CN203373979U - Building template bracing frame buckle - Google Patents
Building template bracing frame buckle Download PDFInfo
- Publication number
- CN203373979U CN203373979U CN201320136371.3U CN201320136371U CN203373979U CN 203373979 U CN203373979 U CN 203373979U CN 201320136371 U CN201320136371 U CN 201320136371U CN 203373979 U CN203373979 U CN 203373979U
- Authority
- CN
- China
- Prior art keywords
- deck
- stand
- bolt
- screwed hole
- bracing frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 claims abstract description 23
- 238000009415 formwork Methods 0.000 claims description 14
- 229910000831 Steel Inorganic materials 0.000 abstract description 6
- 239000010959 steel Substances 0.000 abstract description 6
- 238000004134 energy conservation Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 abstract 1
- XEEYBQQBJWHFJM-UHFFFAOYSA-N iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 4
- 229910052742 iron Inorganic materials 0.000 description 4
- 210000000282 Nails Anatomy 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Abstract
The utility model relates to a building template bracing frame buckle, comprising a first stand and a second stand, which are fixedly connected in a back-to-back manner. The first stand is a U-shaped plate, an opening edge is provided with a side plate, and one side of the stand is provided with one screwed hole. A bolt is screwed in the screwed hole of the stand. A clamping plate is fixed to the tail end of the bolt through a screw. The second stand is also a U-shaped plate, and an opening at one end is used for placing a square pipe support. One side of the stand is provided with a screwed hole. The bolt is screwed in the screwed hole of the stand. The clamping plate is fixed to the tail end of the bolt through the screw. The inner wall of the stand is arc-shaped, and the clamping plate having an arc-shaped surface is provided to match a circular pipe support. The building template bracing frame buckle is advantageous in that the connection problem between steel square pipes can be resolved, and thereby the use of the steel square pipes can be more flexible, more stable and safer in the support system of the building template; supporting speed is greatly increased, construction process is simplified and construction cost is reduced, and energy conservation and emission reduction can be achieved.
Description
Technical field
The utility model relates to a kind of for adopting the rigidity square tube to do the bracing frame buckle that construction formwork supports.
Background technology
Now the template support system of each construction engineering corporation of builing industry in cast-in-place concrete generally adopts steel pipe that diameter is 48 millimeters to add the mode of flitch.Supporter holder part steel pipe, template processing part flitch, and flitch is consumable material, and the turnover access times are few, and consumption is large.During operation, will be fixed together template and flitch with iron nail, this supporting method technical requirements is high, and professional carpenter's operation be arranged, and the carpentry amount is large, consumes a large amount of timber, iron nail iron wire etc. in construction.Construction technology is more complicated also, and the time-consuming efficiency of taking a lot of work is low.Have some engineering companies to start to adopt C shaped steel and rigidity square tube to substitute flitch, with steel, for wood, do the construction formwork support system, but the rigidity square tube cannot length can cut arbitrarily as flitch, flexibility just reduces greatly.
Summary of the invention
In order to solve deficiency of the prior art, the utility model provides a kind of more flexible firm safety that uses, swift to operate, can greatly improve the construction formwork bracing frame buckle of support speed.
The utility model adopts following scheme to complete:
A kind of construction formwork bracing frame buckle, comprise the first deck and the second deck, and the first deck and the second deck are back-to-back affixed; Described the first deck is the U-shaped plate, and edge of opening is provided with side plate, and deck is simultaneously opened a screwed hole; Bolt screws in the screwed hole on deck; Described clamping plate are fixed in the bolt tail end by a screw; Described the second deck is also the U-shaped plate, and opening is for putting into a square tube support, and deck is simultaneously opened a screwed hole; Bolt screws in the screwed hole on deck; Described clamping plate are fixed in the bolt tail end by a screw.
Available first deck and second deck are affixed according to need, also can one the first deck simultaneously affixed with two the second decks; Further, the needs while in order to adapt to support, being pipe, the deck inwall can be done camber, coordinates the clamping plate with arcwall face to block simultaneously and embraces pipe.
The utility model construction formwork bracing frame connects buckle and has solved the connectivity problem between the rigidity square tube.Make the rigidity square tube use more flexible firm safety in the construction formwork support system.Substitute flitch fully by the rigidity square tube, the application in the construction formwork support system has improved support speed greatly, has simplified construction technology, has reduced construction cost, has also really realized energy-saving and emission-reduction simultaneously.
The accompanying drawing explanation
Fig. 1 is the utility model front view;
Fig. 2 is the utility model top view;
Fig. 3 is the utility model three-dimensional view;
Fig. 4 is another example of the utility model;
Fig. 5 is a distortion of the present utility model
In figure: side plate 1, the first deck 2, bolt 3, clamping plate 4, the second decks 5.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is illustrated: a kind of construction formwork bracing frame buckle as shown in Figure 1, 2, 3 comprises that the first deck 2 and the second deck 5, the first decks 2 and the second deck 5 are back-to-back affixed; Described the first deck 2 is the U-shaped plate, and edge of opening is provided with side plate 1, the first deck 2 one sides and opens a screwed hole; The screwed hole that bolt 3 screws on the first deck 1; Described clamping plate 4 are fixed in bolt 3 tail ends by a screw; Described the second deck 5 is also the U-shaped plate, and an end opening is for putting into a square tube support, and the second deck 5 one sides are opened a screwed hole; Bolt 3 screws on the second decks in 5 screwed hole; Described clamping plate 4 are fixed in bolt 3 tail ends by a screw.
Put into a support in the first deck 2, adjust bolt 3 and push clamping plate 4, make clamping plate 4 withstand support and just fixed first support, again a support with last support vertical is put into to the second deck 5, adjust bolt 3 and go deep into length, make clamping plate 4 withstand support, the first deck is always vertical with the opening direction of the second deck, and the utility model is particularly suitable for the overlap joint of support anyhow.Side plate is provided with two circular holes, with iron nail, the first deck is fixed on template.
As shown in Figure 4, another embodiment of the present utility model: take last scheme as basis, can make two the second decks 5 simultaneously affixed with first deck 2, this structure is applicable to a pair of two overlap joint.
As shown in Figure 5, a distortion of the present utility model: take such scheme as basis, described the first deck 2 and the second deck 5 outer wall side of being bodies, curved of inwall, clamping plate 4 also have an arcwall face.The position of adjusting bolt 3 makes clamping plate 4 arcwall faces coordinate card to embrace support with deck inwall cambered surface, and this structure is applicable to the overlap joint to the pipe support.
The utility model has solved the connectivity problem between the rigidity square tube, makes the rigidity square tube use more flexible firm safety in the construction formwork support system.Substitute flitch fully by the rigidity square tube, the application in the construction formwork support system has improved support speed greatly, has simplified construction technology, has reduced construction cost, has also really realized energy-saving and emission-reduction simultaneously.
The utility model is simple in structure, is easy to manufacture, and safety is better, operates very quick.
Claims (3)
1. a construction formwork bracing frame buckle, it is characterized in that: comprise the first deck and the second deck, the first deck and the second deck are back-to-back affixed; Described the first deck is the U-shaped plate, and edge of opening is provided with side plate, and deck is simultaneously opened a screwed hole; Bolt screws in the screwed hole on deck; Described clamping plate are fixed in the bolt tail end by a screw; Described the second deck is also the U-shaped plate, and opening is for putting into a square tube support, and deck is simultaneously opened a screwed hole; Bolt screws in the screwed hole on deck; Described clamping plate are fixed in the bolt tail end by a screw.
2. construction formwork bracing frame buckle as claimed in claim 1, it is characterized in that: two the second decks are simultaneously affixed with first deck.
3. construction formwork bracing frame buckle as claimed in claim 1 or 2 is characterized in that: described the first deck and the second deck U-shaped plate outer wall side of being body, and curved of inwall, clamping plate also have an arcwall face.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320136371.3U CN203373979U (en) | 2013-03-25 | 2013-03-25 | Building template bracing frame buckle |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320136371.3U CN203373979U (en) | 2013-03-25 | 2013-03-25 | Building template bracing frame buckle |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203373979U true CN203373979U (en) | 2014-01-01 |
Family
ID=49836522
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320136371.3U Expired - Fee Related CN203373979U (en) | 2013-03-25 | 2013-03-25 | Building template bracing frame buckle |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203373979U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610808A (en) * | 2018-11-11 | 2019-04-12 | 筑梦高科建筑有限公司 | A kind of high-rise aluminum dipping form board combining structure of building |
-
2013
- 2013-03-25 CN CN201320136371.3U patent/CN203373979U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109610808A (en) * | 2018-11-11 | 2019-04-12 | 筑梦高科建筑有限公司 | A kind of high-rise aluminum dipping form board combining structure of building |
CN109610808B (en) * | 2018-11-11 | 2021-04-23 | 广东博智林机器人有限公司 | High-rise building aluminum formwork combined structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203487777U (en) | Reinforcing system, in which split screws do not penetrate through templates, for large shear wall | |
CN203373979U (en) | Building template bracing frame buckle | |
CN202672703U (en) | Device for abutting steel pipe vertical rods in steel pipe scaffold | |
CN203626237U (en) | Steel-wood square column for supporting and forming reinforced concrete member in building construction | |
CN203471421U (en) | Cylindrical part clamp | |
CN202467184U (en) | Novel opposite-pull screw for reinforcing edge beam side form | |
CN205111293U (en) | A frock for concave surface work piece | |
CN204935178U (en) | A kind of steel-structure connecting plate hole drilling fixing clamp | |
CN204715763U (en) | A kind of aluminum alloy mould plate diagonal brace supporting member pre-embedded bolt structure | |
CN204081529U (en) | Building site building block brick loader | |
CN205135655U (en) | Can install tunnel building templates of dismantlement fast | |
CN204817559U (en) | Crane end beam correcting unit | |
CN204843356U (en) | T shaped steel with bury nail welding jig | |
CN205804962U (en) | A kind of building template fixture | |
CN204212417U (en) | A kind of bracing means of shear wall aluminum alloy mould plate | |
CN204345233U (en) | A kind of aluminium alloy extrusions of convenient splicing | |
CN203834806U (en) | H-shaped steel floor secondary beam with improved structure | |
CN203867173U (en) | Keel connecting device of steel aluminum frame template | |
CN203236253U (en) | Lateral thrusting device of large end surface milling workbench | |
CN204658355U (en) | A kind of scratch board machine chain connects special puller | |
CN203334325U (en) | Bottom plate side form system used for basement upstream face construction | |
CN203679279U (en) | Vertical lathe beam clamping rod machining mold | |
CN203548591U (en) | Blank structure of floating bearing seat | |
CN207710327U (en) | A kind of swallow-tail form frock clamp | |
CN203197623U (en) | Fixture for milling hook tail frame connecting plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140101 Termination date: 20150325 |
|
EXPY | Termination of patent right or utility model |