CN202194150U - Base structure for integrated bamboo house - Google Patents

Base structure for integrated bamboo house Download PDF

Info

Publication number
CN202194150U
CN202194150U CN2011203288667U CN201120328866U CN202194150U CN 202194150 U CN202194150 U CN 202194150U CN 2011203288667 U CN2011203288667 U CN 2011203288667U CN 201120328866 U CN201120328866 U CN 201120328866U CN 202194150 U CN202194150 U CN 202194150U
Authority
CN
China
Prior art keywords
steel pipe
bamboo
concrete
bamboo beam
base structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011203288667U
Other languages
Chinese (zh)
Inventor
陈杰
罗莹英
满棠
吴志堂
徐文君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANJI CULTURE PRESS AND PUBLICATION BUREAU
Original Assignee
ANJI CULTURE PRESS AND PUBLICATION BUREAU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANJI CULTURE PRESS AND PUBLICATION BUREAU filed Critical ANJI CULTURE PRESS AND PUBLICATION BUREAU
Priority to CN2011203288667U priority Critical patent/CN202194150U/en
Application granted granted Critical
Publication of CN202194150U publication Critical patent/CN202194150U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to a connecting structure, in particular to a base structure for an integrated bamboo house. The base structure for the integrated bamboo house comprises concrete, bolts, a steel pipe and a bamboo beam, wherein the bamboo beam is matched with the steel pipe, the inner end of the steel pipe is fixed inside the concrete, and the outer end of the steel pipe stretches out of the concrete; one end of the bamboo beam is vertically embedded inside the steel pipe; and the bolts penetrate through the outer end of the steel pipe and the bamboo beam inside the steel pipe transversely and fix the outer end of the steel pipe and the end part of the bamboo beam. The base structure is novel; and by adopting the base structure, the connection of the bamboo beam and the concrete is very convenient and firm.

Description

A kind of foundation structure that is used on the bamboo integrated room
Technical field
The utility model relates to a kind of syndeton, particularly relates to a kind of foundation structure that is used on the bamboo integrated room.
Background technology
Bamboo integrated room just has by the potentiality of people's wide popularization and application because its green cleans.And in building bamboo integrated room process, especially bamboo integrated room is used in the city, such as the bamboo telephone booth of building, integrated room such as bamboo newsstand exists how the bamboo beam is connected this difficult problem with concrete bottom always.Therefore, a kind of being used on the bamboo integrated room is that to promote bamboo integrated room crucial in urban applications with bamboo beam and concrete syndeton.
Summary of the invention
The goal of the invention of the utility model provides a kind of novel structure, and simple installation is firm, the foundation structure between bamboo beam and the concrete.
The utility model the technical scheme that will adopt be:
A kind of foundation structure that is used on the bamboo integrated room comprises concrete, bolt, steel pipe and the bamboo beam that matches with steel pipe, and steel pipe the inner is fixed in the concrete, and concrete is stretched out in the outer end; Bamboo beam one end vertically is embedded in the steel pipe, bolt laterally run through the steel pipe outer end with and interior bamboo beam and steel pipe outer end and bamboo beam end fixed.
As preferably, described bolt has 2-4.
Adopt the foundation structure of technique scheme, comprise concrete, bolt, steel pipe and the bamboo beam that matches with steel pipe, steel pipe the inner is fixed in the concrete, and concrete is stretched out in the outer end; Bamboo beam one end vertically is embedded in the steel pipe, and the bamboo beam is to be connected with concrete through steel pipe, and then with bolt laterally run through the steel pipe outer end with and interior bamboo beam fix.This foundation structure is not only novel, and makes that connection is very easy firmly between bamboo beam and the concrete.
Description of drawings
Fig. 1: the structural representation of the utility model embodiment.
The specific embodiment
Be to combine the technical scheme of 1 pair of the utility model of accompanying drawing to do to describe in further detail below.
Embodiment: a kind of foundation structure that is used on the bamboo integrated room as shown in Figure 1; Comprise concrete 1, bolt 5, steel pipe 2 and the bamboo beam 3 that matches with steel pipe; The installing hole that is complementary with steel pipe 2 external diameters is set on the concrete 1, and steel pipe 2 inner insertion installing holes are also fixing within it; Concrete 1 is stretched out in the outer end; Bamboo beam 3 is inserted in the steel pipe 2 with its coupling again; Be that the one of which end vertically is embedded in the steel pipe 2; Two bolts 5 laterally run through steel pipe 2 outer ends with and interior bamboo beam 3 and steel pipe 2 outer ends and bamboo beam 3 ends are fixed; Specifically be that bamboo beam 3 one ends are in the bamboo beam 3 bottom embedding steel pipes 2 as shown in Figure 1, and be that the upper end of stretching out concrete 1 among Fig. 1 is provided with the installing hole 2a that supplies the screw rod in the bolt 5 to wear that bamboo beam 2 bottoms also correspondence are provided with installing hole 3a in steel pipe 2 outer ends; Screw rod laterally runs through the installing hole 2a of steel pipe 2 outer ends and the installing hole 3a of bamboo beam 3 bottoms; Screw rod stretches out steel pipe side-walls cover connected nut 5a, and fastening nut 5a is bamboo beam 3 lengthwise positions fixedly, make that bamboo beam and concrete syndeton are more firm.Above-mentioned bolt can be selected 2-4 for use according to the length of steel pipe 2 outer ends.

Claims (2)

1. a foundation structure that is used on the bamboo integrated room is characterized in that comprising concrete, bolt, steel pipe and the bamboo beam that matches with steel pipe, and steel pipe the inner is fixed in the concrete, and concrete is stretched out in the outer end; Bamboo beam one end vertically is embedded in the steel pipe, bolt laterally run through the steel pipe outer end with and interior bamboo beam and steel pipe outer end and bamboo beam end fixed.
2. according to right 1 described a kind of foundation structure that is used on the bamboo integrated room, it is characterized in that described bolt has 2-4.
CN2011203288667U 2011-09-02 2011-09-02 Base structure for integrated bamboo house Expired - Fee Related CN202194150U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011203288667U CN202194150U (en) 2011-09-02 2011-09-02 Base structure for integrated bamboo house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011203288667U CN202194150U (en) 2011-09-02 2011-09-02 Base structure for integrated bamboo house

Publications (1)

Publication Number Publication Date
CN202194150U true CN202194150U (en) 2012-04-18

Family

ID=45949069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011203288667U Expired - Fee Related CN202194150U (en) 2011-09-02 2011-09-02 Base structure for integrated bamboo house

Country Status (1)

Country Link
CN (1) CN202194150U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638255A (en) * 2017-01-10 2017-05-10 重庆交通大学 Modern bamboo pedestrian cantilever beam bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106638255A (en) * 2017-01-10 2017-05-10 重庆交通大学 Modern bamboo pedestrian cantilever beam bridge
CN106638255B (en) * 2017-01-10 2018-03-09 重庆交通大学 A kind of modern bamboo figure's row cantilever glider bridge

Similar Documents

Publication Publication Date Title
KR100917394B1 (en) Non-excavating type supporter for heavy communication cable
CN202194150U (en) Base structure for integrated bamboo house
CN201406586Y (en) Clothes-horse
CN202032221U (en) Insertion type pipeline joint
CN204089082U (en) Lighting proof strip device
CN204493900U (en) A kind of plastic draining pipe fixing device
CN203809862U (en) Right angle type pipeline fixing support
CN206800452U (en) A kind of assembled pipe gallery support of industrialized production
CN204139552U (en) A kind of tubulose decorative thread
CN203892754U (en) Universal round tube connector
CN209924081U (en) Novel pre-buried sleeve for building water supply and drainage
CN205296204U (en) Foundation structure of light pole basic station
CN202812478U (en) Pipe clamp structure
CN203891423U (en) Multifunctional supporting profile assembly of same-floor drainage toilet
CN203036112U (en) Hollow-wall tubing
CN204876527U (en) Novel building scaffold supports device
CN203891450U (en) Threaded rod rapid connecting part
CN201671929U (en) Adjustable hook screw
CN202672588U (en) Mounting bracket structure for wall heat-preserving decorative plate
CN203906315U (en) Deep-well pump
CN204901065U (en) Steel construction building body and pipeline fixing device thereof
CN201916607U (en) Underground pipeline
CN203463784U (en) Integrated object-placing table of bibcock
CN201448547U (en) Elbow with feet
CN201038692Y (en) Elbow of plastic alloy elbow joint device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120418

Termination date: 20120902