CN203547754U - Device for improving construction precision of long and large pipe shed - Google Patents

Device for improving construction precision of long and large pipe shed Download PDF

Info

Publication number
CN203547754U
CN203547754U CN201320404166.0U CN201320404166U CN203547754U CN 203547754 U CN203547754 U CN 203547754U CN 201320404166 U CN201320404166 U CN 201320404166U CN 203547754 U CN203547754 U CN 203547754U
Authority
CN
China
Prior art keywords
construction
pipe shed
drill bit
utility
long
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320404166.0U
Other languages
Chinese (zh)
Inventor
苗春刚
宋伟龙
杨秀仁
孙立军
黄美群
付款峰
徐阳
王庆峰
仪松青
徐龙
王臣
吴兰婷
丁德云
吴成刚
荣冰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 14th Bureau Group Co Ltd
Beijing Urban Construction Design and Development Group Co Ltd
Original Assignee
Beijing Urban Establishing Design & Research Institute Co Ltd
China Railway 14th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Urban Establishing Design & Research Institute Co Ltd, China Railway 14th Bureau Group Co Ltd filed Critical Beijing Urban Establishing Design & Research Institute Co Ltd
Priority to CN201320404166.0U priority Critical patent/CN203547754U/en
Application granted granted Critical
Publication of CN203547754U publication Critical patent/CN203547754U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The utility model relates to a device for improving construction precision of a long and large pipe shed, which comprises a drilling rod and a drilling bit, wherein the drilling rod and the drilling bit are connected through a variable-diameter joint. The drilling bit is internally provided with a sensor and a display screen. The drilling bit has a trapezoidal cross section. The device provided by the utility model ensures construction precision of the long and large pipe shed which is constructed according to a one-time non-excavation pipe paving technique. Supporting effect of the pipe shed can be ensured without introducing structure range. A simple and practical pipe shed construction error-correcting adjusting system is formed. The device provided by the utility model has the functions of: greatly improving construction efficiency, ensuring advanced supporting effect in subway excavation, improving construction quality of advanced supporting pipe shed, and simultaneously reducing risk in excavation construction.

Description

The grow up device of pipe roof construction precision of a kind of raising
Technical field
The utility model relates to underground structrue engineering technical field, relates in particular to the grow up device of pipe roof construction precision of a kind of raising.
Background technology
For the subway station that adopts the construction of supporting arch hidden digging top-down method, in construction, inevitably disturbed strata causes stratum deformation, and excessive stratum deformation can cause adverse effect to safety and the construction safety of surrounding environment (existing construction of structures, pipeline etc.).Therefore controlling the stratum settlement that shallow burial hidden digging construction causes plays a part very important to the success or failure of engineering.For the subway station of shallow burial hidden digging construction, the measure of controlling stratum deformation mainly contains: improvement formation condition, Optimizing construction engineering method, takes leading reinforcement measure etc.Research shows, ground settlement amount has 30% left and right to occur before Tunnel generation effect.Pipe canopy, as advance support householder method important in constructing tunnel, has positive effect in several respects such as anti-collapse, obstruct sedimentation, even stratum settlement, raising coffer mechanics parameters.
Meanwhile, because pipe roof construction has disguise highly, its work progress cannot be observed, and is also difficult for inspecting for acceptance after pore-forming, in different stratum constructions, has different construction technology control standards.Although this technique is just day by day perfect at present, often because traditional handicraft also can exist defect, causes shrinkage cavity, embrace to bore, disconnected pipe, invade the quality problems such as construction profile and also happen occasionally.In construction, the most common pipe roof construction quality problems are still managed canopy to set angle improper, make to manage that canopy is invaded tunneling excavation range of structures or angle deviating design attitude does not exist the risk of caving in compared with having greatly the effect of advance support.Therefore, analyze the scientific and reasonable technology controlling and process means of summing up, innovation improves technology measure, to guarantee that supporting arch hidden digging top-down method construction safety seems very important.
Utility model content
The purpose of this utility model is to provide a kind of raising device of pipe roof construction precision of growing up.
The technical solution of the utility model is as follows:
Raising is grown up and is managed the device of canopy precision: comprise drilling rod and a drill bit, drilling rod is connected by a reducer union with drill bit, is provided with sensor and display screen in drill bit, and drill bit cross section is trapezoid cross section.
Further, sensor comprises light-emitting device and probe;
Further, sensor is connected with holding wire with drilling rod.
Its technical essential is to adopt new trapezoid cross section pipe canopy drill bit to substitute traditional tapered cross-section pipe canopy drill bit, the monitoring equipment of installing according to drill bit internal, can monitor the angle of the offset design position of drill bit, the difference of drill bit and soil body contact area while then utilizing the direct jacking in trapezoid cross section, be subject to one perpendicular to the power on inclined-plane, thereby make drill bit change the adjustment that its drilling direction can be realized drilling direction angle.
The key point of technique is to improve grow up Real-Time Monitoring that the device of pipe roof construction precision forms and the integral framework of adjustment, this device not only has enough intensity, rigidity and stability, and form of structure simplicity of design, the feature that the difference of the form of structure of use device itself realizes unbalance stress is managed correction and the adjustment of canopy direction and angle.Main design innovation be in drill bit, install can monitor the signalling arrangement of drill bit direction and angle in drilling process, by improving drill bit structure form, realize the angle and direction that real-time adjustment drill bit creeps into.This control valve canopy sets the new equipment of precision, its form of structure simplicity of design, and stress is clear, can fast and effeciently manage the correction that canopy sets angle and direction according to monitoring situation, thereby reaches safe, fast, efficient tunneling construction requirement.
The beneficial effects of the utility model are: the raising of the present utility model features such as the drill bit structure form that the device of pipe canopy precision forms is simple, work progress rectifying effect is obvious of growing up, effectively hold the shortcoming that has overcome conventional tube canopy drill bit, for raising, grow up that the construction of the disposable no-dig laying pipelines technique of pipe canopy sets precision, the pipe roof construction quality of guaranteeing to grow up, guarantee that a tunneling reverse construction plays safely positive role.Facts have proved, the successful implementation of this " a kind of raising is grown up and managed the device of canopy precision ", not only simplicity of design, construction safety, reliable, and than traditional pipe canopy drill bit form, duration can shorten more than 15%, cost savings are more than 10%, and remarkable benefit, has good using value and dissemination.
Accompanying drawing explanation
Fig. 1 is conventional tube canopy drill bit design schematic diagram;
Fig. 2 is drill bit schematic diagram of the present utility model.
Description of reference numerals: 1-display screen; 2-drilling rod; 3-sensor; 4-tapered cross-section drill bit; 5-trapezoid cross section drill bit; 6-bracing frame; 7-holding wire; 8-reducer union.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described further.
The grow up device of pipe canopy precision of raising: by changing conventional drill (seeing Fig. 1) conical interface form, redesign the drill bit form at a kind of trapezoidal interface (seeing Fig. 2), utilize front end signal monitor real-time display frame to pipe canopy drill bit direction and adjust more greatly.Special sensor is housed in drill bit, and sensor is directly by 15V direct current supply.Display screen shows the inclination angle (level angle) of drill bit, towards angle (direction of guide strip: guide strip is 12 points upward, as clock face).If set angle on the lower side, drill bit can be transferred to 12 points, upward, directly jacking, now because guide strip bottom board inclined plane area is large for guide strip.Be subject to the power making progress, bit course will move upward.In like manner 6 corrections, can make bit course down, 9 points, 3 are to be respectively left and right correction direction.If angle is suitable, rig is rotary drilling at the uniform velocity, and now drilling rod track is generally straight by designing requirement, thereby reaches the requirement that improves pipe roof construction precision.

Claims (3)

1. the raising device of pipe roof construction precision of growing up: comprise drilling rod and a drill bit, it is characterized in that described drilling rod is connected by a reducer union with drill bit, be provided with sensor and display screen in drill bit, drill bit cross section is trapezoid cross section.
2. a kind of raising according to claim 1 device of pipe roof construction precision of growing up, is characterized in that sensor comprises light-emitting device and probe.
3. a kind of raising according to claim 1 device of pipe roof construction precision of growing up, is characterized in that sensor is connected with holding wire with drilling rod.
CN201320404166.0U 2013-07-09 2013-07-09 Device for improving construction precision of long and large pipe shed Expired - Fee Related CN203547754U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320404166.0U CN203547754U (en) 2013-07-09 2013-07-09 Device for improving construction precision of long and large pipe shed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320404166.0U CN203547754U (en) 2013-07-09 2013-07-09 Device for improving construction precision of long and large pipe shed

Publications (1)

Publication Number Publication Date
CN203547754U true CN203547754U (en) 2014-04-16

Family

ID=50465883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320404166.0U Expired - Fee Related CN203547754U (en) 2013-07-09 2013-07-09 Device for improving construction precision of long and large pipe shed

Country Status (1)

Country Link
CN (1) CN203547754U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869974A (en) * 2017-03-23 2017-06-20 中交三航局第三工程有限公司 A kind of ultra-long horizontal pipe curtain jacking construction control device and method based on deviational survey
CN106988755A (en) * 2017-05-10 2017-07-28 中铁五局集团第五工程有限责任公司 A kind of tunnel portal weak surrounding rock section overlength pipe shed construction method
CN107060805A (en) * 2017-03-23 2017-08-18 中交三航局第三工程有限公司 A kind of deviation correcting device of advanced levels pipe curtain jacking construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869974A (en) * 2017-03-23 2017-06-20 中交三航局第三工程有限公司 A kind of ultra-long horizontal pipe curtain jacking construction control device and method based on deviational survey
CN107060805A (en) * 2017-03-23 2017-08-18 中交三航局第三工程有限公司 A kind of deviation correcting device of advanced levels pipe curtain jacking construction
CN106988755A (en) * 2017-05-10 2017-07-28 中铁五局集团第五工程有限责任公司 A kind of tunnel portal weak surrounding rock section overlength pipe shed construction method

Similar Documents

Publication Publication Date Title
CN103306683B (en) A kind of construction method of comprehensive precipitation in hole when excavating deep tunnel
CN104612698B (en) A kind of shallow-depth-excavation tunnel top bar interval wall construction method
CN104047623B (en) A kind of big across cavern excavation construction method
CA3009431C (en) Steel coring drilling machine and green new construction method capable of replacing trench well exploration
CN101598023B (en) Control method for shield tunnel axis having underground structure on adjacent side
CN102733812B (en) The method for tunnel construction that river bottom of city fork section small-clear-distance tunnel sidewall digs
CN110700841B (en) Double-side-wall guide pit type excavation method for tunnel excavation
CN204877481U (en) Horizontal guiding twist bit
CN104047629B (en) The method that thin coal bed fully-mechanized mining gob side entry retaining directional drilling extraction closes on lower coal-bed gas
CN203547754U (en) Device for improving construction precision of long and large pipe shed
CN106837411B (en) Arrangement structure and method for filling and grouting of deep-buried shield tunnel
CN104234726A (en) Internal dewatering and drainage construction method for tunnel passing through water-rich unconformable contact zone
CN102966359A (en) Working face ventilation oxidization zone roof control method
CN108678753B (en) Reverse-slope tunnel construction method
CN103032075A (en) Construction method for building ground inlet and outlet type shield tunnel
CN103422813B (en) Individual well eye multi-lateral horizontal well system for coal bed gas and boring method
CN104153783B (en) A kind of rich in subsoil water and loose sand sand cobble diversion tunnel construction technology
CN204312092U (en) A kind of rich water soft soil layer shallow-depth-excavation tunnel arch grouting and reinforcing structure
CN204920983U (en) Pipe installation suitable for collapsible loess tunnel advance support
CN204023526U (en) A kind of discharge structure that reduces embedded penstock external water pressure
CN106759242A (en) The method for designing and arrangement and method for construction of a kind of white-out slope underground water
CN203383822U (en) Seepage-proofing well wall
CN104879137A (en) Super-large pipe shed construction method
CN203924043U (en) A kind of bamboo concrete stake
CN204060718U (en) Pre grouting from the surface reinforced roadway is through the Novel cloth pore structure of fault belt place country rock

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 250000 No. 16 Heping Road, Shandong, Ji'nan

Patentee after: China Railway Shisiju Group Corporation

Patentee after: BEIJING URBAN CONSTRUCTION DESIGN & DEVELOPMENT GROUP CO., LIMITED

Address before: 250000 No. 16 Heping Road, Shandong, Ji'nan

Patentee before: China Railway Shisiju Group Corporation

Patentee before: Beijing Urban Establishing Design & Research Institute Co., Ltd.

GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140416

Termination date: 20180709

CF01 Termination of patent right due to non-payment of annual fee