CN203479720U - Inspection device used before laminating solidification working procedure of solar cell module - Google Patents

Inspection device used before laminating solidification working procedure of solar cell module Download PDF

Info

Publication number
CN203479720U
CN203479720U CN201320634243.1U CN201320634243U CN203479720U CN 203479720 U CN203479720 U CN 203479720U CN 201320634243 U CN201320634243 U CN 201320634243U CN 203479720 U CN203479720 U CN 203479720U
Authority
CN
China
Prior art keywords
bar
solar cell
cell module
operator
top shell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320634243.1U
Other languages
Chinese (zh)
Inventor
李哲波
俞军
陈筑
余震杰
冯小平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Eureka Solar Energy Co ltd
Original Assignee
NINGBO ULICA SOLAR TECHNOLOGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGBO ULICA SOLAR TECHNOLOGY DEVELOPMENT Co Ltd filed Critical NINGBO ULICA SOLAR TECHNOLOGY DEVELOPMENT Co Ltd
Priority to CN201320634243.1U priority Critical patent/CN203479720U/en
Application granted granted Critical
Publication of CN203479720U publication Critical patent/CN203479720U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to the field of solar cell module production, in particular to an inspection device used before a laminating solidification working procedure of a solar cell module. The inspection device comprises a cuboid frame, wherein the cuboid frame comprises a rectangular base (1), four supporting rods and a rectangular top shell (2), the four supporting rods are arranged on the base (1), the length of each supporting rod is adjustable, and the rectangular top shell (2) is connected with the four supporting rods. According to the inspection device, due to the facts that an operator can place the solar cell module before the laminating solidification working procedure on the top shell through the inspection device, and then the operator can stand in the cuboid frame to observe the solar cell module, the operator does not need to lift the solar cell module for a long time, labor intensity of the operator is reduced, production efficiency is improved, and the frequency of the phenomena that the solar cell module is damaged by the operator by accident, and even the operator is injured can be greatly reduced.

Description

For the verifying attachment before lamination of solar battery components curing process
Technical field
The utility model relates to solar module production field, relates in particular to a kind of for the verifying attachment before lamination of solar battery components curing process.
Background technology
The main process that solar cell is made assembly is: first EVA glued membrane is layered on transparent tempered glass, then the cell piece face down welding together is laid on EVA glued membrane, put again one deck EVA glued membrane and backboard, finally enter lamination and solidify machine the inside, in the temperatures of 140 degree left and right, tightly also solidify.After lamination curing process, EVA glued membrane melts and is condensed into the position that transparent jelly has been fixed cell piece, holds tightly together with positive glass and the backboard at the back side simultaneously.
Because the assembly after lamination solidifies cannot be done over again again, thus particularly important to the inspection of assembly before this, mainly check whether cell piece has fragmentation or have the foreign matters such as tin point, with the qualification rate of Assurance component product.
Because the solar module before lamination curing process can only just can be seen inside battery situation from below, so current inspection method is mainly to lift assembly by two employees, lift over the top of the head, seeing through from the bottom up glass sees, but check that like this assembly center section is difficult for inspection and puts in place, and operator's labour intensity is also larger, make production efficiency lower, and indirectly increased production cost, because of operator's error, damage solar module sometimes and even operator itself is damaged, potential safety hazard is larger.
Summary of the invention
Technical problem to be solved in the utility model is: provide a kind of for the verifying attachment before lamination of solar battery components curing process, while making to detect solar module before lamination curing process, efficiency is higher and potential safety hazard is less.
The technical scheme that the utility model adopts is: a kind of for the verifying attachment before lamination of solar battery components curing process, it comprises a rectangular parallelepiped framework, and described rectangular parallelepiped framework comprises rectangle base, be arranged on base and length-adjustable four support bars and the rectangle top shell that is connected with four support bars.
Adopt above structure compared with prior art, the utlity model has following advantage: by this verifying attachment, operator can be placed on the solar module before lamination curing process in top shell, then stand in observation solar module in rectangular parallelepiped framework, so not only do not need operator lifting for a long time solar module, reduced operator's labour intensity, improve production efficiency, and greatly reduced operator because error and damage solar module even damage the situation of self and occur.
As preferably, described support bar comprises the first bar and the second bar, described the first bar is fixed on base, described the second bar is fixed in top shell, described the second bar and the socket of the first bar, and on described the first bar and the second bar, be equipped with the adjustment hole that is fixed for regulating whole support bar height for screw insertion.Adopt this adjustment structure to carry out height to support bar and regulate, adjusting is got up more convenient, and cost is lower.
As preferably, described top shell is provided with a plurality of for support solar battery component and prevent the multi-directional ball of solar module wearing and tearing.A plurality of multi-directional ball are set in top shell, are convenient to that like this solar module is carried out to different directions and move inspection, and can not may wear to solar module when needing to regulate the position that is placed on the solar module in top shell.
As preferably, described base is provided with for convenient mobile universal brake wheel.Mobile more convenient like this.
Accompanying drawing explanation
Fig. 1 is the structural representation of the verifying attachment of the utility model before for lamination of solar battery components curing process.
As shown in the figure: 1, base; 2, top shell; 3, the first bar; 4, the second bar; 5, adjustment hole; 6, multi-directional ball; 7, universal brake wheel.
Embodiment
Below in conjunction with accompanying drawing and embodiment, the utility model is described further, but the utility model is not limited only to following embodiment.
As shown in the figure: a kind of for the verifying attachment before lamination of solar battery components curing process, it comprises a rectangular parallelepiped framework, and described rectangular parallelepiped framework comprises rectangle base 1, be arranged on base 1 and length-adjustable four support bars and the rectangle top shell 2 that is connected with four support bars.Described base 1 is square with top shell 2 reality, and the length of side is 1000-1100mm, and the length of described support bar is 1700-2000mm.
Described support bar comprises the first bar 3 and the second bar 4, described the first bar 3 is fixed on base 1, described the second bar 4 is fixed in top shell 2, described the second bar 4 and the first bar 3 sockets, and on described the first bar 3 and the second bar 4, be equipped with the adjustment hole 5 that is fixed for regulating whole support bar height for screw insertion.On described four the first bars 3 and the second bar 4, be equipped with a plurality of adjustment holes 5.Described base 1 and four the first bars 3 adopt the square steel of 50*50mm to make, and between by being welded and fixed; Described top shell 2 and four the second bars 4 adopt the square steel of 40*40mm to make, and between by being welded and fixed.
Described top shell 2 is provided with a plurality of for support solar battery component and prevent the multi-directional ball 6 of solar module wearing and tearing.
Described base 1 is provided with for convenient mobile universal brake wheel 7.Described universal brake wheel 7 is the universal wheel with brake function, and the height of described universal brake wheel is 50-60mm.
Principle of work of the present utility model is: first verifying attachment is moved to before laminating machine feeding platform, pin universal brake wheel 7, regulate support bar height, the height of whole verifying attachment is applicable to, then the battery component of needs check is lifted in the top shell 2 of verifying attachment, by multi-directional ball 6, automatically slide, can check the outward appearance of battery component diverse location, reduce operating personnel's labour intensity, avoid bad battery component to flow into next procedure, improve product percent of pass, avoid solar module waste of material phenomenon.

Claims (4)

1. one kind for the verifying attachment before lamination of solar battery components curing process, it is characterized in that: it comprises a rectangular parallelepiped framework rectangle top shell (2) that described rectangular parallelepiped framework comprises rectangle base (1), be arranged on upper and length-adjustable four support bars of base (1) and be connected with four support bars.
2. according to claim 1 for the verifying attachment before lamination of solar battery components curing process, it is characterized in that: described support bar comprises the first bar (3) and the second bar (4), described the first bar (3) is fixed on base (1), described the second bar (4) is fixed in top shell (2), described the second bar (4) and the first bar (3) socket, and on described the first bar (3) and the second bar (4), be equipped with the adjustment hole (5) that is fixed for regulating whole support bar height for screw insertion.
3. according to claim 1 for the verifying attachment before lamination of solar battery components curing process, it is characterized in that: described top shell (2) is provided with a plurality of for support solar battery component and prevent the multi-directional ball (6) of solar module wearing and tearing.
4. according to claim 1 for the verifying attachment before lamination of solar battery components curing process, it is characterized in that: described base (1) is provided with for convenient mobile universal brake wheel (7).
CN201320634243.1U 2013-10-15 2013-10-15 Inspection device used before laminating solidification working procedure of solar cell module Expired - Lifetime CN203479720U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320634243.1U CN203479720U (en) 2013-10-15 2013-10-15 Inspection device used before laminating solidification working procedure of solar cell module

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320634243.1U CN203479720U (en) 2013-10-15 2013-10-15 Inspection device used before laminating solidification working procedure of solar cell module

Publications (1)

Publication Number Publication Date
CN203479720U true CN203479720U (en) 2014-03-12

Family

ID=50228031

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320634243.1U Expired - Lifetime CN203479720U (en) 2013-10-15 2013-10-15 Inspection device used before laminating solidification working procedure of solar cell module

Country Status (1)

Country Link
CN (1) CN203479720U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104089962A (en) * 2014-06-11 2014-10-08 张家港市广丰玻璃有限公司 Terminal accommodating and detecting device of glass manufacturing device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104089962A (en) * 2014-06-11 2014-10-08 张家港市广丰玻璃有限公司 Terminal accommodating and detecting device of glass manufacturing device

Similar Documents

Publication Publication Date Title
CN203568666U (en) Transformer substation GIS (gas insulated switchgear) current transformer hoisting tool
CN203479720U (en) Inspection device used before laminating solidification working procedure of solar cell module
CN201881099U (en) I-shaped beam assembly welding and mounting equipment
CN102896623B (en) Maintenance support
CN203865934U (en) Temporary suspension device of pulley lifting mechanism for electric pole
CN205798780U (en) Hang foot and frame welding anti-deformation turning device
CN202924576U (en) Lifting tool for totally enclosed bus conductor
CN204751902U (en) Hoist device of steel pipe stiffening ring crown plate
CN105798523A (en) Deformation-preventing overturning device for welding of suspension lugs and frames
CN203350131U (en) Load test device
CN114044474A (en) Safety protection type power maintenance device
CN207771184U (en) A kind of welder of instrument panel beam skeleton
CN201971562U (en) Hoisting mechanism for high-density battery plate groups
CN206807906U (en) Equipment enclosure cabinet and equipment enclosure
CN205881330U (en) Folding portable site security notice board of distribution fortune wesy
CN203286213U (en) Pumping unit supporting frame
CN205152058U (en) Separator behind glass -cutting
CN204662269U (en) Vertical post type adjustable shuttering support
CN206663712U (en) A kind of plastic product mouth of a river automatic punching device
CN206077170U (en) Used in nuclear power station circulation-water pump electric machine apparatus for examination and repair
CN203521962U (en) Connector used for connecting transformer station large-scale device pedestal and chain block
CN205328459U (en) Jack -up mechanical safety device
CN204324669U (en) A kind of wedge-caulking device of mining locker voussoir
CN202042555U (en) Storage battery mould box locking device
CN208416585U (en) A kind of tunnel temporary protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 181-197, Shanshan Road, Wangchun Industrial Park, Haishu District, Ningbo City, Zhejiang Province, 315177

Patentee after: Ningbo Eureka solar energy Co.,Ltd.

Address before: 315177 Zhejiang city of Ningbo province Yinzhou District Wang Shanshan Lu Chun Industrial Park No. 181

Patentee before: NINGBO ULICA SOLAR TECHNOLOGY DEVELOPMENT Co.,Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140312