CN203514352U - Connection structure of upper portion and middle of glass fiber reinforced plastics inspection well - Google Patents

Connection structure of upper portion and middle of glass fiber reinforced plastics inspection well Download PDF

Info

Publication number
CN203514352U
CN203514352U CN201320653149.0U CN201320653149U CN203514352U CN 203514352 U CN203514352 U CN 203514352U CN 201320653149 U CN201320653149 U CN 201320653149U CN 203514352 U CN203514352 U CN 203514352U
Authority
CN
China
Prior art keywords
inspection well
reinforced plastics
glass fiber
fiber reinforced
upper portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320653149.0U
Other languages
Chinese (zh)
Inventor
陈新栓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEBEI ACME ZHONGYI COMPOSITE MATERIAL Co Inc
Original Assignee
HEBEI ACME ZHONGYI COMPOSITE MATERIAL Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEBEI ACME ZHONGYI COMPOSITE MATERIAL Co Inc filed Critical HEBEI ACME ZHONGYI COMPOSITE MATERIAL Co Inc
Priority to CN201320653149.0U priority Critical patent/CN203514352U/en
Application granted granted Critical
Publication of CN203514352U publication Critical patent/CN203514352U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Moulding By Coating Moulds (AREA)

Abstract

A connection structure of the upper portion and the middle of a glass fiber reinforced plastics inspection well solves the problem that installation of the inspection well is low in speed and efficiency. The technical scheme includes that the connection structure of the upper portion and the middle of the glass fiber reinforced plastics inspection well is used on the bottom end of the upper portion and the top end of the middle of the glass fiber reinforced plastics inspection well, the bottom end of the upper portion of the glass fiber reinforced plastics inspection well is connected with the top end of the middle of the glass fiber reinforced plastics inspection well, and the key is that the connection structure comprises an inserting groove which is of diameter variation structure and formed in the top end of the middle of the glass fiber reinforced plastics inspection well, an adhesive layer is arranged in the inserting groove, and the bottom end of the upper portion of the glass fiber reinforced plastics inspection well, which is of tubular structure, is inserted into the top end of the middle of the glass fiber reinforced plastics inspection well in gluing mode. The connection structure of the upper portion and the middle of the glass fiber reinforced plastics inspection well has the advantages of being convenient to install, and saving installation time and improving installation efficiency due to the fact that the upper portion of the inspection well is directly inserted into the middle of the inspection well in gluing mode.

Description

A kind of top of fiber glass reinforced plastics inspection well and the syndeton at middle part
Technical field
The utility model belongs to municipal engineering field, relates to a kind of syndeton of top and middle part of fiber glass reinforced plastics inspection well, particularly a kind of top of fiber glass reinforced plastics inspection well and syndeton at middle part that improves installation effectiveness.
Background technology
In the draining of municipal engineering, blowdown pipelines, manhole is a kind of important equipment, in checking pipeline, dredging pipeline, there is important effect, but, existing manhole adopts stone or brick one-tenth more, and the manhole speed of application of stone or brick one-tenth is slow, need the time of two weeks to month, difficulty of construction is large.
Summary of the invention
The utility model object is to overcome the deficiencies in the prior art, has designed a kind of easy for installationly, saves the top of fiber glass reinforced plastics inspection well and the syndeton at middle part of set-up time, and the speed of application that has solved manhole is slow, inefficient problem.
The utility model is that the technical scheme that realizes goal of the invention employing is, a kind of top of fiber glass reinforced plastics inspection well and the syndeton at middle part, the bottom that comprises top, the top at middle part, the bottom on top is connected with the top at middle part, key is: described syndeton comprises the slot of top, the middle part setting with variable-diameter structure, the adhesive layer in slot, and the bottom grafting with the top of tubular structure is adhesive in the top at middle part.
Operating principle of the present utility model is that in the middle part of the bottom on the top of manhole is plugged into,, on the slot on top, the adhesive layer of slot is fixed together top and middle part firmly, connects very convenient.
The beneficial effects of the utility model are, quick and easy for installation, have reduced the set-up time, have greatly improved installation effectiveness.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In accompanying drawing, 1 represents top, and 2 represent middle part, and 3 represent adhesive layer, and 4 represent slot.
The specific embodiment
A kind of top of fiber glass reinforced plastics inspection well and the syndeton at middle part, the bottom that comprises top 1, the top at middle part 2, the bottom on top 1 is connected with the top at middle part 2, key is: described syndeton comprises the slot 4 of the middle part 2 tops settings with variable-diameter structure, at the adhesive layer 3 of 4 li of slots, the bottom grafting with the top 1 of tubular structure is adhesive in the top at middle part 2.
The thickness of described adhesive layer 3 is 0.2-1cm.
Described top 1 is cylindric, and diameter is 700mm.
The variable-diameter structure that described middle part 2 is formed in one, maximum diameter is 1400-1600mm.The utility model is when concrete use, and manhole installation personnel, directly pegs graft the bottom on manhole top to be glued to the top at middle part, installs very convenient.

Claims (4)

1. the top of a fiber glass reinforced plastics inspection well and the syndeton at middle part, the bottom that comprises top (1), the top at middle part (2), the bottom on top (1) is connected with the top of middle part (2), it is characterized in that: described syndeton comprises the slot (4) of top, middle part (2) setting with variable-diameter structure, at the inner adhesive layer (3) of slot (4), the bottom grafting with the top (1) of tubular structure is adhesive in the top at middle part (2).
2. the top of a kind of fiber glass reinforced plastics inspection well according to claim 1 and the syndeton at middle part, is characterized in that: the thickness of described adhesive layer (3) is 0.2-1cm.
3. the top of a kind of fiber glass reinforced plastics inspection well according to claim 1 and the syndeton at middle part, is characterized in that: described top (1) is for cylindric, and diameter is 700mm.
4. the top of a kind of fiber glass reinforced plastics inspection well according to claim 1 and the syndeton at middle part, is characterized in that: the variable-diameter structure that described middle part (2) are formed in one, maximum diameter is 1400-1600mm.
CN201320653149.0U 2013-10-22 2013-10-22 Connection structure of upper portion and middle of glass fiber reinforced plastics inspection well Expired - Fee Related CN203514352U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320653149.0U CN203514352U (en) 2013-10-22 2013-10-22 Connection structure of upper portion and middle of glass fiber reinforced plastics inspection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320653149.0U CN203514352U (en) 2013-10-22 2013-10-22 Connection structure of upper portion and middle of glass fiber reinforced plastics inspection well

Publications (1)

Publication Number Publication Date
CN203514352U true CN203514352U (en) 2014-04-02

Family

ID=50373307

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320653149.0U Expired - Fee Related CN203514352U (en) 2013-10-22 2013-10-22 Connection structure of upper portion and middle of glass fiber reinforced plastics inspection well

Country Status (1)

Country Link
CN (1) CN203514352U (en)

Similar Documents

Publication Publication Date Title
CN203965113U (en) A kind of pipeline pressure testing device
CN103423515A (en) Circular tube clamping sleeve
CN203514352U (en) Connection structure of upper portion and middle of glass fiber reinforced plastics inspection well
CN203880273U (en) Split type flange
CN204213510U (en) Two O type circle socket joint thread connection set
CN203514487U (en) Bottom seat structure of glass fiber reinforced plastics inspection well
CN202647039U (en) Socket locking device for glass fiber reinforced plastic pipe
CN202129089U (en) Specimen transferring device
CN206513968U (en) The more piece water pipe structure of installation easy to disassemble
CN204112185U (en) Carbon fiber card fourth
CN203569669U (en) Middle structure of glass reinforced plastic inspection well
CN203626225U (en) Structure for connecting scaffold with wall
CN203755522U (en) Building reinforcing brick
CN204941015U (en) A kind of moveable assembled flag platform
CN102936954A (en) Method and structure for plugging pipeline floor hole
CN202073230U (en) Novel building block
CN202432092U (en) Operating hand wheel mechanism of valve driving switch
CN202879032U (en) Multifunctional set square
CN202809652U (en) Modularization plastic inspection well seat
CN203049831U (en) Anti-seismic wall body structure
CN202580351U (en) Oil pipe assembly
CN201448547U (en) Elbow with feet
CN202194150U (en) Base structure for integrated bamboo house
CN202658615U (en) Unplasticized polyvinyl chloride (UPVC) electroosmosis well point pipe
CN203215143U (en) Connecting structure for air conditioner pipes

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140402

Termination date: 20191022