CN203476392U - Soft framework bag for coal mine gob-side entry retaining - Google Patents

Soft framework bag for coal mine gob-side entry retaining Download PDF

Info

Publication number
CN203476392U
CN203476392U CN201320598398.4U CN201320598398U CN203476392U CN 203476392 U CN203476392 U CN 203476392U CN 201320598398 U CN201320598398 U CN 201320598398U CN 203476392 U CN203476392 U CN 203476392U
Authority
CN
China
Prior art keywords
bag
coal mine
screw
fixed
entry retaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320598398.4U
Other languages
Chinese (zh)
Inventor
徐刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Hongrong Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201320598398.4U priority Critical patent/CN203476392U/en
Application granted granted Critical
Publication of CN203476392U publication Critical patent/CN203476392U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to the field of mineral industries, in particular to a soft framework bag for coal mine gob-side entry retaining. The soft framework bag for the coal mine gob-side entry retaining comprises a bag body, and the bag body is provided with a screw rod, a grouting hole, multiple fixing bands, multiple hanging parts, multiple fixing screws, multiple fixing baffles and multiple screw rod holes. The fixing bands and the hanging parts are all fixedly connected to the bag body, the fixing baffles are all provided with through holes, the two sides of each screw rod hole are respectively provides with a fixing baffle, the two sides, far away from the screw rod holes, of the corresponding two fixing baffles are respectively provided with a fixing screw, and the screw rod penetrates through the fixing screws, the fixing baffles and the screw holes simultaneously and is meshed with the fixing screws to enable the bag body and the screw rod to be fixedly connected. The grouting hole is formed in the peripheral surface of the bag body. The soft framework bag for the coal mine gob-side entry retaining is beneficial to the tightness of padding among multiple adjacent bag bodies, and the safety factor of the filled bag bodies after being piled up can be further improved.

Description

Soft mould bag for coal mine gob-side entry retaining
Technical field
The utility model relates to mining industry field, in particular to soft mould bag for coal mine gob-side entry retaining.
Background technology
After coal mining, for preventing subsidence, underground filling mainly adopted hydraulic filling in the past, by the shortcoming of hydraulic filling, be that charges do not connect top, speed is slow simultaneously, and energy consumption is large, operation is also inconvenient, cause under down-hole coal column, square, under railway Xia, highway, the coal under building can not exploit.Along with state coal resource exploitation dynamics continues to increase, resource is fewer and feweri, there is a lot of collieries resource to approach exhausted, adopt at present the new placement method of baffle plate and plastics combination, new fill method can recovery well under under coal column, square, under railway Xia, highway, the coal under building, extend the colliery length of service, increased output, reduced cost.New placement method has that filling velocity is fast, filling real, do not subside, and the advantage of energy conservation.
But new filling method mainly uses baffle plate, plastics in conjunction with filling, inconvenient operation, often leaks material, and what make casting resin spray is everywhere, solidify rear very bad cleaning, even block whole production face, it is very difficult to deal with, impact exploitation output, has also increased labour intensity, has improved cost of production.
Utility model content
The purpose of this utility model is to provide soft mould bag for a kind of coal mine gob-side entry retaining, to solve the above problems.
Soft mould bag for the coal mine gob-side entry retaining providing in embodiment of the present utility model, comprising: bag; Described bag is provided with screw mandrel, injected hole, a plurality of fixed band, a plurality of suspension part, a plurality of fixed screw, a plurality of fixed dam and a plurality of screw hole;
A plurality of described fixed bands are all fixedly connected with described bag with a plurality of described suspension parts;
On a plurality of described fixed dams, be equipped with through hole;
The both sides of a described screw hole are respectively equipped with a described fixed dam, two described fixed dams are respectively equipped with a described fixed screw away from the both sides of described screw hole, described screw mandrel, successively through described fixed screw, described fixed dam and described screw hole, is fixedly connected with described bag with described fixed screw engagement with described screw mandrel;
Described injected hole is located on the side face of described bag.
Soft mould bag for the coal mine gob-side entry retaining that the utility model provides, on bag, be provided with a plurality of fixed bands, fixed band is tied up on the individual prop in tunnel, and the suspension part being simultaneously located on bag is suspended on bag in tunnel, by fixed band and suspension part, bag is fixed in tunnel.
In the both sides of a screw hole, be respectively equipped with a fixed dam simultaneously, two fixed dams are respectively equipped with a fixed screw away from the both sides of screw hole, screw mandrel is simultaneously through fixed screw, fixed dam and screw hole, with fixed screw engagement, bag is fixedly connected with screw mandrel, now by screw mandrel, fixed dam and fixed screw, the shape of bag is fixed.
By injected hole, slurry is packed in described bag.Give while injecting slurry in bag, fixing because bag hangs, and the fixed band being arranged on bag ties up on the individual prop in tunnel, and bag is completely fixed, and the slurry being packed in bag can be tamped in bag.And because bag is fixedly connected with screw mandrel, when using slurry to fill bag, bag is not yielding, is conducive to the filling compactness between a plurality of adjacent bags, and then the safety factor of the bag that can improve filling after piling up.
Accompanying drawing explanation
The structural representation of soft mould bag for the coal mine gob-side entry retaining that Fig. 1 provides for the utility model;
1. bag, 2. fixed band, 3. suspension part, 4. screw hole, 5. injected hole.
The specific embodiment
Below by specific embodiment, also by reference to the accompanying drawings the utility model is described in further detail.
Embodiment 1: as shown in Figure 1,
Soft mould bag for coal mine gob-side entry retaining, comprising: bag 1; Described bag 1 is provided with screw mandrel, injected hole 5, a plurality of fixed band 2, a plurality of suspension part 3, a plurality of fixed screw, a plurality of fixed dam and a plurality of screw hole 4;
A plurality of described fixed bands 2 are all fixedly connected with described bag 1 with a plurality of described suspension parts 3;
On a plurality of described fixed dams, be equipped with through hole;
The both sides of a described screw hole 4 are respectively equipped with a described fixed dam, two described fixed dams are respectively equipped with a described fixed screw away from the both sides of described screw hole 4, described screw mandrel, successively through described fixed screw, described fixed dam and described screw hole 4, is fixedly connected with described bag 1 with described fixed screw engagement with described screw mandrel;
Described injected hole 5 is located on the side face of described bag 1.
Soft mould bag for the coal mine gob-side entry retaining that the utility model provides, on bag 1, be provided with a plurality of fixed bands 2, fixed band 2 is tied up on the individual prop in tunnel, and the suspension part 3 being simultaneously located on bag 1 is suspended on bag 1 in tunnel, by fixed band 2 and suspension part 3, bag 1 is fixed in tunnel.
In the both sides of a screw hole 4, be respectively equipped with a fixed dam simultaneously, two fixed dams are respectively equipped with a fixed screw away from the both sides of screw hole 4, screw mandrel is simultaneously through fixed screw, fixed dam and screw hole 4, with fixed screw engagement, bag 1 is fixedly connected with screw mandrel, now by screw mandrel, fixed dam and fixed screw, the shape of bag 1 is fixed.
By injected hole 5, slurry is packed in described bag 1.Give while injecting slurry in bag 1, fixing because bag 1 hangs, and the fixed band 2 being arranged on bag 1 ties up on the individual prop in tunnel, and bag 1 is completely fixed, and the slurry being packed in bag 1 can be in the interior compacting of bag 1.And because bag 1 is fixedly connected with screw mandrel, when using slurry to fill bag 1, bag 1 is not yielding, is conducive to the filling compactness between a plurality of adjacent bags 1, and then the safety factor of the bag 1 that can improve filling after piling up.
Embodiment 2:
Based on above-described embodiment, the utility model has been done further improvement:
For convenient, arrange, suspension part 3 can be set for cylinder-like structure, the sidewall of suspension part 3 is fixedly connected with bag 1, and the face at the sidewall place of the axis of suspension part 3 and bag 1 is parallel.During suspension, the support being located in tunnel directly can hang fixing by bag 1 through suspension part 3 cylindraceous.
In order to facilitate the filling in larger space, bag 1 can be set to regular hexahedron.A plurality of regular hexahedrons are close to filling and can be made the gap between filler less.
For the bag of regular hexahedron 1 being strutted completely, can on four side faces of bag 1, screw hole 4 be all set respectively, screw mandrel, through the screw hole 4 of diagonal positions, uses two screw mandrels bag 1 can be strutted completely.
In order to facilitate slip casting, and the upper surface of the bag 1 of regular hexahedron is close to the end face in tunnel, and its soffit, by ground, so preferably, can be located at injected hole 5 on the side face of bag 1.
For the bag of regular hexahedron 1 being fixed in tunnel reposefully, a plurality of fixed bands 2 can be located at respectively on four side faces of bag 1.
For the bag of regular hexahedron 1 being suspended in tunnel reposefully, a plurality of suspension parts 3 can be located at respectively on four side faces of bag 1.
In order to meet the tunnel of different structure, fill requirement, bag 1 can be set for cylindric.
The foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, for a person skilled in the art, the utility model can have various modifications and variations.All within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.

Claims (8)

1. soft mould bag for coal mine gob-side entry retaining, is characterized in that, comprising: bag; Described bag is provided with screw mandrel, injected hole, a plurality of fixed band, a plurality of suspension part, a plurality of fixed screw, a plurality of fixed dam and a plurality of screw hole;
A plurality of described fixed bands are all fixedly connected with described bag with a plurality of described suspension parts;
On a plurality of described fixed dams, be equipped with through hole;
The both sides of a described screw hole are respectively equipped with a described fixed dam, two described fixed dams are respectively equipped with a described fixed screw away from the both sides of described screw hole, described screw mandrel, successively through described fixed screw, described fixed dam and described screw hole, is fixedly connected with described bag with described fixed screw engagement with described screw mandrel;
Described injected hole is located on the side face of described bag.
2. soft mould bag for coal mine gob-side entry retaining according to claim 1, is characterized in that,
Described suspension part is cylinder-like structure, and the sidewall of described suspension part is fixedly connected with described bag, and the face at the sidewall place of the axis of described suspension part and described bag is parallel.
3. soft mould bag for coal mine gob-side entry retaining according to claim 2, is characterized in that,
Described bag is regular hexahedron.
4. soft mould bag for coal mine gob-side entry retaining according to claim 3, is characterized in that,
On four side faces of described bag, be respectively equipped with described screw hole.
5. soft mould bag for coal mine gob-side entry retaining according to claim 3, is characterized in that,
Described injected hole is located on the side face of described bag.
6. soft mould bag for coal mine gob-side entry retaining according to claim 3, is characterized in that,
A plurality of described fixed bands are located at respectively on four side faces of described bag.
7. soft mould bag for coal mine gob-side entry retaining according to claim 3, is characterized in that,
A plurality of described suspension parts are located at respectively on four side faces of described bag.
8. soft mould bag for coal mine gob-side entry retaining according to claim 1, is characterized in that,
Described bag is cylindric.
CN201320598398.4U 2013-09-26 2013-09-26 Soft framework bag for coal mine gob-side entry retaining Expired - Lifetime CN203476392U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320598398.4U CN203476392U (en) 2013-09-26 2013-09-26 Soft framework bag for coal mine gob-side entry retaining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320598398.4U CN203476392U (en) 2013-09-26 2013-09-26 Soft framework bag for coal mine gob-side entry retaining

Publications (1)

Publication Number Publication Date
CN203476392U true CN203476392U (en) 2014-03-12

Family

ID=50224737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320598398.4U Expired - Lifetime CN203476392U (en) 2013-09-26 2013-09-26 Soft framework bag for coal mine gob-side entry retaining

Country Status (1)

Country Link
CN (1) CN203476392U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105736046A (en) * 2016-02-25 2016-07-06 北京瑞诺安科新能源技术有限公司 Coal mine underground sealed wall body and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105736046A (en) * 2016-02-25 2016-07-06 北京瑞诺安科新能源技术有限公司 Coal mine underground sealed wall body and construction method thereof

Similar Documents

Publication Publication Date Title
CN103016053B (en) Method of local filling to control surface subsidence in gob
CN103485822B (en) Combined quick blocking and wall retaining device
CN204679497U (en) A kind of form lateral pressure proving installation of grouting filling material
CN103628911B (en) Work plane segmented gob-side entry retaining method is adopted/put to a kind of combining
CN102852551A (en) Gob-side entry retaining method using high-water material filling columns
CN106968676A (en) The method that cavity is passed through in tunnelling
CN106988780A (en) A kind of girdle goaf paste body filling construction method
CN103161498B (en) Half-edge coal seam section coal pillar roadside packing method
CN103939137A (en) Method for filling aeolian sand empty field of western desert mining area shallow coal seam
CN104500109A (en) Underground support pillar and construction method thereof
CN203476392U (en) Soft framework bag for coal mine gob-side entry retaining
CN105021796A (en) Test method for simulating filling type fault fracture zone rock body
CN202132053U (en) VI-level surrounding-rock double track tunnel lining support structure
CN207215815U (en) A kind of analog simulation experiment shelf of unconsolidated formation traveling angle
CN203685287U (en) Coal pillar-free cut and fill mining flexible yielding entry protection filling wall
CN203175569U (en) Steel tube piece tunnel portal water-proof sealing structure in shield-driven tunnel breakthrough
CN202467922U (en) Mining high water expansion filling bag
CN204532377U (en) Shutoff ring after the wall of a kind of shield structure inclined shaft section of jurisdiction
CN203296778U (en) Rigid-flexible combination gob-side entry retaining roadway-side shoring device
CN207295765U (en) Tunnel engineering construction platform back structure
CN102373955A (en) Steel wire rope cemented filling method used in open stope mining subsequent filling gob
CN203962035U (en) Down-hole gob-side entry retaining support bag
CN212612486U (en) Side wall grouting device for drilling retaining wall of stratum easy to collapse
CN203476390U (en) High-water filling bag for coal mine
CN203546733U (en) Mass hollow concrete structure used for large-scale cavity backfilling

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180806

Address after: 056200 people's East Street, Fengfeng Town, Fengfeng mining area, Handan, Hebei.

Patentee after: Handan Fengfeng Zhi Xiang Machinery Manufacturing Co., Ltd.

Address before: 056000 -2A-501, 891 Cemetery Road, Hanshan District, Handan, Hebei

Patentee before: Xu Gang

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190712

Address after: 047199 Jiazhang Village, Jiazhang Town, Changzhi County, Shanxi Province

Patentee after: Shanxi Hongrong Technology Co., Ltd.

Address before: 056200 People's East Street, Fengfeng Town, Fengfeng Mining Area, Handan City, Hebei Province

Patentee before: Handan Fengfeng Zhi Xiang Machinery Manufacturing Co., Ltd.

TR01 Transfer of patent right