CN203536911U - 双回高压线路穿越杆 - Google Patents
双回高压线路穿越杆 Download PDFInfo
- Publication number
- CN203536911U CN203536911U CN201320670938.5U CN201320670938U CN203536911U CN 203536911 U CN203536911 U CN 203536911U CN 201320670938 U CN201320670938 U CN 201320670938U CN 203536911 U CN203536911 U CN 203536911U
- Authority
- CN
- China
- Prior art keywords
- wire
- lead wire
- arm
- cross arm
- cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004020 conductor Substances 0.000 claims abstract description 9
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- WABPQHHGFIMREM-UHFFFAOYSA-N lead(0) Chemical compound [Pb] WABPQHHGFIMREM-UHFFFAOYSA-N 0.000 abstract 11
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本实用新型公开了双回高压线路穿越杆,该穿越杆包括竖杆(1)、避雷线横担(2)、导线上横担(3)和导线下横担(4),避雷线横担(2)、导线上横担(3)和导线下横担(4)从上往下安装在竖杆(1)上,避雷线横担(2)的两端分别安装地线挂线点(5)和上导线跳线挂线点(6),导线上横担(3)的两端分别安装上导线挂线点(7),导线下横担(4)上左右两侧分别对称间隔安装四个下导线挂线点(8),整体构成穿越杆。本实用新型结构简单,操作方便,导线采用水平与垂直混合型式,线路布置紧凑,既保证线路对地安全距离,又解决线路对上面的高压线路安全距离。
Description
技术领域
本实用新型涉及线路穿越高压线路的杆塔型式,具体涉及双回高压线路穿越杆。
背景技术
现在线路穿越110kV以上高压线路时,如果上面的高压线路高度不高,正常穿越难以实现,往往要将上面的高压线路升高改造。升高高压线路费用较高,而且新架一条线路要涉及另外高压线路升高改造与停电,影响涉及范围内的地区供电,既影响经济效益,也影响社会效益。
发明内容
本实用新型的目的在于:提供一种双回高压线路穿越杆,导线采用水平与垂直混合型式,线路布置紧凑,既保证线路对地安全距离,又解决线路对上面的高压线路安全距离,解决局部地方上下空间距离不够问题,有着显著的经济效益与社会效益。
本实用新型的技术解决方案是:该穿越杆包括竖杆、避雷线横担、导线上横担和导线下横担,避雷线横担、导线上横担和导线下横担从上往下安装在竖杆上,避雷线横担的两端分别安装地线挂线点和上导线跳线挂线点,导线上横担的两端分别安装上导线挂线点,导线下横担上左右两侧分别对称间隔安装四个下导线挂线点,整体构成穿越杆。
本实用新型的优点是:1、控制好穿越线路与被穿越线路(即上面导线)、穿越线路对地或者对建筑物距离,以满足安全要求;2、确定避雷线、导线排列方式、挂线点位置,保证避雷线对导线的防雷、导线间水平距离和垂直距离满足安全要求;3、穿越杆比普通铁塔等具有材料集中、自身体积小、占地面积小等特点,在空间较小、对占地要求较高等场合有较大的利用价值;4、结合现场实际情况,导线的挂线点和导线跳线的连接合理布置,尽可能地减少施工难度。
附图说明
图1是本实用新型结构示意图。
图2是图1的使用状态示意图。
图中:1竖杆,2避雷线横担,3导线上横担,4导线下横担,5地线挂线点,6上导线跳线挂线点,7上导线挂线点,8、下导线挂线点。
具体实施方式
如图1、2所示,该穿越杆包括竖杆1、避雷线横担2、导线上横担3和导线下横担4,避雷线横担2、导线上横担3和导线下横担4从上往下安装在竖杆1上,避雷线横担2的两端分别安装地线挂线点5和上导线跳线挂线点6,导线上横担3的两端分别安装上导线挂线点7,导线下横担4上左右两侧分别对称间隔安装四个下导线挂线点8,整体构成穿越杆。
Claims (1)
1.双回高压线路穿越杆,其特征是:该穿越杆包括竖杆(1)、避雷线横担(2)、导线上横担(3)和导线下横担(4),避雷线横担(2)、导线上横担(3)和导线下横担(4)从上往下安装竖杆(1)上,避雷线横担(2)的两端分别安装地线挂线点(5)和上导线跳线挂线点(6),导线上横担(3)的两端分别安装上导线挂线点(7),导线下横担(4)上左右两侧分别对称间隔安装四个下导线挂线点(8),整体构成穿越杆。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320670938.5U CN203536911U (zh) | 2013-10-29 | 2013-10-29 | 双回高压线路穿越杆 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320670938.5U CN203536911U (zh) | 2013-10-29 | 2013-10-29 | 双回高压线路穿越杆 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203536911U true CN203536911U (zh) | 2014-04-09 |
Family
ID=50423087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320670938.5U Expired - Fee Related CN203536911U (zh) | 2013-10-29 | 2013-10-29 | 双回高压线路穿越杆 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203536911U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104018720A (zh) * | 2014-05-27 | 2014-09-03 | 国家电网公司 | 高压架线方法 |
CN105140861A (zh) * | 2015-10-15 | 2015-12-09 | 国网北京市电力公司 | 配电杆 |
CN105429083A (zh) * | 2015-12-31 | 2016-03-23 | 国网浙江奉化市供电公司 | 一种双偏心横担 |
-
2013
- 2013-10-29 CN CN201320670938.5U patent/CN203536911U/zh not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104018720A (zh) * | 2014-05-27 | 2014-09-03 | 国家电网公司 | 高压架线方法 |
CN105140861A (zh) * | 2015-10-15 | 2015-12-09 | 国网北京市电力公司 | 配电杆 |
CN105429083A (zh) * | 2015-12-31 | 2016-03-23 | 国网浙江奉化市供电公司 | 一种双偏心横担 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203536911U (zh) | 双回高压线路穿越杆 | |
CN104201634A (zh) | 一种单回线路交叉开断方法 | |
CN106368495B (zh) | 一种新型穿身直线窄基塔 | |
CN103985509B (zh) | 一种变压器的安置架 | |
CN204497701U (zh) | 一种用于各种电压等级中送电线路的单回路穿越式钻越杆 | |
CN203846844U (zh) | 双回线路同杆架设交叉换位杆塔 | |
CN203452435U (zh) | 双回路钻跨式钢管杆 | |
CN201319483Y (zh) | 电缆终端杆 | |
CN204597415U (zh) | 一种安全高压电线架 | |
CN204492310U (zh) | 一种±500kV直流输电线路避雷器安装支柱式结构 | |
CN204370879U (zh) | 一种新型交叉换位塔 | |
CN104577929A (zh) | 双回高压线路穿越杆 | |
CN103354319B (zh) | 一种220千伏户外gis双飞蜓出线布置结构 | |
CN103972836A (zh) | 一种输电线路钻越方法 | |
CN205135071U (zh) | ±800kV垂直排列杯型直线塔 | |
CN204343772U (zh) | 四回路电缆下地窄基电缆终端钢管塔 | |
CN104563577A (zh) | 高压线路双t杆 | |
CN206346561U (zh) | 一种单回路垂直排列耐张塔 | |
CN209817551U (zh) | 单回路穿跨一体式输电杆塔 | |
CN207459403U (zh) | 一种紧凑型330kV变电站GIS的垂直出线结构 | |
CN204983867U (zh) | 一种跳线上翻式双回路耐张塔 | |
CN204370881U (zh) | 输电线路三回路铁塔 | |
CN206245843U (zh) | 一种安装有防鸟装置的铁塔 | |
CN203583970U (zh) | 高压线路双t杆 | |
CN205791186U (zh) | Gis配电装置端部出线结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140409 Termination date: 20181029 |
|
CF01 | Termination of patent right due to non-payment of annual fee |