CN203487777U - Reinforcing system, in which split screws do not penetrate through templates, for large shear wall - Google Patents

Reinforcing system, in which split screws do not penetrate through templates, for large shear wall Download PDF

Info

Publication number
CN203487777U
CN203487777U CN201220711877.8U CN201220711877U CN203487777U CN 203487777 U CN203487777 U CN 203487777U CN 201220711877 U CN201220711877 U CN 201220711877U CN 203487777 U CN203487777 U CN 203487777U
Authority
CN
China
Prior art keywords
template
nut
shear wall
templates
screw arbor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201220711877.8U
Other languages
Chinese (zh)
Inventor
汪小东
袁东辉
刘恒昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Third Engineering Division
Original Assignee
First Construction Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Third Engineering Division filed Critical First Construction Co Ltd of China Construction Third Engineering Division
Priority to CN201220711877.8U priority Critical patent/CN203487777U/en
Application granted granted Critical
Publication of CN203487777U publication Critical patent/CN203487777U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a reinforcing system, in which split screws do not penetrate through templates, for a large shear wall. The reinforcing system comprises the split screws, fixtures and nuts, and is characterized in that the reinforcing system further comprises secondary keels, main keels and the templates; the templates are mutually naturally jointed; the secondary keels are fixed on the templates; the main keels are fixed on the secondary keels; the split screws penetrate through the shear wall from the joint gaps among the templates, and then the main keels are fixed through the fixtures and the nuts. The reinforcing system further comprises template strips which are arranged in the joint gaps among the mutually naturally jointed templates, and the split screws penetrate through the template strips, and then the main keels are fixed through the fixtures and the nuts. In the process of wall construction, by adopting the reinforcing system, the templates are not damaged, and the templates are prevented from being penetrated through, so that the usage efficiency of the templates are increased, the appearance quality of the concrete wall is improved, the flatness of the wall is increased, the time, the material, the work and the cost are saved, and the operation is simple, safe and convenient.

Description

A kind of large shear wall Screw arbor with nut at both-ends do not worn the hardened system of template
Technical field
The utility model relates to a kind of large shear wall Screw arbor with nut at both-ends and does not wear the hardened system of template.
Background technology
In construction work at present, there is the similar cast-in-place structural bodies of wall such as a large amount of large-area shear walls, retaining wall, structure outer, when wall body structure is constructed, generally all adopt traditional template to join the reinforcement means of keel, Screw arbor with nut at both-ends is arranged more random, while causing Screw arbor with nut at both-ends to pass template, leave more hole, so turnover is used, and has greatly reduced the application life of template, and the structure wall impression quality after construction is also poor.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of large shear wall Screw arbor with nut at both-ends and does not wear the hardened system of template, has solved the problems referred to above, can not damage template, can also improve the impression quality of concrete wall.
Technical problem to be solved in the utility model is achieved through the following technical solutions:
A kind of large shear wall Screw arbor with nut at both-ends do not worn the hardened system of template, comprise Screw arbor with nut at both-ends, jig and nut, it is characterized in that: also comprise secondary joist, main joist and template, naturally splicing between described template and template, fixing secondary joist in template, fixing main joist on secondary joist, Screw arbor with nut at both-ends between the piece between template through shear wall, then by the fixing main joist of jig and nut.
This hardened system also comprises template bar, and described template bar is located between template between the piece forming after splicing naturally, and Screw arbor with nut at both-ends is worn after template bar by the fixing main joist of jig and nut.
Described Screw arbor with nut at both-ends is by the piece between template through shear wall, and piece is again with the sealing of template bar.
Described template is normal wood template, veneer or bamboo offset plate.
Described secondary joist is wooden a tree, used in making timber for boats, square steel pipe or round steel pipe.
Described main joist is square steel pipe, round steel pipe, channel-section steel or i iron.
The utility model with respect to the beneficial effect of prior art is: when wall body structure is constructed, can not damage template, in template, do not bore a hole, can increase the service efficiency of template, improve the impression quality of concrete wall, improve the planeness of body of wall, save time, material-saving, province's merit, province's expense, and simple to operate, safe, convenient.
Accompanying drawing explanation
Fig. 1 is the plan view that a kind of large shear wall Screw arbor with nut at both-ends do not worn the reinforcement means of template;
Fig. 2 is the 1-1 sectional drawing in Fig. 1;
In figure: 1. secondary joist, 2. Screw arbor with nut at both-ends, 3. template, 4. main joist, 5. nut, 6. jig, 7. template bar, 8. shear wall.
The specific embodiment
Shown in Fig. 1-2, a kind of large shear wall Screw arbor with nut at both-ends do not worn the hardened system of template, comprise Screw arbor with nut at both-ends, jig and nut, it is characterized in that: also comprise secondary joist, main joist and template, naturally splicing between described template and template, fixing secondary joist in template, fixing main joist on secondary joist, Screw arbor with nut at both-ends between the piece between template through shear wall, then by the fixing main joist of jig and nut.
This hardened system also comprises template bar, and described template bar is located between template between the piece forming after splicing naturally, and Screw arbor with nut at both-ends is worn after template bar by the fixing main joist of jig and nut.
Described Screw arbor with nut at both-ends is by the piece between template through shear wall, and piece is again with the sealing of template bar.
Described template is normal wood template, veneer or bamboo offset plate.
Described secondary joist is wooden a tree, used in making timber for boats, square steel pipe or round steel pipe.
Described main joist is square steel pipe, round steel pipe, channel-section steel or i iron.
During use, fixing secondary joist in template, on secondary joist, fixedly main joist, main joist are fixed by Screw arbor with nut at both-ends, and Screw arbor with nut at both-ends is reinforced by nut after wearing template bar by jig, has reinforced rear beginning concreting.After operation completes, remove screw rod, template, the keel reinforced, lower one deck turnover is used.Every one deck construction and so forth.

Claims (6)

1. a large face shear wall Screw arbor with nut at both-ends is not worn the hardened system of template, comprise Screw arbor with nut at both-ends, jig and nut, it is characterized in that: also comprise secondary joist, main joist and template, naturally splicing between described template and template, fixing secondary joist in template, fixing main joist on secondary joist, Screw arbor with nut at both-ends between the piece between template through shear wall, then by the fixing main joist of jig and nut.
2. large shear wall Screw arbor with nut at both-ends as claimed in claim 1 do not worn the hardened system of template, it is characterized in that: also comprise template bar, described template bar is located between template between the piece forming after splicing naturally, and Screw arbor with nut at both-ends is worn after template bar by the fixing main joist of jig and nut.
3. large shear wall Screw arbor with nut at both-ends as claimed in claim 1 do not worn the hardened system of template, it is characterized in that: described Screw arbor with nut at both-ends is by the piece between template through shear wall, and piece is again with the sealing of template bar.
4. large shear wall Screw arbor with nut at both-ends as claimed in claim 1 do not worn the hardened system of template, it is characterized in that: described template is normal wood template, veneer or bamboo offset plate.
5. large shear wall Screw arbor with nut at both-ends as claimed in claim 1 do not worn the hardened system of template, it is characterized in that: described secondary joist is wooden a tree, used in making timber for boats, square steel pipe or round steel pipe.
6. large shear wall Screw arbor with nut at both-ends as claimed in claim 1 do not worn the hardened system of template, it is characterized in that: described main joist is square steel pipe, round steel pipe, channel-section steel or i iron.
CN201220711877.8U 2012-12-18 2012-12-18 Reinforcing system, in which split screws do not penetrate through templates, for large shear wall Expired - Fee Related CN203487777U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220711877.8U CN203487777U (en) 2012-12-18 2012-12-18 Reinforcing system, in which split screws do not penetrate through templates, for large shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220711877.8U CN203487777U (en) 2012-12-18 2012-12-18 Reinforcing system, in which split screws do not penetrate through templates, for large shear wall

Publications (1)

Publication Number Publication Date
CN203487777U true CN203487777U (en) 2014-03-19

Family

ID=50258617

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220711877.8U Expired - Fee Related CN203487777U (en) 2012-12-18 2012-12-18 Reinforcing system, in which split screws do not penetrate through templates, for large shear wall

Country Status (1)

Country Link
CN (1) CN203487777U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104818843A (en) * 2015-04-20 2015-08-05 常州展华机器人有限公司 Large-scale shear wall drilling-free mounting template and use method
CN105822056A (en) * 2016-03-24 2016-08-03 中国五冶集团有限公司 Shear wall template support
CN108385975A (en) * 2018-01-22 2018-08-10 中国十七冶集团有限公司 A kind of modified split bolt
CN110344582A (en) * 2019-07-12 2019-10-18 江苏南通二建集团有限公司 A kind of scattered structure and construction technology spelled wooden model and exempt from aperture reinforcement system of shear wall
CN113266144A (en) * 2021-05-26 2021-08-17 五冶集团上海有限公司 Improved shear wall template reinforcing method
CN113530222A (en) * 2021-07-23 2021-10-22 中建一局华江建设有限公司 Special-shaped column template

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104818843A (en) * 2015-04-20 2015-08-05 常州展华机器人有限公司 Large-scale shear wall drilling-free mounting template and use method
CN105822056A (en) * 2016-03-24 2016-08-03 中国五冶集团有限公司 Shear wall template support
CN105822056B (en) * 2016-03-24 2019-03-26 中国五冶集团有限公司 Shear wall formwork supporting
CN108385975A (en) * 2018-01-22 2018-08-10 中国十七冶集团有限公司 A kind of modified split bolt
CN110344582A (en) * 2019-07-12 2019-10-18 江苏南通二建集团有限公司 A kind of scattered structure and construction technology spelled wooden model and exempt from aperture reinforcement system of shear wall
CN113266144A (en) * 2021-05-26 2021-08-17 五冶集团上海有限公司 Improved shear wall template reinforcing method
CN113530222A (en) * 2021-07-23 2021-10-22 中建一局华江建设有限公司 Special-shaped column template

Similar Documents

Publication Publication Date Title
CN203487777U (en) Reinforcing system, in which split screws do not penetrate through templates, for large shear wall
CN204370605U (en) Assembled steel-wood buckling restrained brace with self-tapping screw for reinforcement
CN203238951U (en) Box girder steel pipe arc bracket
CN203222994U (en) Detachable embedded piece for outer wall formwork
CN204212417U (en) A kind of bracing means of shear wall aluminum alloy mould plate
CN204609295U (en) A kind of square column template anchor ear encloses purlin
CN203547113U (en) Molded outer scaffold wall connecting piece device
CN203373979U (en) Building template bracing frame buckle
CN206128624U (en) Complete wooden structural grouping instrument formula wall form system
CN204826653U (en) Stupefied fixing clip of vertical back of body of aluminum mould board
CN201714093U (en) Turn-around tie bolt used in construction of concrete wall form
CN201843337U (en) Concrete wall internal corner moulding plate structure
CN204199703U (en) Shear wall interlayer connects a batch tool-type steel bracket
CN201502173U (en) Combined keel for building template support system
CN204626973U (en) A kind of sealing up screw for building
CN204238549U (en) A kind of formwork support structure of steel reinforced concrete
CN204402006U (en) The pre-structure of i iron of reusable edible
CN202969919U (en) Set-shaped steel formwork for plugging position between prefabricated column and crane beam
CN204370688U (en) Beam column of steel structure
CN204899034U (en) Prefabricated wall post
CN203145447U (en) Typified form
CN202810205U (en) Template construction of concrete column
CN203285048U (en) PVC plane building framework
CN207749825U (en) Tool-type beam side formula fixture
CN202482754U (en) Structure for reinforcing pier by using steel board in earthquake resistance manner

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140319

Termination date: 20201218

CF01 Termination of patent right due to non-payment of annual fee