CN203536110U - Assembly line for producing multi-core cable - Google Patents

Assembly line for producing multi-core cable Download PDF

Info

Publication number
CN203536110U
CN203536110U CN201320669628.1U CN201320669628U CN203536110U CN 203536110 U CN203536110 U CN 203536110U CN 201320669628 U CN201320669628 U CN 201320669628U CN 203536110 U CN203536110 U CN 203536110U
Authority
CN
China
Prior art keywords
line
cable
sheathing machine
vertical bag
pay
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320669628.1U
Other languages
Chinese (zh)
Inventor
高士红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Wei Gesi Electric Applicance Co Ltd
Original Assignee
Wuxi Wei Gesi Electric Applicance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Wei Gesi Electric Applicance Co Ltd filed Critical Wuxi Wei Gesi Electric Applicance Co Ltd
Priority to CN201320669628.1U priority Critical patent/CN203536110U/en
Application granted granted Critical
Publication of CN203536110U publication Critical patent/CN203536110U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Manufacturing Of Electric Cables (AREA)

Abstract

The utility model discloses an assembly line for producing a multi-core cable. The assembly line comprises a line pair laying frame, a wiring plate, a polyester band frame, an aluminium band frame, a longitudinal warpping bench, a sheathing machine, a cooling water tank and a finished cable reel. The line pair laying frame is transversely disposed in front of the wiring plate. The polyester band frame is longitudinally disposed at a certain position of the side edge of the wiring plate. The aluminium band frame is longitudinally disposed at a certain position of the side edge of the polyester band frame. The longitudinal warpping bench is transversely disposed behind the wiring plate. The sheathing machine is transversely disposed behind the longitudinal warpping bench. The cooling water tank is transversely disposed behind the sheathing machine. A caterpillar tractor is disposed behind the cooling water tank. The finished cable reel is disposed behind the caterpillar tractor. The assembly line combines two processes of cabling twisting and sheath coverage of a multi-core cable as one, so that occupied space of a cabling device is reduced, damages to the cable cores longitudinally warped with the polyester band and the aluminium band in the transport process are prevented, operation time is saved, and production efficiency is greatly improved.

Description

A kind of streamline for the production of multicore cable
Technical field
The utility model relates to cable process equipment field, is specifically related to a kind of streamline for the production of multicore cable.
Background technology
Multicore cable is exactly the power cable of many wires, refers to the solid polyolefin insulation moisture-proof layer of copper core polythene jacket cable, is widely used in metropolitan area power construction, to make somebody a mere figurehead with pipeline, is installed as master, main transmission of electric signals.In recent years, along with socioeconomic development, industry and civil electrical equipment are constantly progressive with surprising rapidity especially, and the demand of thing followed multicore cable also increases year by year.
Yet, in prior art, to multicore cable production system, be: first each line is formed to cable core to being through stranded on cabler and vertical bag polyester belt, be wound on a cable hank, and then be transported to the coating that completes sheath on sheathing line.The traditional handicraft that such stranding and sheath operation are separately carried out, when the cable of multicore is more produced, it is low especially that efficiency seems, not only taken cabler, and wasted man-hour.
Utility model content
For solving the problems of the technologies described above, we have proposed a kind of streamline of the production multicore cable that the stranded and sheath coating two procedures of stranding is united two into one, can save labour turnover, enhanced productivity.
For achieving the above object, the technical solution of the utility model is as follows:
For the production of a streamline for multicore cable, by line, pay off rack, mistake line plate, polyester tape holder, aluminium strip frame, vertical bag platform, sheathing machine, bosh and finished cable dish are formed; Described line is laterally located at the described line plate the place ahead of crossing to pay off rack; Described polyester tape holder is longitudinally located at the described certain position of line plate side of crossing; Described aluminium strip frame is longitudinally located at the certain position of described polyester tape holder side; Described vertical bag platform is laterally located at described mistake after line plate; Described sheathing machine is laterally located at after described vertical bag platform; Described bosh is laterally located at after described sheathing machine; Described caterpillar-tractor is located at after described bosh; Described finished cable dish is located at after described caterpillar-tractor.
Preferably, described line comprises support and several actinobacillus wheels to pay off rack; Described actinobacillus wheel divides upper and lower two-layer being located on described support.
Preferably, described pay off rack, mistake line plate, polyester tape holder, aluminium strip frame, vertical bag platform, sheathing machine, bosh and finished cable dish are arranged at sustained height.
By technique scheme, the utility model, by each line of multicore cable is formed after cable core being through stranded on cabler and vertical bag polyester belt, is no longer wound on cable hank, but is delivered directly to the coating that completes sheath on sheathing line; Stranded and the sheath coating two procedures of the stranding of multicore cable is united two into one, not only reduced taking of cabling device, avoid, in intermediate transportation, the cable core of vertical bag polyester belt and aluminium strip is caused to damage, but also saved man-hour, greatly improved production efficiency.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skills, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the structural representation of the disclosed a kind of streamline for the production of multicore cable of the utility model embodiment.
Numeral and the represented corresponding component title of letter in figure:
1. line is crossed the vertical bag platform of line plate 3. polyester tape holder 4. aluminium strip frame 5. 6. sheathing machine 7. bosh 8. caterpillar-tractor 9. finished cable dishes to pay off rack 11. support 12. actinobacillus wheels 2.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the present invention's part embodiment, rather than whole embodiment.Embodiment based in the present invention, those of ordinary skills are not making the every other embodiment obtaining under creative work prerequisite, all belong to the scope of the utility model protection.
The utility model provides a kind of streamline for the production of multicore cable, its operation principle is by each line of multicore cable is formed after cable core being through stranded on cabler and vertical bag polyester belt, no longer be wound on cable hank, but be delivered directly to the coating that completes sheath on sheathing line; Stranded and the sheath coating two procedures of the stranding of multicore cable is integrated.
Below in conjunction with embodiment and embodiment, the utility model is described in further detail.
Embodiment.
As shown in Figure 1, a kind of streamline for the production of multicore cable, is comprised of pay off rack 1, mistake line plate 2, polyester tape holder 3, aluminium strip frame 4, vertical bag platform 5, sheathing machine 6, bosh 7, caterpillar-tractor 8 and finished cable dish 9 line; Described line is laterally located at described line plate 2 the place aheads of crossing to pay off rack 1; Described polyester tape holder 3 is longitudinally located at the described certain position of line plate 2 sides of crossing; Described aluminium strip frame 4 is longitudinally located at the certain position of described polyester tape holder 3 sides; Described vertical bag platform 5 is laterally located at described mistake after line plate 2; Described sheathing machine 6 is laterally located at after described vertical bag platform 5; Described bosh 7 is laterally located at after described sheathing machine 6; Described caterpillar-tractor 8 is located at after described bosh 7; Described finished cable dish 9 is located at after described caterpillar-tractor 8.Wherein, described line comprises support 11 and several actinobacillus wheels 12,12 minutes upper and lower two-layer being located on described support 11 of described actinobacillus wheel to pay off rack 1; Described line is arranged at sustained height to pay off rack 1, mistake line plate 2, polyester tape holder 3, aluminium strip frame 4, vertical bag platform 5, sheathing machine 6, bosh 7, caterpillar-tractor 8 and finished cable dish 9.
Operation principle and the production process of a kind of streamline for the production of multicore cable of the present utility model are: as shown in Figure 1, first by each copper core to the actinobacillus wheel 12 support 11 of pay off rack 1 being pulled out from being positioned at line, passed line plate 2 it is parallel separately, polyester belt and aluminium strip on polyester tape holder 3 and aluminium strip frame 4 pulled out with identical speed simultaneously, enter on vertical bag platform 5 and carry out stranded and vertical bag polyester belt and aluminium strip to crossing line plate 2 copper core out, then after vertical bag polyester belt and aluminium strip, copper core carries out the operation of sheath operation entering sheathing machine 6; After sheath, cable is because peripheral sizing material is warmmer, so enter bosh 7, carry out cooling processing, cooled cable is transported to finished cable dish 9 again after the traction of caterpillar-tractor 8, at finished cable dish 9, cable is rolled and obtained cable finished product.
By technique scheme, the utility model, by each line of multicore cable is formed after cable core being through stranded on cabler and vertical bag polyester belt, is no longer wound on cable hank, but is delivered directly to the coating that completes sheath on sheathing line; Stranded and the sheath coating two procedures of the stranding of multicore cable is integrated, not only reduced cabling device and taken, avoid, in intermediate transportation, the cable core of vertical bag polyester belt and aluminium strip is caused to damage, but also saved man-hour, greatly improved production efficiency.
Above-mentioned explanation to disclosed a kind of streamline embodiment for the production of multicore cable, makes professional and technical personnel in the field can realize or use the present invention.To the multiple modification of these embodiment, will be apparent for those skilled in the art, General Principle as defined herein can, in the situation that not departing from the spirit or scope of the present invention, realize in other embodiments.Therefore, the present invention will can not be restricted to these embodiment shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (3)

1. for the production of a streamline for multicore cable, it is characterized in that, by line, pay off rack, mistake line plate, polyester tape holder, aluminium strip frame, vertical bag platform, sheathing machine, bosh and finished cable dish are formed; Described line is laterally located at the described line plate the place ahead of crossing to pay off rack; Described polyester tape holder is longitudinally located at the described certain position of line plate side of crossing; Described aluminium strip frame is longitudinally located at the certain position of described polyester tape holder side; Described vertical bag platform is laterally located at described mistake after line plate; Described sheathing machine is laterally located at after described vertical bag platform; Described bosh is laterally located at after described sheathing machine; Caterpillar-tractor is located at after described bosh; Described finished cable dish is located at after described caterpillar-tractor.
2. a kind of streamline for the production of multicore cable according to claim 1, is characterized in that, described line comprises support and several actinobacillus wheels to pay off rack; Described actinobacillus wheel divides upper and lower two-layer being located on described support.
3. a kind of streamline for the production of multicore cable according to claim 1, is characterized in that, described line is arranged at sustained height to pay off rack, mistake line plate, polyester tape holder, aluminium strip frame, vertical bag platform, sheathing machine, bosh and finished cable dish.
CN201320669628.1U 2013-10-28 2013-10-28 Assembly line for producing multi-core cable Expired - Fee Related CN203536110U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320669628.1U CN203536110U (en) 2013-10-28 2013-10-28 Assembly line for producing multi-core cable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320669628.1U CN203536110U (en) 2013-10-28 2013-10-28 Assembly line for producing multi-core cable

Publications (1)

Publication Number Publication Date
CN203536110U true CN203536110U (en) 2014-04-09

Family

ID=50422291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320669628.1U Expired - Fee Related CN203536110U (en) 2013-10-28 2013-10-28 Assembly line for producing multi-core cable

Country Status (1)

Country Link
CN (1) CN203536110U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105023652A (en) * 2015-08-19 2015-11-04 刘鲸 Cable forming system
CN105312900A (en) * 2014-05-30 2016-02-10 万向荣 Assembly line for producing extension-type flat tubes
CN114571701A (en) * 2022-03-15 2022-06-03 苏州君思琦线缆科技有限公司 Cooling forming device for processing cable core wire jacket

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105312900A (en) * 2014-05-30 2016-02-10 万向荣 Assembly line for producing extension-type flat tubes
CN105312900B (en) * 2014-05-30 2019-04-23 万向荣 A kind of assembly line producing the flat pipe of telescopic scrolling
CN105023652A (en) * 2015-08-19 2015-11-04 刘鲸 Cable forming system
CN114571701A (en) * 2022-03-15 2022-06-03 苏州君思琦线缆科技有限公司 Cooling forming device for processing cable core wire jacket
CN114571701B (en) * 2022-03-15 2023-11-14 苏州君思琦线缆科技有限公司 Cooling forming device for processing cable core wire sheath

Similar Documents

Publication Publication Date Title
CN203536110U (en) Assembly line for producing multi-core cable
CN102842385A (en) Integrated production method of cable
CN110797141A (en) Wear-resistant anti-dragging heat dissipation type multifunctional cable for charging electric automobile and manufacturing method
CN202221676U (en) HYA type city call cable production system of 20 or below 20 pairs
CN204945453U (en) Covered wire cable production line
CN201142242Y (en) Railway turnout transverse connection cable
CN203311878U (en) AC charging connection flat cable for electromobile
CN203351269U (en) Alternating current charging circular cable of electromobile
CN106024128A (en) Novel high-temperature-resistant compressive cable
CN204108800U (en) Tinned wird polishing machine
CN203338861U (en) Item shielding mobile control cable
CN211455389U (en) Submarine cable production line
CN203491006U (en) Aluminum-alloy cable special for frequency converter
CN202487276U (en) Ultrahigh-voltage composite aluminum-plastic tape longitudinally-wrapped copper wire-shielded power cable
CN105895208A (en) High-temperature-resistant flat cable
CN104538123A (en) Cabling machine suitable for layered stranding
CN109723252A (en) It is a kind of for producing the synthesis workshop of power cable and Plastic-sheathed Cable
CN202940067U (en) Cable traction accessory
CN203612484U (en) Revolving disc lifting frame
CN111508659A (en) A kind of winding drainage wire multi-layer shielded control cable and production method
CN202855353U (en) Soft portable flat network cable
CN203596190U (en) Night vision easy-fold compression resistant conveying device
CN203242376U (en) Movable flexible cable for overhead travelling crane
CN203205115U (en) Self-supporting type data cable
CN202339722U (en) Multi-core coaxial cable

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140409

Termination date: 20161028

CF01 Termination of patent right due to non-payment of annual fee