CN203545492U - Attached type crane walking track device on top of boiler - Google Patents

Attached type crane walking track device on top of boiler Download PDF

Info

Publication number
CN203545492U
CN203545492U CN201320691798.XU CN201320691798U CN203545492U CN 203545492 U CN203545492 U CN 203545492U CN 201320691798 U CN201320691798 U CN 201320691798U CN 203545492 U CN203545492 U CN 203545492U
Authority
CN
China
Prior art keywords
sleeper
boiler
track
fixed
plate beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320691798.XU
Other languages
Chinese (zh)
Inventor
张卫华
付琦
葛建伟
李新颖
刘大涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan No1 Thermal Power Construction Co
Original Assignee
Henan No1 Thermal Power Construction Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan No1 Thermal Power Construction Co filed Critical Henan No1 Thermal Power Construction Co
Priority to CN201320691798.XU priority Critical patent/CN203545492U/en
Application granted granted Critical
Publication of CN203545492U publication Critical patent/CN203545492U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

The utility model discloses an attached type crane walking track device on top of a boiler. The device comprises a large boiler plate beam, wherein a sleeper is arranged at the upper end of the large boiler plate beam; two fixing blocks are arranged on two sides of the large boiler plate beam and the sleeper; the sleeper is fixed on the large boiler plate beam through the fixing blocks; a track is arranged in the middle position of the plane of the sleeper; U-shaped fixing clamps are arranged at two ends of the track; the track is fixed on the sleeper through the U-shaped fixing clamps; the two fixing blocks are arranged and are respectively fixed on two sides of the large boiler plate beam and the sleeper; two U-shaped fixing clamps are arranged and are respectively clamped on two sides of the track. The sleeper of the device is made of a welded channel steel material, the conventional cement sleeper or the wooden sleeper is replaced, and the sleeper is fixed on the large plate beam through the fixing blocks, so that the problem that a crane is arranged at the top of the boiler is solved, the construction hoisting speed is increased, the working intensity is alleviated, the machine application rate is increased, and good economic benefits and social benefits are achieved.

Description

Boiler top adhesion type hoisting crane walking rail set
Technical field:
The utility model relates to a kind of hoisting crane walking rail set, particularly relates to a kind of boiler top adhesion type hoisting crane walking rail set.
Background technology:
Because thermoelectricity scale of the project is increasing, construction period is more and more tighter, need to add the lifting speed of large equipment, therefore considers, at boiler top, a hoisting crane is installed, and improves lifting speed.How to improve lifting speed and guarantee that duration progress becomes the task of top priority of project construction.
Utility model content:
Technical problem to be solved in the utility model is: a kind of boiler top adhesion type hoisting crane walking rail set is provided, has solved like this hoisting crane is arranged on to the technical matters on furnace roof.
The utility model is that the technical scheme that technical solution problem is taked is:
A kind of boiler top adhesion type hoisting crane walking rail set, comprise boiler girder, described boiler girder upper end is provided with sleeper, in the both sides of described boiler girder and sleeper, is provided with fixed block, and described sleeper is fixed on boiler girder by fixed block; On described sleeper, plane midway location is provided with track, and described track two ends are provided with " U " type fixed card, and described track is fixed on described sleeper by " U " type fixed card.
Described fixed block is two, is separately fixed at the both sides of large plate-girder and sleeper.
Described " U " type fixed card is two, is connected to respectively the both sides of track.
Described sleeper is welded by channel-section steel material.
Positive beneficial effect of the present utility model is as follows:
1, sleeper of the present utility model is welded by channel-section steel material, traditional concrete sleeper or wooden sleeper have been replaced, sleeper is fixed on boiler girder by fixed block, solved like this hoisting crane has been arranged on to the problem on boiler top, and improved construction hoisting speed, there is good economic benefit and social benefit.
2, the utility model is directly installed on hoisting crane on large plate-girder, easy to use, free, can obviously improve lifting speed, has reduced work slight, has improved mechanical Occupation coefficient.
Accompanying drawing explanation:
Fig. 1 is structural representation of the present utility model.
The specific embodiment:
Below in conjunction with accompanying drawing, the utility model is further described:
Referring to Fig. 1, a boiler top adhesion type hoisting crane walking rail set, comprises boiler girder 5, in boiler girder 5 upper ends, is provided with sleeper 2, both sides at boiler girder 5 and sleeper 2 are provided with fixed block 1, and sleeper 2 is fixed on boiler girder 5 by fixed block 1; On sleeper 2, plane midway location is provided with track 4, is provided with " U " type fixed card 3 at track 4 two ends, and track 4 is fixed on sleeper 2 by " U " type fixed card 3.Wherein: fixed block 1 is two, be separately fixed at the both sides of large plate-girder 5 and sleeper 2; " U " type fixed card 3 is two, is connected to respectively the both sides of track 4.
Sleeper 2 of the present utility model is welded by channel-section steel material, traditional concrete sleeper or wooden sleeper have been replaced, sleeper 2 is fixed on boiler girder 5 by fixed block 1, solved like this hoisting crane has been arranged on to the problem on boiler top, and improved construction hoisting speed, reduce work slight, improved mechanical Occupation coefficient, there is good economic benefit and social benefit.

Claims (4)

1. boiler top adhesion type hoisting crane walking rail set, comprise boiler girder (5), it is characterized in that: described boiler girder (5) upper end is provided with sleeper (2), both sides at described boiler girder (5) and sleeper (2) are provided with fixed block (1), and described sleeper (2) is fixed on boiler girder (5) by fixed block (1); The upper plane midway location of described sleeper (2) is provided with track (4), and described track (4) two ends are provided with " U " type fixed card (3), and described track (4) is fixed on described sleeper (2) by " U " type fixed card (3).
2. boiler top adhesion type hoisting crane walking rail set according to claim 1, is characterized in that: described fixed block (1) is two, is separately fixed at the both sides of large plate-girder (5) and sleeper (2).
3. a kind of boiler top adhesion type hoisting crane walking rail set according to claim 1, is characterized in that: described " U " type fixed card (3) is two, is connected to respectively the both sides of track (4).
4. boiler top adhesion type hoisting crane walking rail set according to claim 1, is characterized in that: described sleeper (2) is welded by channel-section steel material.
CN201320691798.XU 2013-11-05 2013-11-05 Attached type crane walking track device on top of boiler Expired - Fee Related CN203545492U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320691798.XU CN203545492U (en) 2013-11-05 2013-11-05 Attached type crane walking track device on top of boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320691798.XU CN203545492U (en) 2013-11-05 2013-11-05 Attached type crane walking track device on top of boiler

Publications (1)

Publication Number Publication Date
CN203545492U true CN203545492U (en) 2014-04-16

Family

ID=50463639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320691798.XU Expired - Fee Related CN203545492U (en) 2013-11-05 2013-11-05 Attached type crane walking track device on top of boiler

Country Status (1)

Country Link
CN (1) CN203545492U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106379810A (en) * 2016-08-30 2017-02-08 中国能源建设集团安徽电力建设第工程有限公司 Lifting method for three devices of 660MW unit tower type boiler
CN106379811A (en) * 2016-11-30 2017-02-08 山东电力建设第工程公司 n-type boiler hoisting machinery arrangement structure of side coal bunker structure of unit and hoisting method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106379810A (en) * 2016-08-30 2017-02-08 中国能源建设集团安徽电力建设第工程有限公司 Lifting method for three devices of 660MW unit tower type boiler
CN106379811A (en) * 2016-11-30 2017-02-08 山东电力建设第工程公司 n-type boiler hoisting machinery arrangement structure of side coal bunker structure of unit and hoisting method
CN106379811B (en) * 2016-11-30 2017-11-21 山东电力建设第一工程公司 Unit side coal bunker structure π type boiler structural design mechanical arrangement structures and hanging method

Similar Documents

Publication Publication Date Title
CN203559354U (en) Stay cable anchoring structure applied to prestressed concrete partially cable-stayed bridge
CN203545492U (en) Attached type crane walking track device on top of boiler
CN103541300B (en) Based on the construction method of the railway concrete continuous beam that flat stacking is implemented
CN205617651U (en) Precast concrete board
CN204607431U (en) A kind of trackless transfer crane
CN202017342U (en) Block traction drawing die for slope concrete pouring
CN203498743U (en) Railway concrete continuous beam implemented on basis of flat pushing method
CN102535650A (en) Device for connecting composite wallboard and floor slab
CN203127962U (en) Material transportation device for hot blast stove
CN204873485U (en) River course is bridge crane usefulness walking portal frame for pier
CN204690599U (en) Road and bridge engineering protector
CN204212791U (en) Driving face Novel front canopy hoisting ring device
CN203568647U (en) Novel machine-room-free elevator load bearing structure
CN203429792U (en) Integral sliding device for steel structure
CN202688898U (en) Transverse position adjusting device for steel beam
CN201762890U (en) Positioning strip for steel bar and template of reinforced concrete wall
CN205775851U (en) Aperture apparatus crossed by a kind of mobile formwork bed die
CN204298702U (en) The vertical lifting tool of track plates
CN203066351U (en) Reinforcement structure of steel-encased-concrete composite beam
CN203270601U (en) Equipment basic foundation system used for steel structure
CN204251130U (en) A kind of elevator standard knot
CN203904945U (en) Integrated outside concrete formwork
CN202491293U (en) Prefabricated beam slab template structure
CN104005388B (en) A kind of all-in-one-piece outside concrete blinding
CN202508720U (en) Diagonal web member

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140416

Termination date: 20151105

EXPY Termination of patent right or utility model