester applies measuring current to the output terminal of protector; when the measuring current applying reaches the current threshold of setting; protector main control chip drives the trip coil actuating of relay that the current supply circuit of trip coil is connected; the trip coil action that powers on; electrical apparatus release drives the tripping operation of protector main switch, residual operating current and the actuation time that by residual current tester, can measure protector.But the earth leakage protective device of prior art is carrying out in leakage tests; when each phase line of power supply is tested; protector all can trip once; after protector tripping operation; the user who is connected to protector output terminal just can power-off; can have a strong impact on user's production and life, and for some to power supply by the place of specific (special) requirements, its loss is even more serious.
Summary of the invention
The technical problems to be solved in the utility model is: overcome the deficiencies in the prior art, provide a kind of when carrying out leakage tests, without the earth leakage protective device of tripping operation power-off.
The utility model solves the technical scheme that its technical matters adopts: when this carries out leakage tests without the earth leakage protective device of tripping operation power-off, the protector output terminal that comprises protector input end, is connected with protector input end by protector main switch, the protector main control chip being connected with protector main switch is trip coil power supply by driving trip coil relay, to drive electrical apparatus release action, it is characterized in that: between described trip coil relay and trip coil, be provided with detection reset switch; At the output terminal of protector main control chip, be provided with the busy relay in parallel with trip coil relay, be provided with the test port being connected with protector output terminal by busy relay simultaneously.
Between described busy relay and protector output terminal, be provided with the phase change-over switch of realizing three gear switches; the not moved end of phase change-over switch is connected with three phase lines of protector output terminal respectively, and the moved end of phase change-over switch is connected with busy relay.
The moved end of described phase change-over switch is connected with one end of the normally closed contact of busy relay, and the other end of the normally closed contact of busy relay is connected with test port.
Described detection reset switch is the hand switch being connected on trip coil current supply circuit.
Compared with prior art, had beneficial effect of the present utility model is:
1, of the present utility model a kind of while carrying out leakage tests without the earth leakage protective device of tripping operation power-off when carrying out normal leakage tests; without earth leakage protective device tripping operation power-off, can complete test; make the user can normal power supply in when test; normal production and life have been guaranteed, the unnecessary economic loss of having avoided user to cause because of power-off.
2, protector output terminal is connected with test port with busy relay by phase change-over switch, only needs conversion gear can complete the leakage tests of three phase lines, and it is more convenient to test.
3, principle is simple, and dependable performance is equally applicable to individual event earth leakage protective device, and range of application is wider.
Accompanying drawing explanation
Fig. 1 is a kind of earth leakage protective device functional-block diagram without tripping operation power-off while carrying out leakage tests.
Fig. 2 is a kind of circuit for electric leakage protector schematic diagram without tripping operation power-off while carrying out leakage tests.
Fig. 3 is prior art earth leakage protective device functional-block diagram.
Embodiment
Fig. 1 ~ 2nd, most preferred embodiment of the present utility model, is described further below in conjunction with 1 ~ 2 pair of the utility model of accompanying drawing.
As shown in Figure 1, of the present utility model a kind ofly mainly consist of the following components without the earth leakage protective device (hereinafter to be referred as earth leakage protective device) of tripping operation power-off while carrying out leakage tests: protector input end, protector main switch, protector output terminal, protector main control chip, trip coil relay, detect reset switch, trip coil, electrical apparatus release, busy relay, phase change-over switch and test port, wherein protector input end, protector main switch, protector output terminal, protector main control chip, trip coil relay, trip coil, electrical apparatus release is the device in prior art earth leakage protective device.
Protector input end is connected with protector output terminal by protector main switch, and when protector main switch closes a floodgate, the power supply that self-shield device input end enters is delivered to protector output terminal through protector main switch, for being connected to the customer power supply of protector output terminal.Protector main switch is connected with protector main control chip, and the output terminal of protector main control chip is trip coil relay in parallel and busy relay simultaneously, and protector main control chip can be controlled trip coil relay and busy relay moves simultaneously.Trip coil relay is connected with trip coil by detecting reset switch, can be trip coil power supply after the trip coil actuating of relay, and reset detection switch can cut off the current supply circuit between trip coil relay and trip coil.Trip coil powers on and can drive electrical apparatus release action, realizes the action of protector main switch.Between busy relay and protector output terminal, be provided with phase change-over switch, test port is connected by the normally closed contact of busy relay and the moved end of phase change-over switch, and the not moved end of phase change-over switch is connected with protector output terminal.
As shown in Figure 2, coil KM1 is above-mentioned trip coil, and K switch 1 is above-mentioned detection reset switch, and K switch 1 is linked switch, is connected on the current supply circuit of coil KM1, can be switched on or switched off by Push switch K1 the current supply circuit of coil KM1.Coil KA1 is the coil of above-mentioned busy relay, is connected in parallel on the output terminal of protector main control chip with trip coil relay simultaneously.Normally closed contact KA1-1 one end of busy relay KA1 is connected with the moved end of switch K2; three of switch K2 not moved end be in parallel with three phase line A, B, C of protector output terminal respectively; the other end of normally closed contact KA1-1 is connected with test port S, and switch K2 is above-mentioned phase change-over switch.In actual earth leakage protective device; the not top of the coil KM1 of electrical apparatus release, the coil KA1 of busy relay and normally closed contact KA1-1 and switch K2 is all arranged on earth leakage protective device inside; the moved end of detecting reset switch K1, test port S and switch K2 is arranged on a side of the shell of earth leakage protective device, and convenient operation personnel manually operate.
Specific works process and principle are as follows: when earth leakage protective device of the present utility model is carried out to leakage tests, first press and detect reset switch by the current supply circuit cut-out of trip coil, make earth leakage protective device in test mode.Then switch phase change-over switch, any one normally closed contact by busy relay in protector output terminal is connected with test port.
Tester is connected the current output terminal of leakage current detector with test port, and the normally closed contact by busy relay by current load in the phase line of protector output terminal.When the output current of leakage current detector is greater than the leakage current threshold value of leakage current detector, protector main control chip drives trip coil relay and busy relay to move simultaneously.
Owing to detecting reset switch, the current supply circuit of trip coil is cut off, so cannot power for trip coil after the action of tripping relay coil relay, electrical apparatus release is failure to actuate, and the power-off of not tripping of protector main switch, continues as user's power transmission.After busy relay action; normally closed contact in it disconnects; loop between test port and test phase line is disconnected; leakage current detector is by detecting the actuation time of busy relay and the actuation time that action current calculates earth leakage protective device; this phase phase line leakage tests of protector output terminal is complete, by switching phase change-over switch, can continue other phase places to carry out leakage tests.After being completed, pressing detection reset switch and make earth leakage protective device recover normal duty.
Of the present utility model a kind of without the earth leakage protective device of tripping operation power-off, be three-phase electric leakage protector while carrying out leakage tests, be equally applicable to monophase leakage protector.
The above, it is only preferred embodiment of the present utility model, be not the restriction of the utility model being made to other form, any those skilled in the art may utilize the technology contents of above-mentioned announcement to be changed or be modified as the equivalent embodiment of equivalent variations.But every technical solutions of the utility model content that do not depart from, any simple modification, equivalent variations and the remodeling above embodiment done according to technical spirit of the present utility model, still belong to the protection domain of technical solutions of the utility model.
Claims (4)
- One kind while carrying out leakage tests without the earth leakage protective device of tripping operation power-off, the protector output terminal that comprises protector input end, is connected with protector input end by protector main switch, the protector main control chip being connected with protector main switch is trip coil power supply by driving trip coil relay, to drive electrical apparatus release action, it is characterized in that: between described trip coil relay and trip coil, be provided with detection reset switch; At the output terminal of protector main control chip, be provided with the busy relay in parallel with trip coil relay, be provided with the test port being connected with protector output terminal by busy relay simultaneously.
- According to claim 1 a kind of while carrying out leakage tests without the earth leakage protective device of tripping operation power-off; it is characterized in that: between described busy relay and protector output terminal, be provided with the phase change-over switch of realizing three gear switches; the not moved end of phase change-over switch is connected with three phase lines of protector output terminal respectively, and the moved end of phase change-over switch is connected with busy relay.
- According to claim 2 a kind of while carrying out leakage tests without the earth leakage protective device of tripping operation power-off; it is characterized in that: the moved end of described phase change-over switch is connected with one end of the normally closed contact of busy relay, and the other end of the normally closed contact of busy relay is connected with test port.
- According to claim 1 a kind of while carrying out leakage tests without the earth leakage protective device of tripping operation power-off, it is characterized in that: described detection reset switch is the hand switch being connected on trip coil current supply circuit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320724263.8U CN203572907U (en) | 2013-11-16 | 2013-11-16 | Leakage protector without trip and power cut in leakage test |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320724263.8U CN203572907U (en) | 2013-11-16 | 2013-11-16 | Leakage protector without trip and power cut in leakage test |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203572907U true CN203572907U (en) | 2014-04-30 |
Family
ID=50540634
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320724263.8U Expired - Fee Related CN203572907U (en) | 2013-11-16 | 2013-11-16 | Leakage protector without trip and power cut in leakage test |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203572907U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105044510A (en) * | 2014-07-18 | 2015-11-11 | 国家电网公司 | Multi-channel intelligent online leakage protection uninterruptible test device with simple wiring and rational structure |
CN108061838A (en) * | 2017-12-18 | 2018-05-22 | 淄博职业学院 | A kind of leakage tests method for ensureing user's normal electricity consumption |
-
2013
- 2013-11-16 CN CN201320724263.8U patent/CN203572907U/en not_active Expired - Fee Related
Cited By (34)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105044510A (en) * | 2014-07-18 | 2015-11-11 | 国家电网公司 | Multi-channel intelligent online leakage protection uninterruptible test device with simple wiring and rational structure |
CN105093009A (en) * | 2014-07-18 | 2015-11-25 | 国家电网公司 | Multi-path intelligent on-line leakage protection uninterruptible-power-supply testing apparatus capable of improving power supply reliability |
CN106019036A (en) * | 2014-07-18 | 2016-10-12 | 江苏省电力公司南通供电公司 | Testing method of intelligent online residual current device outage-free testing device |
CN106019033A (en) * | 2014-07-18 | 2016-10-12 | 江苏省电力公司南通供电公司 | Testing method of multi-path intelligent online leakage protection non-outage testing device |
CN106019142A (en) * | 2014-07-18 | 2016-10-12 | 江苏省电力公司南通供电公司 | Multi-way intelligent online leakage protection non-power-outage testing device with reasonable structure |
CN106019143A (en) * | 2014-07-18 | 2016-10-12 | 江苏省电力公司南通供电公司 | Multi-channel intelligent online residual current protector uninterrupted power supply testing device with reasonable and simple structure |
CN106019144A (en) * | 2014-07-18 | 2016-10-12 | 江苏省电力公司南通供电公司 | Multi-channel intelligent online residual current protector uninterrupted power supply testing device with reasonable structure |
CN106019141A (en) * | 2014-07-18 | 2016-10-12 | 江苏省电力公司南通供电公司 | Testing method of intelligent online residual current protector uninterrupted power supply testing device with reasonable structure |
CN106019038A (en) * | 2014-07-18 | 2016-10-12 | 江苏省电力公司南通供电公司 | Multi-channel intelligent online residual current protector uninterrupted power supply testing device achieving simple wiring |
CN106019035A (en) * | 2014-07-18 | 2016-10-12 | 江苏省电力公司南通供电公司 | Multi-way intelligent on-line leakage protector uninterrupted testing device for improving leakage protector integrity |
CN106019031A (en) * | 2014-07-18 | 2016-10-12 | 江苏省电力公司南通供电公司 | Testing method of multi-way intelligent online leakage protection not-covered no-power-outage testing device with simple wiring |
CN106019030A (en) * | 2014-07-18 | 2016-10-12 | 江苏省电力公司南通供电公司 | Testing method of intelligent online leakage protector non-outage testing device |
CN106019037A (en) * | 2014-07-18 | 2016-10-12 | 江苏省电力公司南通供电公司 | Testing method of reliable-power-supply intelligent online leakage-protector poweroff-free testing device |
CN106019032A (en) * | 2014-07-18 | 2016-10-12 | 江苏省电力公司南通供电公司 | Testing method of intelligent online residual current protector uninterrupted power supply testing device achieving simple wiring |
CN106019034A (en) * | 2014-07-18 | 2016-10-12 | 江苏省电力公司南通供电公司 | Multi-way intelligent online leakage protection non-power-outage testing device capable of achieving multi-way respective testing |
CN106019029A (en) * | 2014-07-18 | 2016-10-12 | 江苏省电力公司南通供电公司 | Multi-way online leakage protection non-power-outage testing device with reasonable structure and simple wiring |
CN106054007A (en) * | 2014-07-18 | 2016-10-26 | 江苏省电力公司南通供电公司 | Multi-channel test method of multichannel intelligent on-line leakage-protection uninterrupted power test device |
CN106291054A (en) * | 2014-07-18 | 2017-01-04 | 江苏省电力公司南通供电公司 | A kind of multi-way intelligence leaks guarantor's uninterrupted power test device online |
CN106291053A (en) * | 2014-07-18 | 2017-01-04 | 江苏省电力公司南通供电公司 | The online leakage tested respectively of multichannel can protect the method for testing of uninterrupted power test device |
CN106291052A (en) * | 2014-07-18 | 2017-01-04 | 江苏省电力公司南通供电公司 | A kind of can leak guarantor's uninterrupted power test device online by the multi-way intelligence tested respectively of multichannel |
CN106291347A (en) * | 2014-07-18 | 2017-01-04 | 江苏省电力公司南通供电公司 | The multi-way intelligence improving power supply reliability leaks guarantor's uninterrupted power test device online |
CN106291346A (en) * | 2014-07-18 | 2017-01-04 | 江苏省电力公司南通供电公司 | A kind of multi-way intelligence improving power supply reliability leaks guarantor's uninterrupted power test device online |
CN106291055A (en) * | 2014-07-18 | 2017-01-04 | 江苏省电力公司南通供电公司 | A kind of multi-way intelligence leaks the multi-channel test method protecting uninterrupted power test device online |
CN106291184A (en) * | 2014-07-18 | 2017-01-04 | 江苏省电力公司南通供电公司 | The method of testing protecting uninterrupted power test device is leaked in rational in infrastructure, wiring the most online |
CN106291185A (en) * | 2014-07-18 | 2017-01-04 | 江苏省电力公司南通供电公司 | Multi-way intelligence rational in infrastructure leaks the method for testing protecting uninterrupted power test device online |
CN106291056A (en) * | 2014-07-18 | 2017-01-04 | 江苏省电力公司南通供电公司 | The method of testing of uninterrupted power test device is protected in the online leakage improving leakage guarantor's integrity |
CN106324387A (en) * | 2014-07-18 | 2017-01-11 | 江苏省电力公司南通供电公司 | Testing method for multipath intelligent on-line residual current operated protective device power cut free testing device |
CN106324390A (en) * | 2014-07-18 | 2017-01-11 | 江苏省电力公司南通供电公司 | Multi-channel intelligent on-line leakage protection power-on test system for improving leakage protection integrity |
CN106324389A (en) * | 2014-07-18 | 2017-01-11 | 江苏省电力公司南通供电公司 | Online leakage protection live-line testing method capable of achieving multichannel testing independently |
CN106324386A (en) * | 2014-07-18 | 2017-01-11 | 江苏省电力公司南通供电公司 | Testing method for multipath intelligent on-line residual current operated protective device power cut free testing device |
CN106324388A (en) * | 2014-07-18 | 2017-01-11 | 江苏省电力公司南通供电公司 | Test method of reliably-powered multi-channel intelligent online leakage protector power-on test device |
CN106324391A (en) * | 2014-07-18 | 2017-01-11 | 江苏省电力公司南通供电公司 | Simple-wiring multipath intelligent online leakage protection no-power-failure testing device |
CN108061838A (en) * | 2017-12-18 | 2018-05-22 | 淄博职业学院 | A kind of leakage tests method for ensureing user's normal electricity consumption |
CN108061838B (en) * | 2017-12-18 | 2019-12-10 | 浙江长生滤清器有限公司 | Electric leakage test method for ensuring normal electricity consumption of user |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103441508A (en) | Multipurpose low-voltage intelligent capacitor | |
CN104062580B (en) | A kind of portable beaker three-phase non-three phase tester movement time | |
CN203839269U (en) | An improved 10kv circuit breaker closing loop | |
CN203572907U (en) | Leakage protector without trip and power cut in leakage test | |
CN203871840U (en) | Programmable, safe, energy-saving leakage protector | |
CN203289181U (en) | Power supply loop | |
CN203433084U (en) | A thyristor electronic switch online monitoring apparatus | |
CN202259083U (en) | Circuit breaker for prepayment watt-hour meter | |
CN201893293U (en) | Arcless switching relay | |
CN201717670U (en) | Dual-power-supply switching device with overvoltage protection | |
CN204269703U (en) | Electricity charge arrearage sound and light alarm resetting system | |
CN203572929U (en) | Breaker monitoring device | |
CN203930006U (en) | Non-full phase tester actuation time of a kind of portable beaker three-phase | |
CN103149540A (en) | Three-phase power detection circuit for pump | |
CN203849387U (en) | Switch power supply repetition switch testing circuit of power supply adapter | |
CN204065252U (en) | A kind of simulator of circuit breaker of practicality | |
CN207504635U (en) | A kind of double power-supply automatic transferring device | |
CN102654572A (en) | Testing method for delayed output time of signal control terminal of intelligent electric energy meter | |
CN205353310U (en) | Divide open close controlling means experimental absolutely in step based on AC vacuum contactor | |
CN104377804A (en) | Control system of PLC controllable dual-power switch | |
CN103745850A (en) | A high-voltage breaker opening-closing control apparatus | |
CN204270050U (en) | A kind of intelligent controller of control and protective switching device | |
CN203706957U (en) | High voltage breaker switching-closing controller | |
CN204144699U (en) | Energy-saving cabinet | |
CN203674786U (en) | Voltage parallel cabinet AC voltage output apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140430 Termination date: 20211116 |
|
CF01 | Termination of patent right due to non-payment of annual fee |