CN104577929A - 双回高压线路穿越杆 - Google Patents
双回高压线路穿越杆 Download PDFInfo
- Publication number
- CN104577929A CN104577929A CN201310519075.6A CN201310519075A CN104577929A CN 104577929 A CN104577929 A CN 104577929A CN 201310519075 A CN201310519075 A CN 201310519075A CN 104577929 A CN104577929 A CN 104577929A
- Authority
- CN
- China
- Prior art keywords
- wire
- conductor
- arm
- cross
- cross arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004020 conductor Substances 0.000 claims abstract description 19
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/24—Cross arms
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/20—Spatial arrangements or dispositions of lines or cables on poles, posts or towers
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本发明公开了双回高压线路穿越杆,该穿越杆包括竖杆(1)、避雷线横担(2)、导线上横担(3)和导线下横担(4),避雷线横担(2)、导线上横担(3)和导线下横担(4)从上往下安装在竖杆(1)上,避雷线横担(2)的两端分别安装地线挂线点(5)和上导线跳线挂线点(6),导线上横担(3)的两端分别安装上导线挂线点(7),导线下横担(4)上左右两侧分别对称间隔安装四个下导线挂线点(8),整体构成穿越杆。本发明结构简单,操作方便,导线采用水平与垂直混合型式,线路布置紧凑,既保证线路对地安全距离,又解决线路对上面的高压线路安全距离。
Description
技术领域
本发明涉及线路穿越高压线路的杆塔型式,具体涉及双回高压线路穿越杆。
背景技术
现在线路穿越110kV以上高压线路时,如果上面的高压线路高度不高,正常穿越难以实现,往往要将上面的高压线路升高改造。升高高压线路费用较高,而且新架一条线路要涉及另外高压线路升高改造与停电,影响涉及范围内的地区供电,既影响经济效益,也影响社会效益。
发明内容
本发明的目的在于:提供一种双回高压线路穿越杆,导线采用水平与垂直混合型式,线路布置紧凑,既保证线路对地安全距离,又解决线路对上面的高压线路安全距离,解决局部地方上下空间距离不够问题,有着显著的经济效益与社会效益。
本发明的技术解决方案是:该穿越杆包括竖杆、避雷线横担、导线上横担和导线下横担,避雷线横担、导线上横担和导线下横担从上往下安装在竖杆上,避雷线横担的两端分别安装地线挂线点和上导线跳线挂线点,导线上横担的两端分别安装上导线挂线点,导线下横担上左右两侧分别对称间隔安装四个下导线挂线点,整体构成穿越杆。
本发明的优点是:1、控制好穿越线路与被穿越线路(即上面导线)、穿越线路对地或者对建筑物距离,以满足安全要求;2、确定避雷线、导线排列方式、挂线点位置,保证避雷线对导线的防雷、导线间水平距离和垂直距离满足安全要求;3、穿越杆比普通铁塔等具有材料集中、自身体积小、占地面积小等特点,在空间较小、对占地要求较高等场合有较大的利用价值;4、结合现场实际情况,导线的挂线点和导线跳线的连接合理布置,尽可能地减少施工难度。
附图说明
图1是本发明结构示意图。
图2是图1的使用状态示意图。
图中:1竖杆,2避雷线横担,3导线上横担,4导线下横担,5地线挂线点,6上导线跳线挂线点,7上导线挂线点,8、下导线挂线点。
具体实施方式
如图1、2所示,该穿越杆包括竖杆1、避雷线横担2、导线上横担3和导线下横担4,避雷线横担2、导线上横担3和导线下横担4从上往下安装在竖杆1上,避雷线横担2的两端分别安装地线挂线点5和上导线跳线挂线点6,导线上横担3的两端分别安装上导线挂线点7,导线下横担4上左右两侧分别对称间隔安装四个下导线挂线点8,整体构成穿越杆。
Claims (1)
1.双回高压线路穿越杆,其特征是:该穿越杆包括竖杆(1)、避雷线横担(2)、导线上横担(3)和导线下横担(4),避雷线横担(2)、导线上横担(3)和导线下横担(4)从上往下安装竖杆(1)上,避雷线横担(2)的两端分别安装地线挂线点(5)和上导线跳线挂线点(6),导线上横担(3)的两端分别安装上导线挂线点(7),导线下横担(4)上左右两侧分别对称间隔安装四个下导线挂线点(8),整体构成穿越杆。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310519075.6A CN104577929A (zh) | 2013-10-29 | 2013-10-29 | 双回高压线路穿越杆 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310519075.6A CN104577929A (zh) | 2013-10-29 | 2013-10-29 | 双回高压线路穿越杆 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104577929A true CN104577929A (zh) | 2015-04-29 |
Family
ID=53093408
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310519075.6A Pending CN104577929A (zh) | 2013-10-29 | 2013-10-29 | 双回高压线路穿越杆 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104577929A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105350797A (zh) * | 2015-11-27 | 2016-02-24 | 中国能源建设集团广东省电力设计研究院有限公司 | 线路构架及架线结构 |
-
2013
- 2013-10-29 CN CN201310519075.6A patent/CN104577929A/zh active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105350797A (zh) * | 2015-11-27 | 2016-02-24 | 中国能源建设集团广东省电力设计研究院有限公司 | 线路构架及架线结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105298201A (zh) | 输电线路电缆终端立体引下装置 | |
CN104201634A (zh) | 一种单回线路交叉开断方法 | |
CN205116866U (zh) | 输电线路电缆终端立体引下装置 | |
CN203536911U (zh) | 双回高压线路穿越杆 | |
CN201509016U (zh) | 一种户外hgis设备配电装置结构 | |
CN204552245U (zh) | 一种导线垂直排列的特高压直流直线塔 | |
CN104314355A (zh) | 一种横担异形的t接钢管杆 | |
CN204497701U (zh) | 一种用于各种电压等级中送电线路的单回路穿越式钻越杆 | |
CN105155907A (zh) | 耐张塔 | |
CN104577929A (zh) | 双回高压线路穿越杆 | |
CN204552238U (zh) | 一种导线呈倒三角布置的复合横担直线塔 | |
CN201406865Y (zh) | 66kv架空输电线路双回水平穿越铁塔 | |
CN204754412U (zh) | 一种单侧横担同时下两回电缆的终端杆 | |
CN201319483Y (zh) | 电缆终端杆 | |
CN103354319B (zh) | 一种220千伏户外gis双飞蜓出线布置结构 | |
CN205489247U (zh) | 一种用于500kV及以下电压等级的品字型GIS出线布置结构 | |
CN205791186U (zh) | Gis配电装置端部出线结构 | |
CN104538850A (zh) | 一种1000kV变电站的三相管母线垂直结构 | |
CN104563577A (zh) | 高压线路双t杆 | |
CN103972836A (zh) | 一种输电线路钻越方法 | |
CN205489250U (zh) | 进出线构架合并的gis配电装置布置结构 | |
CN204391660U (zh) | 一种高压输电线路单回耐张杆塔导地线布置系统 | |
CN201444578U (zh) | 变压器避雷保护装置 | |
CN207459403U (zh) | 一种紧凑型330kV变电站GIS的垂直出线结构 | |
CN206346561U (zh) | 一种单回路垂直排列耐张塔 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150429 |