CN203513222U - Convertor station capacitor maintaining platform car - Google Patents

Convertor station capacitor maintaining platform car Download PDF

Info

Publication number
CN203513222U
CN203513222U CN201320563685.1U CN201320563685U CN203513222U CN 203513222 U CN203513222 U CN 203513222U CN 201320563685 U CN201320563685 U CN 201320563685U CN 203513222 U CN203513222 U CN 203513222U
Authority
CN
China
Prior art keywords
platform car
convertor station
maintaining platform
station capacitor
storage battery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320563685.1U
Other languages
Chinese (zh)
Inventor
叶立刚
曹忠平
陈师宽
汪振宇
刘斌
张海龙
占文华
吴胜利
牛海礁
张烈
徐新尧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Eastern Inner Mongolia Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Eastern Inner Mongolia Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Eastern Inner Mongolia Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201320563685.1U priority Critical patent/CN203513222U/en
Application granted granted Critical
Publication of CN203513222U publication Critical patent/CN203513222U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

The utility model relates to electrical equipment and materials, in particular to a convertor station capacitor maintaining platform car. The convertor station capacitor maintaining platform car comprises a lifting frame (4) and a storage battery (9), wherein a safety fence (5) is arranged at the upper end of the lifting frame (4). The convertor station capacitor maintaining platform car is characterized in that one side of the safety fence (5) is provided with an elongated cantilever bridge (6). The convertor station capacitor maintaining platform car has the advantages that a capacitor can slide through the cantilever bridge, the convertor station capacitor maintaining platform car is light and small in operation space and saves labor, installation and replacement are facilitated, the swaying frequency is reduced, the replacement time is shortened by more than 60%, the power consumption is reduced remarkably, the electrical loss of the storage battery is avoided by adopting a heat-preservation measure, and the convertor station capacitor maintaining platform car can perform continuous operation in a strong-wind severe-cold environment and can serve as a necessary device for maintenance of a northern convertor station capacitor.

Description

Current conversion station cond maintenance platform car
Technical field
The utility model relates to a kind of power equipment, i.e. a kind of current conversion station cond maintenance platform car.
Background technology
On the cond tower of current conversion station, multi-layer capacitor is installed, every layer of cond that all has polylith to install side by side, the installation of cond is scolded and changed is a routine work of current conversion station.At present, replacing cond is installed and need to be used special-purpose lifting platform truck.Lifting platform truck is provided with crane, safety guard and hanging device.During operation, at least need two people operation that raises, the cond movement of slinging, install or change.Because lifting load is large, the intensity of existing lifting platform truck is obviously inadequate, and particularly, when wind is large, easily wigwag motion, very dangerous.Because cond is placed side by side, during lifting, easily collide adjacent cond, thereby must be slowly careful, require great effort time-consuming, in the winter of the large cold of wind, changing single cond at least needs 6 hours.In addition, this lifting platform truck be take storage battery as operation power supply, because working load is large, power consumption is more, in addition cold season storage battery electricity damage amount large, and can not on-the-spot charge, the electric weight of storage battery often can not meet the demand of construction, often because of the operation of charging Halfway Stopping.
Summary of the invention
The purpose of this utility model is to provide a kind of cond and moves laborsavingly flexibly, install to change rapidly, and little power consumption, storage battery damages little, cond maintenance platform car that can long-time continuous operation under the large severe cold condition of wind.
Above-mentioned purpose is realized by following technical scheme: develop a kind of current conversion station cond maintenance platform car, comprise crane and storage battery, crane upper end is provided with safety guard, is characterized in: said safety guard one side is provided with the cantilever bridge of strip.
Respectively there is a frame said cantilever bridge both sides, between frame, by rotating shaft, branched running roller are installed, and one end of frame is hinged on the lower frame of safety guard by rotating shaft.
Said storage battery is contained in vehicle-mounted switchgear building the inside, and switchgear building is provided with heat-insulation layer around, and switchgear building the inside is provided with electric heater.
The beneficial effects of the utility model are: cond slides by cantilever bridge, working load reduces, Portable power saving, has alleviated and has waved, and is convenient to install change, change time decreased more than 60%, consumption of current significantly reduces, and adopts Insulation in addition, avoids storage battery to damage, the battery-operated time significantly extends, and is expected to become the preferred unit that under strong wind severe cold environment, current conversion station cond is safeguarded.
Accompanying drawing explanation
Fig. 1 is the front view of a kind of embodiment;
Fig. 2 is the parts safety guard of this embodiment and the front view of cantilever bridge;
Fig. 3 is the parts safety guard of this embodiment and the birds-eye view of cantilever bridge;
Fig. 4 is the part sectional view of the parts switchgear building of this embodiment;
Fig. 5 is the parts operating condition figure of this embodiment.
Visible in figure: operator's compartment 1, wheel 2, compartment 3, crane 4, safety guard 5, cantilever bridge 6, frame 7, running roller 8, storage battery 9, switchgear building 10, heat-insulation layer 11, cond 12, pylon 13, electric heater 14.
The specific embodiment
The total design of the utility model is at current conversion station cond, the cantilever bridge with sliding translation in Renewal process to be installed to substitute original hanging device, has taked accumulator cell heat preserving measure simultaneously, has solved existing installation and has easily waved, the problems such as time-consuming, power shortage of requiring great effort.Below in conjunction with accompanying drawing, introduce a kind of embodiment:
As shown in Figure 1, this current conversion station cond maintenance platform car is also a vehicle, has operator's compartment 1, wheel 2 and compartment 3, compartment 3 is provided with crane 4 above, safety guard 5 is equipped with in crane 4 upper ends, and crane 4 is handled by hydraulic ram, and this and existing lifting platform truck are basic identical.Difference is, in a side of safety guard 5, to be provided with the cantilever bridge 6 of strip.Visible in conjunction with Fig. 2 Fig. 3: respectively there is a frame 7 cantilever bridge 6 both sides, between frame 7, by rotating shaft, branched running roller 8 is installed, the inner of frame 7 is hinged on the lower frame of safety guard 5 by rotating shaft.At ordinary times, cantilever bridge 6 can be folded on safety guard 5.During operation, as shown in Figure 5, open cantilever bridge 6, its outer end be overlapped on cond pylon 13, cond 12 just can be on the running roller 8 of cantilever bridge 6 pull, very laborsaving.Because cond 12 is a plurality of installations side by side, adopt the mode of lifting should consume very large electric energy, the easy adjacent cond of scratching again, operation easier is large, the space needing is also larger, and existing safety guard seems very little, but also can rock, abnormally dangerous, generally changing a cond 12 needs 6 hours.After adopting the equipment of this translation, needed operational space is very little, and the load of crane 4 is also little many, no longer waves, and the replacing of single cond only needs 2 hours.
In addition, storage battery 9 has also been taked to Insulation, as shown in Figure 4, the switchgear building 10 that compartment 3 holds storage battery 9 around adds the heat-insulation layer 11 that fire-retardant heat insulation cotton is made, and has increased electric heater 14 more than 250W.Electric heater 14 adopts the power supply of camp sites, can solve the loss of severe cold season storage battery completely fast, and there is the problem that can not charge at scene, makes the continuous operation for a long time of this equipment.

Claims (1)

1. a current conversion station cond maintenance platform car, comprise crane (4) and storage battery (9), crane (4) upper end is provided with safety guard (5), it is characterized in that: said safety guard (5) one sides are provided with the cantilever bridge (6) of strip, respectively there is a frame (7) cantilever bridge (6) both sides, between frame (7), by rotating shaft, branched running roller (8) is installed, one end of frame (7) is hinged on the lower frame of safety guard (5) by rotating shaft, storage battery (9) is arranged in vehicle-mounted switchgear building (10), switchgear building (10) is provided with heat-insulation layer (11) around, switchgear building (10) the inside is provided with electric heater (14).
CN201320563685.1U 2013-09-11 2013-09-11 Convertor station capacitor maintaining platform car Expired - Fee Related CN203513222U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320563685.1U CN203513222U (en) 2013-09-11 2013-09-11 Convertor station capacitor maintaining platform car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320563685.1U CN203513222U (en) 2013-09-11 2013-09-11 Convertor station capacitor maintaining platform car

Publications (1)

Publication Number Publication Date
CN203513222U true CN203513222U (en) 2014-04-02

Family

ID=50372181

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320563685.1U Expired - Fee Related CN203513222U (en) 2013-09-11 2013-09-11 Convertor station capacitor maintaining platform car

Country Status (1)

Country Link
CN (1) CN203513222U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105692513A (en) * 2016-04-12 2016-06-22 国网江苏省电力公司扬州供电公司 Shear-fork type insulation overhead work platform car
CN107555346A (en) * 2017-09-01 2018-01-09 宁波市鄞州诺亿电子元件厂 Transformer installation feeding device easy to remove
CN107571896A (en) * 2017-09-01 2018-01-12 宁波市鄞州诺亿电子元件厂 The transformer installation servicing unit that can be clamped
CN107572441A (en) * 2017-09-01 2018-01-12 宁波市鄞州诺亿电子元件厂 Transformer installation feeding device
CN113443584A (en) * 2021-04-22 2021-09-28 国网浙江省电力有限公司湖州供电公司 Valve tower single-module overhauling tool and overhauling method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105692513A (en) * 2016-04-12 2016-06-22 国网江苏省电力公司扬州供电公司 Shear-fork type insulation overhead work platform car
CN105692513B (en) * 2016-04-12 2018-07-31 国网江苏省电力有限公司扬州供电分公司 A kind of scissor-type insulation aerial working platform vehicle
CN107555346A (en) * 2017-09-01 2018-01-09 宁波市鄞州诺亿电子元件厂 Transformer installation feeding device easy to remove
CN107571896A (en) * 2017-09-01 2018-01-12 宁波市鄞州诺亿电子元件厂 The transformer installation servicing unit that can be clamped
CN107572441A (en) * 2017-09-01 2018-01-12 宁波市鄞州诺亿电子元件厂 Transformer installation feeding device
CN107555346B (en) * 2017-09-01 2021-06-08 宁波市鄞州诺亿电子元件厂 Transformer installation is with conveyor convenient to remove
CN113443584A (en) * 2021-04-22 2021-09-28 国网浙江省电力有限公司湖州供电公司 Valve tower single-module overhauling tool and overhauling method
CN113443584B (en) * 2021-04-22 2022-07-29 国网浙江省电力有限公司湖州供电公司 Valve tower single-module overhauling tool and overhauling method

Similar Documents

Publication Publication Date Title
CN203513222U (en) Convertor station capacitor maintaining platform car
CN204401793U (en) A kind of adjustable space mobile house
CN203086035U (en) Mobile box-type transformer substation
CN103117587B (en) A kind of super capacitor-type supply unit being applicable to looped network cabinet
CN202575753U (en) Slidable gantry crane
CN201656340U (en) Tool for replacing supporting insulator of high-voltage tube bus
CN202491718U (en) Movable ice-melting engineering vehicle
CN204597356U (en) A kind of electrical network emergency device
CN201252504Y (en) Integrated outdoor solar power cabinet
CN201884294U (en) Combined type mobile pump station
CN202383223U (en) Energy-saving remote detecting system for electrical load
CN212537719U (en) Integrated solar street lamp with replaceable battery
CN210040897U (en) Prefabricated cabin protective cover of energy storage power station
CN204046726U (en) A kind of power grid transmission line supervising device
CN207080579U (en) A kind of driven vehicle transmission device lubrication system
CN207250967U (en) A kind of outdoor water-proof anticorrosion switchgear
CN203593607U (en) Skid-mounted solar refueling device
CN201312070Y (en) Mobile micro electric station for tire crane to transform filed and cross street
CN106320753A (en) Safe rain shielding device for electric power construction
CN107947692B (en) Telescopic movable box type photovoltaic power station and control method thereof
CN204727595U (en) The separating explosion Cproof skid-mounted topping up device of a kind of wind-solar complementary type
CN207303844U (en) A kind of tractor of power line cable
CN202598364U (en) Solar illuminating device of henhouse
CN202370755U (en) Movable wind and solar hybrid power supply system
CN201270418Y (en) Box type high voltage passive automatic compensation apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140402

CF01 Termination of patent right due to non-payment of annual fee