CN203475832U - Early-dismounted independent supporting strip - Google Patents

Early-dismounted independent supporting strip Download PDF

Info

Publication number
CN203475832U
CN203475832U CN201320567906.2U CN201320567906U CN203475832U CN 203475832 U CN203475832 U CN 203475832U CN 201320567906 U CN201320567906 U CN 201320567906U CN 203475832 U CN203475832 U CN 203475832U
Authority
CN
China
Prior art keywords
support bar
keelson
top plate
open
early
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201320567906.2U
Other languages
Chinese (zh)
Inventor
陈耀钢
董年才
张军
钱益锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Zhongnan Construction Industry Group Co Ltd
Original Assignee
Jiangsu Zhongnan Construction Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Zhongnan Construction Industry Group Co Ltd filed Critical Jiangsu Zhongnan Construction Industry Group Co Ltd
Priority to CN201320567906.2U priority Critical patent/CN203475832U/en
Application granted granted Critical
Publication of CN203475832U publication Critical patent/CN203475832U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses an early-dismounted independent supporting strip. The early-dismounted independent supporting strip comprises a plurality of early-dismounted devices which are arranged in parallel. Each early-dismounted device comprises steel supports (1), a standard keel (2) and side keels (3) and is characterized by further comprising top plate supporting heads (4), connecting plates (5) and connecting ribs (6), wherein the lower ends of the top plate supporting heads (4) are connected with the steel supports (1), and the left ends and the right ends of the top plate supporting heads (4) are connected with the standard keel (2) and the side keels (3) through the connecting plates (5) and the connecting ribs (6) respectively. The early-dismounted independent supporting strip is reasonable in design, safe, reliable, and capable of being popularized and applied widely.

Description

Tear independent support band a kind of morning open
Technical field
The utility model relates to a kind of morning and tears independent support band open, belongs to technical field of building construction.
Background technology
In concrete structure construction, for shortening the striking time of slab form, accelerate the turnover of the material tools such as slab form, reduce the input of building slab plate tool simultaneously, usual way is to adopt the form that early dismantling head is set to realize the early stage slab form of removing at present.Its operating principle is torn exactly plate open and is not torn supporting head open, and when floor concrete casting is after 3~4 days, concrete strength reaches 50% when above of design strength, and dismountable slab form and part support, and column is torn early head open and still kept holding state.When concrete strength reaches designing requirement, then remove whole vertical supportings.
In practical operation, early dismantling head is set and has following hidden danger at the scene:
1) because operator's technical level is uneven, often random large when early dismantling head is set, cannot guarantee that early dismantling head spacing concrete strength when form removal can meet code requirement;
2) because early dismantling head is arranged in vertical rod, with periphery vertical rod indistinction, operator often seeks convenient all vertical rods can being connected as a single entity when stripping vertical rod, remove in the lump, again support top again, so, exists serious structural safety and hidden danger of quality subsequently, do not have the effect of independent support at all, and the common existence at the construction field (site) of this phenomenon;
3) early dismantling head itself only depends on a small size iron plate to contact with concrete surface, and Area of bearing is limited.Because vertical rod is thinner, sometimes cannot become a vertical line with early dismantling head simultaneously, have a strong impact on its stressed and stability.
The utility model is based on said structure safety and hidden danger of quality, arranges early to tear independent support band open and can address the above problem.
Utility model content
Technical problem to be solved in the utility model is, a kind of spacing criterion settings is provided, independent support, tear independent support band the morning of firm supporting open.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is:
Tear independent support band a kind of morning open, early-dismantling device for several parallel arrangements, described early-dismantling device comprises: steel support, standard keel and keelson, it is characterized in that: also comprise top plate supporting head, junction plate and connection rib, a described top plate supporting lower end and described steel support and connection, a described top plate supporting left and right two ends by described junction plate be connected rib and be connected with keelson with described standard keel respectively.
Described top plate supporting head comprises big up and small down trapezoidal supporting member and the support bar supporting for inserting described steel, and described supporting member and support bar are one-body molded, and described top plate supporting head is cast member or Al-alloy parts.
The forward and backward face of described supporting member is all provided with for placing the first groove of described connection rib.
Described junction plate comprise for connect described standard keel or keelson link and for place described connection rib and forward and backward the second groove that all has setting, described connection rib is fixed with pin after being positioned in described the first groove and the second groove, and described junction plate is 2 with the number that is connected rib.
Described link is the trapezoidal of up big and down small and top end opening, described standard keel or keelson are that hollow bottomless and bottom surface is provided with 2 inside horizontal chimbs, and the top length of side of described link is less than the hollow chamber length of described standard keel or keelson and is greater than the length difference of described hollow chamber and two chimbs.
Described steel supports and comprises upper support bar, lower support bar, thread head, adjuster and supporting latch, described lower support bar bottom ground connection, the described thread head of top cover bag, described adjuster inner side is provided with the internal thread being used in combination with described thread head, described adjuster is the hollow tube being assembled on described thread head, the bottom of described upper support bar is inserted cover and is had after the lower support bar of described adjuster with described supporting latch and fixes after being arranged at the jack of described upper support bar and lower support bar, and described support bar inserts the top of described upper support bar.
Type linearly after being connected of described standard keel or keelson and described top plate supporting head, the trapezoidal acute angle angle that is described top plate supporting head is identical with the link angle of described standard keel or keelson, and described standard keel or keelson are steel plate or aluminium alloy plate.
The spacing of adjacent described early-dismantling device is less than 2m.
Installation and the demounting procedure of tearing independent support band described morning open are:
Step 1: according to scene often across carrying out snap the line location to be less than 2m spacing on the clear distance ,Xian lower floor slab form face between slab form;
Step 2: according to snap the line anchor point, described steel is installed and is supported: fixing described lower support bar bottom, after the described thread head of described lower support bar top cover bag, on described thread head, assemble after described adjuster, described upper support bar is inserted and installed after the lower support bar of described adjuster, preliminary adjusting height also inserts the support bar of described top plate supporting head behind the top of described upper support bar, with the fixing described upper support bar of described supporting latch and lower support bar, the height that utilizes adjuster to finely tune described steel support makes described top plate supporting head and described standard keel or keelson be positioned at same level position,
Step 3: connect described top plate supporting head and described standard keel or keelson: described junction plate is connected with described standard keel or keelson, and method of attachment is put into the other end after link one end of described junction plate being tilted to enter the hollow chamber of described standard keel or keelson again; 2 described connection ribs are positioned over and are positioned at the second groove of forward and backward of described junction plate and are positioned at described top plate supporting head) first groove of forward and backward, put the described pin of rear use well and fix, make 2 connection ribs clamp described junction plate and described top plate supporting head;
Step 4: slab form is installed, is carried out building operations;
Step 5: when floorslab concrete intensity reaches 50% when above of design strength, remove and early tear all supports and the slab form outside independent support band open, accelerate the turnover of slab form, reduce the input of slab form simultaneously;
Step 6: when floorslab concrete reaches code requirement, remove and tear independent support band described morning open, method for dismounting is: first pull out described pin, take off described connection rib and junction plate, unload described standard keel and keelson, rotate described adjuster, described top plate supporting head is declined, take out described top plate supporting head, remove described steel and support, complete the dismounting of tearing independent support band open described morning.
Tear independent support band a kind of morning that the utility model provides open, utilize junction plate and be connected rib fixedly top plate supporting head and standard keel or keelson, this kind of connected mode replaced an original small size iron plate and contacted with concrete surface, be that contact area is little, built on the sand, easily discontinuity causes construction dangerous in contact; In addition, independently, adjustable, the setting that the steel of constant spacing supports, makes load-bearing more reasonable, through measuring and calculating, each steel is supported in the short stress across being less than 2m of slab form, and load-bearing is more even, constructs safer.It is reasonable, safe and reliable that tear independent support strip design a kind of morning that the utility model provides open, can wide popularization and application.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the structural representation of early-dismantling device;
Fig. 3 is the structural representation of top plate supporting head;
Fig. 4 is left view or the right view of Fig. 3;
Fig. 5 is the structural representation of junction plate;
Fig. 6 is left view or the right view of Fig. 5.
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is further described.
As shown in Fig. 1-6, tear independent support band a kind of morning open, early-dismantling device for several parallel arrangements, described early-dismantling device comprises: steel support 1, standard keel 2 and keelson 3, it is characterized in that: also comprise top plate supporting 4, junction plate 5 and be connected rib 6, described top plate supporting 4 lower end are supported 1 with described steel and are connected, a described top plate supporting 4 left and right two ends by described junction plate 5 be connected rib 6 and be connected with keelson 3 with described standard keel 2 respectively.
Described top plate supporting 4 comprises big up and small down trapezoidal supporting member 7 and supports 1 support bar 8 for inserting described steel, and described supporting member 7 and support bar 8 are one-body molded, and described top plate supporting 4 is cast member or Al-alloy parts.
The forward and backward face of described supporting member 7 is all provided with for placing the first groove 9 of described connection rib 6.
Described junction plate 5 comprise for connect described standard keel 2 or keelson 3 link 16 and for place described connection rib 6 and forward and backward the second groove 10 that all has setting, described connection rib 6 is positioned over described the first groove 9 and the second groove 10 is interior with pin, fixes afterwards, and described junction plate 5 is 2 with the number that is connected rib 6.
Described link 16 is the trapezoidal of up big and down small and top end opening, described standard keel 2 or keelson 3 is provided with 2 inside horizontal chimbs for hollow bottomless and bottom surface, and the top length of side of described link 16 is less than the hollow chamber length of described standard keel 2 or keelson 3 and is greater than the length difference of described hollow chamber and two chimbs.
Described steel supports 1 and comprises upper support bar 11, lower support bar 12, thread head 13, adjuster 14 and supporting latch 15, described lower support bar 12 bottom ground connection, the described thread head 13 of top cover bag, described adjuster 14 inner sides are provided with the internal thread being used in combination with described thread head 13, described adjuster 14 is for being assembled in the hollow tube on described thread head 13, the bottom insertion cover of described upper support bar 11 is fixed after having the described supporting latch 15 of the rear use of lower support bar 12 of described adjuster 14 to pass the jack that is arranged at described upper support bar 11 and lower support bar 12, the top that described support bar 8 inserts described upper support bar 11.
Type linearly after being connected of described standard keel 2 or keelson 3 and described top plate supporting 4, the trapezoidal acute angle angle that is described top plate supporting 4 is identical with the link angle of described standard keel 2 or keelson 3, be 70 °, described standard keel 2 or keelson 3 are steel plate or aluminium alloy plate.
The spacing of adjacent described early-dismantling device is less than 2m.
Installation and the demounting procedure of tearing independent support band described morning open are:
Step 1: according to scene often across carrying out snap the line location to be less than 2m spacing on the clear distance ,Xian lower floor slab form face between slab form;
Step 2: according to snap the line anchor point, described steel is installed and is supported 1: fixing described lower support bar 12 bottoms, after the described thread head 13 of described lower support bar 12 top cover bag, on described thread head 13, assemble after described adjuster 14, described upper support bar 11 is inserted and installed after the lower support bar 12 of described adjuster 14, preliminary regulate height and the support bar 8 of described top plate supporting 4 is inserted behind the top of described upper support bar 11, with the fixing described upper support bar 11 of described supporting latch 15 and lower support bar 12, utilizing the described steel of adjuster 14 fine setting to support 1 height makes described top plate supporting 4 and described standard keel 2 or keelson 3 be positioned at same level position,
Step 3: connect described top plate supporting 4 and described standard keel 2 or keelson 3: described junction plate 5 is connected with described standard keel 2 or keelson 3, and method of attachment is put into the other end after the link of described junction plate 16 one end being tilted to enter the hollow chamber of described standard keel 2 or keelson 3 again; 2 described connection ribs 6 are positioned over to the first groove 9 that is positioned at the second groove 10 of forward and backward of described junction plate 5 and is positioned at described top plate supporting 4 forward and backward, put the described pin of rear use well and fix, make 2 to connect ribs 6 and clamp described junction plates 5 and described top plate supporting 4;
Step 4: slab form is installed, is carried out building operations;
Step 5: when floorslab concrete intensity reaches 50% when above of design strength, remove and early tear all supports and the slab form outside independent support band open, accelerate the turnover of slab form, reduce the input of slab form simultaneously;
Step 6: when floorslab concrete reaches code requirement, remove and tear independent support band described morning open, method for dismounting is: first pull out described pin, take off described connection rib 6 and junction plate 5, unload described standard keel 2 and keelson 3, rotate described adjuster 14, make 4 decline of described top plate supporting, take out described top plate supporting 4, remove described steel and support 1, complete the dismounting of tearing independent support band open described morning.
The above is only preferred embodiment of the present utility model; be noted that for those skilled in the art; do not departing under the prerequisite of the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection domain of the present utility model.

Claims (8)

1. tear independent support band a morning open, early-dismantling device for several parallel arrangements, described early-dismantling device comprises: steel supports (1), standard keel (2) and keelson (3), it is characterized in that: also comprise top plate supporting head (4), junction plate (5) and be connected rib (6), described top plate supporting head (4) lower end is supported (1) with described steel and is connected, the left and right two ends of described top plate supporting head (4) by described junction plate (5) be connected rib (6) and be connected with keelson (3) with described standard keel (2) respectively.
2. tear independent support band a kind of morning according to claim 1 open, it is characterized in that: described top plate supporting head (4) comprises big up and small down trapezoidal supporting member (7) and for inserting described steel, supports the support bar (8) of (1), described supporting member (7) and support bar (8) are one-body molded, and described top plate supporting head (4) is cast member or Al-alloy parts.
3. tear independent support band open a kind of morning according to claim 2, it is characterized in that: the forward and backward face of described supporting member (7) is all provided with for placing first groove (9) of described connection rib (6).
4. tear independent support band a kind of morning according to claim 3 open, it is characterized in that: described junction plate (5) comprise for connect described standard keel (2) or keelson (3) link (16) and for place described connection rib (6) and forward and backward the second groove (10) that all has setting, described connection rib (6) is fixed with pin after being positioned in described the first groove (9) and the second groove (10), and described junction plate (5) is 2 with the number that is connected rib (6).
5. tear independent support band a kind of morning according to claim 4 open, it is characterized in that: described link (16) is trapezoidal for up big and down small and top end opening, described standard keel (2) or keelson (3) are provided with 2 inside horizontal chimbs for hollow bottomless and bottom surface, and the top length of side of described link (16) is less than the hollow chamber length of described standard keel (2) or keelson (3) and is greater than the length difference of described hollow chamber and two chimbs.
6. tear independent support band a kind of morning according to claim 2 open, it is characterized in that: described steel supports (1) and comprises upper support bar (11), lower support bar (12), thread head (13), adjuster (14) and supporting latch (15), described lower support bar (12) bottom ground connection, top cover bag described thread head (13), described adjuster (14) inner side is provided with the internal thread being used in combination with described thread head (13), described adjuster (14) is for being assembled in the hollow tube on described thread head (13), the bottom of described upper support bar (11) is inserted cover and is had after the lower support bar (12) of described adjuster (14) with described supporting latch (15) and fixes after being arranged at the jack of described upper support bar (11) and lower support bar (12), described support bar (8) inserts the top of described upper support bar (11).
7. tear independent support band a kind of morning according to claim 1 open, it is characterized in that: described standard keel (2) or keelson (3) type linearly after being connected with described top plate supporting head (4), the trapezoidal acute angle angle that is described top plate supporting head (4) is identical with the link angle of described standard keel (2) or keelson (3), and described standard keel (2) or keelson (3) are steel plate or aluminium alloy plate.
8. tear independent support band open a kind of morning according to claim 1, it is characterized in that: the spacing of adjacent described early-dismantling device is less than 2m.
CN201320567906.2U 2013-09-13 2013-09-13 Early-dismounted independent supporting strip Withdrawn - After Issue CN203475832U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320567906.2U CN203475832U (en) 2013-09-13 2013-09-13 Early-dismounted independent supporting strip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320567906.2U CN203475832U (en) 2013-09-13 2013-09-13 Early-dismounted independent supporting strip

Publications (1)

Publication Number Publication Date
CN203475832U true CN203475832U (en) 2014-03-12

Family

ID=50224186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320567906.2U Withdrawn - After Issue CN203475832U (en) 2013-09-13 2013-09-13 Early-dismounted independent supporting strip

Country Status (1)

Country Link
CN (1) CN203475832U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452313A (en) * 2013-09-13 2013-12-18 南通建筑工程总承包有限公司 Early-removing independent support strip
CN105696806A (en) * 2016-01-26 2016-06-22 晟通科技集团有限公司 Supporting device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103452313A (en) * 2013-09-13 2013-12-18 南通建筑工程总承包有限公司 Early-removing independent support strip
CN103452313B (en) * 2013-09-13 2015-07-08 江苏中南建筑产业集团有限责任公司 Early-removing independent support strip
CN105696806A (en) * 2016-01-26 2016-06-22 晟通科技集团有限公司 Supporting device

Similar Documents

Publication Publication Date Title
CN103452313B (en) Early-removing independent support strip
CN204645623U (en) Aluminium alloys wafts window template system
CN106988529B (en) A kind of stair template structure and the stair construction method using the formwork structure
CN209457425U (en) A kind of ancient architecture wall recovery support
CN209163516U (en) A kind of post-cast strip tool support device
CN105952154B (en) A kind of concrete-pouring template stent
CN203475832U (en) Early-dismounted independent supporting strip
CN209723016U (en) Foundation structure for tower crane
CN207761334U (en) A kind of adjustable late poured band support device
CN104060814A (en) Cantilever beam anchoring piece and mounting method and dismounting method thereof
CN105926925A (en) Joist steel cantilever beam of suspended scaffold and construction method thereof
CN211815611U (en) Detachable bracket
CN106284989B (en) The sliding form bracing system of double track and complete construction method
CN204098488U (en) A kind of fixed structure of end bay beam forms
CN204059206U (en) A kind of bridge construction Support bracket
CN207686280U (en) A kind of aluminum alloy mould plate early dismantling head device that assortable full hall scaffold uses
CN110616737A (en) Method for improving positioning qualification rate of pipe gallery embedded part
CN202447878U (en) Simple aligning line rack for installation centre line of detachable equipment
CN214834735U (en) A fast-assembling support die carrier for face is early torn open
CN205976472U (en) Pour mould of building post -cast strip
CN109653770A (en) A kind of middle board construction method carried out using original temporary support
CN204959617U (en) A support for supporting template of initial piece of bridge case roof beam
CN213449476U (en) Novel building template
CN205296821U (en) Oblique roofing formwork system of heavy grade cast in situ concrete
CN209441548U (en) A kind of steel strut disassembly auxiliary mould

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140312

Effective date of abandoning: 20150708

AV01 Patent right actively abandoned

Granted publication date: 20140312

Effective date of abandoning: 20150708

RGAV Abandon patent right to avoid regrant