CN203479720U - Inspection device used before laminating solidification working procedure of solar cell module - Google Patents
Inspection device used before laminating solidification working procedure of solar cell module Download PDFInfo
- Publication number
- CN203479720U CN203479720U CN201320634243.1U CN201320634243U CN203479720U CN 203479720 U CN203479720 U CN 203479720U CN 201320634243 U CN201320634243 U CN 201320634243U CN 203479720 U CN203479720 U CN 203479720U
- Authority
- CN
- China
- Prior art keywords
- bar
- solar cell
- cell module
- operator
- top shell
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000000034 method Methods 0.000 title claims abstract description 20
- 238000007689 inspection Methods 0.000 title abstract description 9
- 238000010030 laminating Methods 0.000 title abstract description 4
- 238000007711 solidification Methods 0.000 title abstract 3
- 230000008023 solidification Effects 0.000 title abstract 3
- 241000237983 Trochidae Species 0.000 claims abstract description 19
- 238000003475 lamination Methods 0.000 claims description 16
- 238000003780 insertion Methods 0.000 claims description 3
- 230000037431 insertion Effects 0.000 claims description 3
- 230000001105 regulatory effect Effects 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 6
- 239000012528 membrane Substances 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000011521 glass Substances 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- ATJFFYVFTNAWJD-UHFFFAOYSA-N Tin Chemical compound [Sn] ATJFFYVFTNAWJD-UHFFFAOYSA-N 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000013467 fragmentation Methods 0.000 description 1
- 238000006062 fragmentation reaction Methods 0.000 description 1
- 235000015110 jellies Nutrition 0.000 description 1
- 239000008274 jelly Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000155 melt Substances 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 239000005341 toughened glass Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Abstract
The utility model relates to the field of solar cell module production, in particular to an inspection device used before a laminating solidification working procedure of a solar cell module. The inspection device comprises a cuboid frame, wherein the cuboid frame comprises a rectangular base (1), four supporting rods and a rectangular top shell (2), the four supporting rods are arranged on the base (1), the length of each supporting rod is adjustable, and the rectangular top shell (2) is connected with the four supporting rods. According to the inspection device, due to the facts that an operator can place the solar cell module before the laminating solidification working procedure on the top shell through the inspection device, and then the operator can stand in the cuboid frame to observe the solar cell module, the operator does not need to lift the solar cell module for a long time, labor intensity of the operator is reduced, production efficiency is improved, and the frequency of the phenomena that the solar cell module is damaged by the operator by accident, and even the operator is injured can be greatly reduced.
Description
Technical field
The utility model relates to solar module production field, relates in particular to a kind of for the verifying attachment before lamination of solar battery components curing process.
Background technology
The main process that solar cell is made assembly is: first EVA glued membrane is layered on transparent tempered glass, then the cell piece face down welding together is laid on EVA glued membrane, put again one deck EVA glued membrane and backboard, finally enter lamination and solidify machine the inside, in the temperatures of 140 degree left and right, tightly also solidify.After lamination curing process, EVA glued membrane melts and is condensed into the position that transparent jelly has been fixed cell piece, holds tightly together with positive glass and the backboard at the back side simultaneously.
Because the assembly after lamination solidifies cannot be done over again again, thus particularly important to the inspection of assembly before this, mainly check whether cell piece has fragmentation or have the foreign matters such as tin point, with the qualification rate of Assurance component product.
Because the solar module before lamination curing process can only just can be seen inside battery situation from below, so current inspection method is mainly to lift assembly by two employees, lift over the top of the head, seeing through from the bottom up glass sees, but check that like this assembly center section is difficult for inspection and puts in place, and operator's labour intensity is also larger, make production efficiency lower, and indirectly increased production cost, because of operator's error, damage solar module sometimes and even operator itself is damaged, potential safety hazard is larger.
Summary of the invention
Technical problem to be solved in the utility model is: provide a kind of for the verifying attachment before lamination of solar battery components curing process, while making to detect solar module before lamination curing process, efficiency is higher and potential safety hazard is less.
The technical scheme that the utility model adopts is: a kind of for the verifying attachment before lamination of solar battery components curing process, it comprises a rectangular parallelepiped framework, and described rectangular parallelepiped framework comprises rectangle base, be arranged on base and length-adjustable four support bars and the rectangle top shell that is connected with four support bars.
Adopt above structure compared with prior art, the utlity model has following advantage: by this verifying attachment, operator can be placed on the solar module before lamination curing process in top shell, then stand in observation solar module in rectangular parallelepiped framework, so not only do not need operator lifting for a long time solar module, reduced operator's labour intensity, improve production efficiency, and greatly reduced operator because error and damage solar module even damage the situation of self and occur.
As preferably, described support bar comprises the first bar and the second bar, described the first bar is fixed on base, described the second bar is fixed in top shell, described the second bar and the socket of the first bar, and on described the first bar and the second bar, be equipped with the adjustment hole that is fixed for regulating whole support bar height for screw insertion.Adopt this adjustment structure to carry out height to support bar and regulate, adjusting is got up more convenient, and cost is lower.
As preferably, described top shell is provided with a plurality of for support solar battery component and prevent the multi-directional ball of solar module wearing and tearing.A plurality of multi-directional ball are set in top shell, are convenient to that like this solar module is carried out to different directions and move inspection, and can not may wear to solar module when needing to regulate the position that is placed on the solar module in top shell.
As preferably, described base is provided with for convenient mobile universal brake wheel.Mobile more convenient like this.
Accompanying drawing explanation
Fig. 1 is the structural representation of the verifying attachment of the utility model before for lamination of solar battery components curing process.
As shown in the figure: 1, base; 2, top shell; 3, the first bar; 4, the second bar; 5, adjustment hole; 6, multi-directional ball; 7, universal brake wheel.
Embodiment
Below in conjunction with accompanying drawing and embodiment, the utility model is described further, but the utility model is not limited only to following embodiment.
As shown in the figure: a kind of for the verifying attachment before lamination of solar battery components curing process, it comprises a rectangular parallelepiped framework, and described rectangular parallelepiped framework comprises rectangle base 1, be arranged on base 1 and length-adjustable four support bars and the rectangle top shell 2 that is connected with four support bars.Described base 1 is square with top shell 2 reality, and the length of side is 1000-1100mm, and the length of described support bar is 1700-2000mm.
Described support bar comprises the first bar 3 and the second bar 4, described the first bar 3 is fixed on base 1, described the second bar 4 is fixed in top shell 2, described the second bar 4 and the first bar 3 sockets, and on described the first bar 3 and the second bar 4, be equipped with the adjustment hole 5 that is fixed for regulating whole support bar height for screw insertion.On described four the first bars 3 and the second bar 4, be equipped with a plurality of adjustment holes 5.Described base 1 and four the first bars 3 adopt the square steel of 50*50mm to make, and between by being welded and fixed; Described top shell 2 and four the second bars 4 adopt the square steel of 40*40mm to make, and between by being welded and fixed.
Described top shell 2 is provided with a plurality of for support solar battery component and prevent the multi-directional ball 6 of solar module wearing and tearing.
Described base 1 is provided with for convenient mobile universal brake wheel 7.Described universal brake wheel 7 is the universal wheel with brake function, and the height of described universal brake wheel is 50-60mm.
Principle of work of the present utility model is: first verifying attachment is moved to before laminating machine feeding platform, pin universal brake wheel 7, regulate support bar height, the height of whole verifying attachment is applicable to, then the battery component of needs check is lifted in the top shell 2 of verifying attachment, by multi-directional ball 6, automatically slide, can check the outward appearance of battery component diverse location, reduce operating personnel's labour intensity, avoid bad battery component to flow into next procedure, improve product percent of pass, avoid solar module waste of material phenomenon.
Claims (4)
1. one kind for the verifying attachment before lamination of solar battery components curing process, it is characterized in that: it comprises a rectangular parallelepiped framework rectangle top shell (2) that described rectangular parallelepiped framework comprises rectangle base (1), be arranged on upper and length-adjustable four support bars of base (1) and be connected with four support bars.
2. according to claim 1 for the verifying attachment before lamination of solar battery components curing process, it is characterized in that: described support bar comprises the first bar (3) and the second bar (4), described the first bar (3) is fixed on base (1), described the second bar (4) is fixed in top shell (2), described the second bar (4) and the first bar (3) socket, and on described the first bar (3) and the second bar (4), be equipped with the adjustment hole (5) that is fixed for regulating whole support bar height for screw insertion.
3. according to claim 1 for the verifying attachment before lamination of solar battery components curing process, it is characterized in that: described top shell (2) is provided with a plurality of for support solar battery component and prevent the multi-directional ball (6) of solar module wearing and tearing.
4. according to claim 1 for the verifying attachment before lamination of solar battery components curing process, it is characterized in that: described base (1) is provided with for convenient mobile universal brake wheel (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320634243.1U CN203479720U (en) | 2013-10-15 | 2013-10-15 | Inspection device used before laminating solidification working procedure of solar cell module |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320634243.1U CN203479720U (en) | 2013-10-15 | 2013-10-15 | Inspection device used before laminating solidification working procedure of solar cell module |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203479720U true CN203479720U (en) | 2014-03-12 |
Family
ID=50228031
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320634243.1U Expired - Lifetime CN203479720U (en) | 2013-10-15 | 2013-10-15 | Inspection device used before laminating solidification working procedure of solar cell module |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203479720U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104089962A (en) * | 2014-06-11 | 2014-10-08 | 张家港市广丰玻璃有限公司 | Terminal accommodating and detecting device of glass manufacturing device |
-
2013
- 2013-10-15 CN CN201320634243.1U patent/CN203479720U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104089962A (en) * | 2014-06-11 | 2014-10-08 | 张家港市广丰玻璃有限公司 | Terminal accommodating and detecting device of glass manufacturing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203568666U (en) | Transformer substation GIS (gas insulated switchgear) current transformer hoisting tool | |
CN203479720U (en) | Inspection device used before laminating solidification working procedure of solar cell module | |
CN201881099U (en) | I-shaped beam assembly welding and mounting equipment | |
CN102896623B (en) | Maintenance support | |
CN203865934U (en) | Temporary suspension device of pulley lifting mechanism for electric pole | |
CN205798780U (en) | Hang foot and frame welding anti-deformation turning device | |
CN202924576U (en) | Lifting tool for totally enclosed bus conductor | |
CN204751902U (en) | Hoist device of steel pipe stiffening ring crown plate | |
CN105798523A (en) | Deformation-preventing overturning device for welding of suspension lugs and frames | |
CN203350131U (en) | Load test device | |
CN114044474A (en) | Safety protection type power maintenance device | |
CN207771184U (en) | A kind of welder of instrument panel beam skeleton | |
CN201971562U (en) | Hoisting mechanism for high-density battery plate groups | |
CN206807906U (en) | Equipment enclosure cabinet and equipment enclosure | |
CN205881330U (en) | Folding portable site security notice board of distribution fortune wesy | |
CN203286213U (en) | Pumping unit supporting frame | |
CN205152058U (en) | Separator behind glass -cutting | |
CN204662269U (en) | Vertical post type adjustable shuttering support | |
CN206663712U (en) | A kind of plastic product mouth of a river automatic punching device | |
CN206077170U (en) | Used in nuclear power station circulation-water pump electric machine apparatus for examination and repair | |
CN203521962U (en) | Connector used for connecting transformer station large-scale device pedestal and chain block | |
CN205328459U (en) | Jack -up mechanical safety device | |
CN204324669U (en) | A kind of wedge-caulking device of mining locker voussoir | |
CN202042555U (en) | Storage battery mould box locking device | |
CN208416585U (en) | A kind of tunnel temporary protection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: No. 181-197, Shanshan Road, Wangchun Industrial Park, Haishu District, Ningbo City, Zhejiang Province, 315177 Patentee after: Ningbo Eureka solar energy Co.,Ltd. Address before: 315177 Zhejiang city of Ningbo province Yinzhou District Wang Shanshan Lu Chun Industrial Park No. 181 Patentee before: NINGBO ULICA SOLAR TECHNOLOGY DEVELOPMENT Co.,Ltd. |
|
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20140312 |