CN203508313U - Device for taking tooling cover and blowing - Google Patents

Device for taking tooling cover and blowing Download PDF

Info

Publication number
CN203508313U
CN203508313U CN201320646825.1U CN201320646825U CN203508313U CN 203508313 U CN203508313 U CN 203508313U CN 201320646825 U CN201320646825 U CN 201320646825U CN 203508313 U CN203508313 U CN 203508313U
Authority
CN
China
Prior art keywords
cylinder
frame
fixed
vertical frame
folder bucket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201320646825.1U
Other languages
Chinese (zh)
Inventor
茆林凤
唐复胜
徐健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI SIFANG YOUXIN CO Ltd
Original Assignee
WUXI SIFANG YOUXIN CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI SIFANG YOUXIN CO Ltd filed Critical WUXI SIFANG YOUXIN CO Ltd
Priority to CN201320646825.1U priority Critical patent/CN203508313U/en
Application granted granted Critical
Publication of CN203508313U publication Critical patent/CN203508313U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Abstract

The utility model relates to a device for taking a tooling cover and blowing. The device is characterized in that a cover taking cylinder is fixed on a top frame of a stander; the cover taking cylinder is provided with a travel switch; an electromagnet is fixed at the end of a piston rod of the cover taking cylinder; a first barrel clamping cylinder, a second barrel clamping cylinder and a third barrel clamping cylinder are fixed on a front vertical rack and a rear vertical rack of the stander; three roller wheel racks are respectively fixed at the ends of piston rods of the first barrel clamping cylinder, the second barrel clamping cylinder and the third barrel clamping cylinder; a left roller wheel and a right roller wheel are respectively and rotatably erected on each roller wheel rack; a barrel support bracket is fixed under the stander; a first barrel support cylinder, a second barrel support cylinder and a third barrel support cylinder are fixed on the barrel support bracket; a first blowing cylinder and a first signal switch are fixed on the top frame of the stander on the right side of the cover taking cylinder; a second blowing cylinder and a second signal switch are fixed on the top frame of the stander on the right side of the first blowing cylinder; piston rods of the first blowing cylinder and the second blowing cylinder are respectively provided with a blowing pipe. The device has the advantages of being simple in structure, reliable to use, high in working efficiency, etc.

Description

Get frock lid and blowning installation
Technical field
The utility model relates to a kind of tubbing equipment, especially a kind of frock lid and blowning installation got.
Background technology
After steel drum has been produced, must carry out spray paint, when spray paint, need cover frock lid, in order to make to paint quick exsiccation, can dry temperature to the steel drum of spray paint and process, for the steel drum that makes to dry after temperature is quickly cooled to normal temperature, need to use blowning installation to blow, and in order to take off frock lid, need to get frock lid arrangement.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, provides a kind of frock of getting simple in structure, that use is reliable, operating efficiency is high to cover and blowning installation.
The technical scheme providing according to the utility model, described frock lid and the blowning installation got, it comprises portal frame, on the upper frame of frame, be fixed with to get and cover cylinder, get to cover and on cylinder, there is travel switch, be fixed with electromagnet getting the piston rod end of covering cylinder, in the front vertical frame of frame and rear vertical frame, be fixed with one group of first folder bucket cylinder, in the front vertical frame of frame and rear vertical frame, be fixed with one group of second folder bucket cylinder, in the front vertical frame of frame and rear vertical frame, be fixed with one group of the 3rd folder bucket cylinder, the installation site of the first folder bucket cylinder with get the installation site of covering cylinder and coordinate, at the first folder bucket cylinder, the piston rod end of the second folder bucket cylinder and the 3rd folder bucket cylinder is all fixed with a turning rolls, on each turning rolls, rotating turret is provided with two rollers in left and right, between the front vertical frame of frame and rear vertical frame, the lower position of middle part corresponding upper frame is fixed with prop barrel frame, on prop barrel frame, be fixed with the first prop barrel cylinder, the second prop barrel cylinder and the 3rd prop barrel cylinder, the installation site of the first prop barrel cylinder coordinates with the installation site of the first folder bucket cylinder, the installation site of the second prop barrel cylinder coordinates with the installation site of the second folder bucket cylinder, the installation site of the 3rd prop barrel cylinder coordinates with the installation site of the 3rd folder bucket cylinder, on the upper frame of getting the frame of covering cylinder right side, be fixed with the first air blowing cylinder and first signal switch, on the upper frame of the frame on the first air blowing cylinder right side, be fixed with the second air blowing cylinder and secondary signal switch, on the piston rod of the first air blowing cylinder and the second air blowing cylinder, gas blow pipe is all installed.
Described frame comprises upper frame, front vertical frame and rear vertical frame, and the top ends of front vertical frame and upper frame front are fixed along lower surface, and the top ends of rear vertical frame and upper frame back edge lower surface are fixed.
The utlity model has simple in structure, use reliable and operating efficiency advantages of higher.
Accompanying drawing explanation
Fig. 1 is front view of the present utility model.
Fig. 2 is left view of the present utility model.
Fig. 3 is top view of the present utility model.
Fig. 4 is stereogram of the present utility model.
The specific embodiment
Below in conjunction with specific embodiment, the utility model is described in further detail.
This gets frock lid and blowning installation, it comprises portal frame 1, on the upper frame of frame 1, be fixed with to get and cover cylinder 2, get to cover on cylinder 2 and there is travel switch, be fixed with electromagnet 3 getting the piston rod end of covering cylinder 2, in the front vertical frame of frame 1 and rear vertical frame, be fixed with one group of first folder bucket cylinder 4, in the front vertical frame of frame 1 and rear vertical frame, be fixed with one group of second folder bucket cylinder 5, in the front vertical frame of frame 1 and rear vertical frame, be fixed with one group of the 3rd folder bucket cylinder 6, the installation site of the first folder bucket cylinder 4 with get the installation site of covering cylinder 2 and coordinate, at the first folder bucket cylinder 4, the piston rod end of the second folder bucket cylinder 5 and the 3rd folder bucket cylinder 6 is all fixed with a turning rolls 7, on each turning rolls 7, rotating turret is provided with two rollers 8 in left and right, between the front vertical frame of frame 1 and rear vertical frame, the lower position of middle part corresponding upper frame is fixed with prop barrel frame 9, on prop barrel frame 9, be fixed with the first prop barrel cylinder, the second prop barrel cylinder and the 3rd prop barrel cylinder, the installation site of the first prop barrel cylinder coordinates with the installation site of the first folder bucket cylinder 4, the installation site of the second prop barrel cylinder coordinates with the installation site of the second folder bucket cylinder 5, the installation site of the 3rd prop barrel cylinder coordinates with the installation site of the 3rd folder bucket cylinder 6, on the upper frame of getting the frame 1 of covering cylinder 2 right sides, be fixed with the first air blowing cylinder 10 and first signal switch 11, on the upper frame of the frame 1 on the first air blowing cylinder 10 right sides, be fixed with the second air blowing cylinder 12 and secondary signal switch 13, on the piston rod of the first air blowing cylinder 10 and the second air blowing cylinder 12, gas blow pipe 14 is all installed.
Described frame 1 comprises upper frame, front vertical frame and rear vertical frame, and the top ends of front vertical frame and upper frame front are fixed along lower surface, and the top ends of rear vertical frame and upper frame back edge lower surface are fixed.
When steel drum 15 enters after machine, induction of signal is after steel drum 15, and the first prop barrel cylinder ejector on prop barrel frame 9, rises steel drum 15 to depart from chain; The first folder bucket cylinder 4 of the right and left stretches out to be clamped steel drum 15 ladle bodies and fixes and do not rock; It is descending that the getting of tape travel switch covered cylinder 2, and the roller 8 of simultaneously clamping steel drum 15 ladle bodies rotates and drives steel drum 15 to rotate under the drive of motor and chain realizes position automatic capturing.
Behind accurate location, being connected with getting of electromagnet 3, cover cylinder 2 descending, after putting in place, by the sucking-off of big or small frock lid, gets that to cover cylinder 2 up, homing postpone power-off, frock cover automatic trip from.The first folder bucket cylinder 4 and the first prop barrel cylinder reset simultaneously, and steel drum 15 is transported to the second station with chain; Prop barrel cylinder ejects chain by steel drum 15, and both sides folder bucket cylinder 4 clamps simultaneously, simultaneously first signal switch 11 descending location.After the centering of position, drive the first air blowing cylinder 10 of gas blow pipe 14 to decline, gas blow pipe 14 is from big sealing plug to the interior air blowing of steel drum 15.Complete the rear all cylinders of blowing and reset, steel drum 15 is transported to the 3rd station and repeats to complete air blowing according to a barrel a whole set of flow process after the second station action.The 3rd station has the parts such as the 3rd folder bucket cylinder 6, the second air blowing cylinder 12, secondary signal switch 13 and gas blow pipe 14.

Claims (2)

1. get frock lid and blowning installation for one kind, it is characterized in that: it comprises portal frame (1), on the upper frame of frame (1), be fixed with to get and cover cylinder (2), get to cover on cylinder (2) and there is travel switch, be fixed with electromagnet (3) getting the piston rod end of covering cylinder (2), in the front vertical frame of frame (1) and rear vertical frame, be fixed with one group of first folder bucket cylinder (4), in the front vertical frame of frame (1) and rear vertical frame, be fixed with one group of second folder bucket cylinder (5), in the front vertical frame of frame (1) and rear vertical frame, be fixed with one group of the 3rd folder bucket cylinder (6), the installation site of the first folder bucket cylinder (4) with get the installation site of covering cylinder (2) and coordinate, at the first folder bucket cylinder (4), the second folder bucket cylinder (5) is all fixed with a turning rolls (7) with the piston rod end of the 3rd folder bucket cylinder (6), at the upper rotating turret of each turning rolls (7), be provided with left and right two rollers (8), between the front vertical frame of frame (1) and rear vertical frame, the lower position of middle part corresponding upper frame is fixed with prop barrel frame (9), on prop barrel frame (9), be fixed with the first prop barrel cylinder, the second prop barrel cylinder and the 3rd prop barrel cylinder, the installation site of the first prop barrel cylinder coordinates with the installation site of the first folder bucket cylinder (4), the installation site of the second prop barrel cylinder coordinates with the installation site of the second folder bucket cylinder (5), the installation site of the 3rd prop barrel cylinder coordinates with the installation site of the 3rd folder bucket cylinder (6), on the upper frame of getting the frame (1) of covering cylinder (2) right side, be fixed with the first air blowing cylinder (10) and first signal switch (11), on the upper frame of the frame (1) on the first air blowing cylinder (10) right side, be fixed with the second air blowing cylinder (12) and secondary signal switch (13), on the piston rod of the first air blowing cylinder (10) and the second air blowing cylinder (12), gas blow pipe (14) is all installed.
2. the frock of getting as claimed in claim 1 is covered and blowning installation, it is characterized in that: described frame (1) comprises upper frame, front vertical frame and rear vertical frame, the top ends of front vertical frame and upper frame front are fixed along lower surface, and the top ends of rear vertical frame and upper frame back edge lower surface are fixed.
CN201320646825.1U 2013-10-18 2013-10-18 Device for taking tooling cover and blowing Withdrawn - After Issue CN203508313U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320646825.1U CN203508313U (en) 2013-10-18 2013-10-18 Device for taking tooling cover and blowing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320646825.1U CN203508313U (en) 2013-10-18 2013-10-18 Device for taking tooling cover and blowing

Publications (1)

Publication Number Publication Date
CN203508313U true CN203508313U (en) 2014-04-02

Family

ID=50367295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320646825.1U Withdrawn - After Issue CN203508313U (en) 2013-10-18 2013-10-18 Device for taking tooling cover and blowing

Country Status (1)

Country Link
CN (1) CN203508313U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103521397A (en) * 2013-10-18 2014-01-22 无锡四方友信股份有限公司 Tooling cover removing and air blowing device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103521397A (en) * 2013-10-18 2014-01-22 无锡四方友信股份有限公司 Tooling cover removing and air blowing device
CN103521397B (en) * 2013-10-18 2015-08-12 无锡四方友信股份有限公司 Get frock lid and blowning installation

Similar Documents

Publication Publication Date Title
CN204074648U (en) The auxiliary clamping facility of high-voltage water jet device
CN108000273A (en) A kind of automotive hub double-sided full automatic polishing production line
CN203498750U (en) Mechanical arm of rapid bridge test vehicle
CN203199661U (en) Full-automatic sealing and verifying device for intelligent electric meter
CN204624622U (en) A kind of tyre side is to positioning clamping device
CN103321147A (en) Road and bridge detection working platform
CN203508313U (en) Device for taking tooling cover and blowing
CN103521397A (en) Tooling cover removing and air blowing device
CN205257387U (en) Automatic control system of tire upset go -no -go
CN203173507U (en) Metal ingot stacking self-rotating clamping mechanism
CN105033982A (en) Apparatus for manually marking lines on round steel cross section
CN205192432U (en) Flat motor brush automated inspection machine
CN204945058U (en) Defect inspection machine
CN102950589B (en) A kind of tandem large-size propeller turning manipulator
CN203750881U (en) Material classifying mechanism
CN103447479A (en) Smearing tool for evaporative-pattern casting mould
CN204116250U (en) A kind of X ray flat panel imaging monitor station system and device
CN203172952U (en) On-line quality testing tool
CN204210136U (en) A kind of offset press heat-sensitive glue forme storing unit
CN204472846U (en) A kind of drawing handle detachable protective screen transportation means
CN203376126U (en) Valve sealing detection device and valve sealing detection device group
CN203544747U (en) Three-phase energy meter workpiece pallet accommodating assisting device
CN204035897U (en) Tank body leg apparatus for welding and positioning
CN104400992A (en) Plastic pipe groove processing machine
CN204945363U (en) A kind of electric energy meter pipelined units equipment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140402

Effective date of abandoning: 20150812

RGAV Abandon patent right to avoid regrant