CN203474711U - Quick coke raking machine of coke oven - Google Patents

Quick coke raking machine of coke oven Download PDF

Info

Publication number
CN203474711U
CN203474711U CN201320558196.7U CN201320558196U CN203474711U CN 203474711 U CN203474711 U CN 203474711U CN 201320558196 U CN201320558196 U CN 201320558196U CN 203474711 U CN203474711 U CN 203474711U
Authority
CN
China
Prior art keywords
burnt
coke
slusher
take
raking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320558196.7U
Other languages
Chinese (zh)
Inventor
丁满占
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TANGSHSAN JIAHUA COAL CHEMICAL INDUSTRY Co Ltd
Original Assignee
TANGSHSAN JIAHUA COAL CHEMICAL INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TANGSHSAN JIAHUA COAL CHEMICAL INDUSTRY Co Ltd filed Critical TANGSHSAN JIAHUA COAL CHEMICAL INDUSTRY Co Ltd
Priority to CN201320558196.7U priority Critical patent/CN203474711U/en
Application granted granted Critical
Publication of CN203474711U publication Critical patent/CN203474711U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Coke Industry (AREA)

Abstract

The utility model relates to a quick coke raking machine of a coke oven, belonging to the technical field of coke raking equipment of coke ovens. The quick coke raking machine is used for quickly removing fiery coke out of a hearth. According to the technical scheme, a travelling platform is installed outside a coke pushing machine, a traveling device is installed on the traveling platform, an operating table is installed on the traveling device, the rear end of a coke raking arm is installed on the upper part of the operating table, the front end of the coke raking arm is connected with a coke raking slusher, the lower end of a cylinder body of a pitching oil cylinder is connected with the lower part of the operating table, the front end of an oil cylinder push rod of the pitching oil cylinder is connected with the coke raking arm, and the pitching oil cylinder is connected with a hydraulic device. According to the quick coke raking machine provided by the utility model, the coke raking arm and the coke raking slusher can complete pitching movement by virtue of the pitching oil cylinder and the traveling device can move forward and backward and can work together with the pitching movement to realize the coke raking operation. According to the quick coke raking machine provided by the utility model, the coke raking operation time can be extremely shortened, a series of problems caused by manual coke raking operation are eliminated, and meanwhile, a plenty of manpower and material resources are reduced, thereby not only preventing personnel and equipment from being burnt by fiery coke, but also protecting the safety of the furnace body and prolonging the service life of the furnace body.

Description

A kind of coke oven is taken off burnt machine fast
Technical field
The utility model relates to a kind of from clawing the device of coke in coke oven burner hearth, particularly at coke oven, occurs in coke pushing is at need by burner hearth that red-hot coke clears out equipment fast, belongs to coke oven and takes off burnt equipment technical field.
Background technology
In coke oven is produced, the impact along with the factors such as frequent replacings of day by day in short supply and blending ratio of aging, the coal blending resource in coke oven furnace life, often there will be coke pushing difficult in the daily production operation of coke oven.The method of processing at present coke pushing difficulty is still traditional use pushing ram and summarized bucket, and circulation pinch coke, coordinates a large amount of manpowers to take off Jiaozhuo industry, and the time is long, operation is slow, personal security can not get ensureing and have a strong impact on subsequent production operation.
Traditional take off Jiaozhuo owner and want that there are the following problems:
1, summarized bucket (approximately 1050 ℃) cycle operation under the burner hearth of high temperature carbonization chamber, the barbecue of red-hot coke, extruding in addition, very easily causes summarized bucket distortion or drops and in burner hearth, cause body of heater to damage.
2, to load red burnt amount very little for summarized bucket single, needs manually closely remove the coke in summarized bucket again, last water put out by water just can, operation field temperature is high, equipment damage is large, environment is poor, operating efficiency is extremely low, hand labor intensity is large.
3, take off at every turn Jiaozhuo industry need make charge of coke and both sides furnace wall expose obvious shrinkage joint just can secondary coke pushing, on average take off burnt time 6 ~ 8h/ stove, efficiency is extremely low, and long-time open fire door causes furnace wall craze and transfiguration, has a strong impact on converter life.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of coke oven and takes off fast burnt machine, thisly take off fast burnt machine and can complete fast and take off Jiao, coke discharging operation, improve coke oven and take off burnt operating speed, reduce and manually take off burnt labour intensity, effectively guarantee converter life and operating personnel's safety.
The technical scheme solving the problems of the technologies described above is:
A kind of coke oven is taken off burnt machine fast, it by wheel platform, running gear, take off burnt slusher, take off burnt large arm, pitching oil cylinder and operator's console and form, wheel platform is arranged on pushing machine outside, running gear is arranged on wheel platform, operator's console is arranged on running gear, the rear end of taking off burnt large arm is arranged on the top of operator's console, the front end of taking off burnt large arm connects takes off burnt slusher, the cylinder body lower end of pitching oil cylinder is connected with operator's console bottom, the cylinder putter front end of pitching oil cylinder with take off burnt large arm and be connected, pitching oil cylinder is connected with hydraulic efficiency plant.
Above-mentioned coke oven is taken off burnt machine fast, and described wheel platform height, between coke oven operating floor and pushing machine main platform, has track on wheel platform, and track centerline is parallel with coking chamber medullary ray.
Above-mentioned coke oven is taken off burnt machine fast, and described running gear is comprised of traveling wheels and two running motors, and traveling wheels match with the track of wheel platform, and two running motors are connected with traveling wheels, synchronously drive traveling wheels to move forward and backward along track.
Above-mentioned coke oven is taken off burnt machine fast, described take off burnt slusher and take off burnt large arm assembled by the welding of heat-resistant antifriction material, it is wide that the width of taking off burnt slusher is narrower than the hole of coking chamber, adopt hook machine grab bucket, there is supporting replaceable antiwear heat resisting rake teeth, take off burnt large arm and adopt flange to be connected with taking off burnt slusher, the width of taking off burnt large arm is narrower than takes off burnt slusher, and while guaranteeing operation, the two all keeps a safe distance with coking chamber metope.
Above-mentioned coke oven is taken off burnt machine fast, and described pitching oil cylinder is connected with pushing machine hydraulic efficiency system, or sets up hydraulic efficiency plant separately.
Above-mentioned coke oven is taken off burnt machine fast, described in take off burnt slusher, take off the medullary ray of burnt large arm, running gear, operator's console and coking chamber medullary ray on same axis.
Above-mentioned coke oven is taken off burnt machine fast, described in take off the maximum height that burnt slusher lifts and push up 10cm lower than coking chamber, take off the minimum altitude of digging under burnt slusher higher than coking chamber at the bottom of 5cm, the width of taking off burnt slusher is less than coking chamber both sides metope 5cm.
Usefulness of the present utility model is:
The utility model is realized the pitching of taking off burnt large arm and taking off burnt slusher by pitching oil cylinder and is moved, and coordinates running gear forward-reverse to complete and takes off Jiaozhuo industry.The utility model can greatly reduce takes off burnt activity duration to 2 ~ 3h/ stove; eliminate the series of problems producing while manually taking off Jiaozhuo industry; reduce a large amount of human and material resources simultaneously, both avoided because of red-hot coke burn personnel, equipment, protect again body of heater safely, extended life-span of body of heater.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is running gear structural representation.
In figure, mark is as follows: wheel platform 1, running gear 2, take off burnt slusher 3, take off burnt large arm 4, at the bottom of pitching oil cylinder 5, operator's console 6, traveling wheels 7, running motor 8, coking chamber top 9, coking chamber 10, red-hot coke 11.
Embodiment
The utility model by wheel platform 1, running gear 2, take off burnt slusher 3, take off burnt large arm 4, pitching oil cylinder 5 and operator's console 6 and form.
In figure, show, wheel platform 1 is welded by joist steel, and wheel platform 1 is arranged on pushing machine outside, and wheel platform 1 height, between coke oven operating floor and pushing machine main platform, has track on wheel platform 1, and track centerline is parallel with coking chamber medullary ray.
In figure, show, running gear 2 is arranged on wheel platform 1, and running gear 2 is comprised of traveling wheels 7 and two running motors 8, and traveling wheels 7 match with the track of wheel platform 1, two running motors 8 are connected with traveling wheels 7, synchronously drive traveling wheels 7 to move forward and backward along track.
In figure, show, operator's console 6 is arranged on running gear 2, and the rear end of taking off burnt large arm 4 is arranged on the top of operator's console 6, and the front end of taking off burnt large arm 4 connects takes off burnt slusher 3.Take off burnt slusher 3 and take off burnt large arm 4 assembled by the welding of heat-resistant antifriction material, it is wide that the width of taking off burnt slusher 3 is slightly narrower than the hole of coking chamber, adopt hook machine grab bucket, there is supporting replaceable antiwear heat resisting rake teeth, take off burnt large arm 4 and take off burnt slusher 3 employing flanges and be connected, the width of taking off burnt large arm 3 is slightly narrower than takes off burnt slusher 3, and while guaranteeing operation, the two all keeps a safe distance with coking chamber metope.Take off burnt slusher 3, take off the medullary ray of burnt large arm 4, running gear 2, operator's console 6 and coking chamber medullary ray on same axis.
In figure, show, the cylinder body lower end of pitching oil cylinder 5 is connected with operator's console 6 bottoms, the cylinder putter front end of pitching oil cylinder 5 with take off being connected of burnt large arm 4, pitching oil cylinder 5 is connected with pushing machine hydraulic efficiency system, or sets up hydraulic efficiency plant separately.
The stroke upper limit of pitching oil cylinder 5 guarantees to take off the safe distance that burnt slusher is not less than coking chamber top 10cm, and stroke lower limit guarantees to take off the safe distance that burnt slusher is not less than 5cm at the bottom of coking chamber.The width of taking off burnt slusher 3 guarantees to be not less than the safe distance of coking chamber both sides metope 5cm, takes off burnt large 4, arm and is not wider than and takes off burnt slusher 3.
Working method of the present utility model:
During operation, pushing machine traveling contraposition makes to take off burnt slusher 3 and aims at the medullary ray of wanting to take off burnt coking chamber, drive pitching oil cylinder 5 to lift and take off burnt large arm 4 and take off burnt slusher 3 to a little higher than coke height, drive running gear 2 to make forward to take off burnt slusher 3 and enter into coking chamber coke top, then put down and take off burnt large arm 4 and make to take off burnt slusher 3 and drop down onto on coke, finally drive running gear 2 to walk to be about to backward the coke coking chamber of raking off, lift again pitching oil cylinder 5, complete and take off burnt action, this cover that circulates has moved takes off Jiaozhuo industry.

Claims (7)

1. a coke oven is taken off burnt machine fast, it is characterized in that: it is by wheel platform (1), running gear (2), take off burnt slusher (3), take off burnt large arm (4), pitching oil cylinder (5) and operator's console (6) form, wheel platform (1) is arranged on pushing machine outside, running gear (2) is arranged on wheel platform (1), operator's console (6) is arranged on running gear (2), the rear end of taking off burnt large arm (4) is arranged on the top of operator's console (6), the front end of taking off burnt large arm (4) connects takes off burnt slusher (3), the cylinder body lower end of pitching oil cylinder (5) is connected with operator's console (6) bottom, the cylinder putter front end of pitching oil cylinder (5) with take off burnt large arm (4) and be connected, pitching oil cylinder (5) is connected with hydraulic efficiency plant.
2. coke oven according to claim 1 is taken off burnt machine fast, it is characterized in that: described wheel platform (1) height is between coke oven operating floor and pushing machine main platform, and wheel platform has track on (1), and track centerline is parallel with coking chamber medullary ray.
3. the coke oven of telling according to claim 2 is taken off burnt machine fast, it is characterized in that: described running gear (2) is comprised of traveling wheels (7) and two running motors (8), traveling wheels (7) match with the track of wheel platform (1), and two running motors (8) are connected with traveling wheels (7).
4. coke oven according to claim 3 is taken off burnt machine fast, it is characterized in that: described in take off burnt slusher (3) and take off burnt large arm (4) assembled by the welding of heat-resistant antifriction material, it is wide that the width of taking off burnt slusher (3) is narrower than the hole of coking chamber, adopt hook machine grab bucket, there is supporting replaceable antiwear heat resisting rake teeth, take off burnt large arm (4) and adopt flange to be connected with taking off burnt slusher (3), the width of taking off burnt large arm (4) is narrower than takes off burnt slusher (3).
5. coke oven according to claim 4 is taken off burnt machine fast, it is characterized in that: described pitching oil cylinder (5) is connected with pushing machine hydraulic efficiency system, or sets up hydraulic efficiency plant separately.
6. coke oven according to claim 5 is taken off burnt machine fast, it is characterized in that: described in take off burnt slusher (3), take off the medullary ray of burnt large arm (4), running gear (2), operator's console (6) and coking chamber medullary ray on same axis.
7. coke oven according to claim 6 is taken off burnt machine fast, it is characterized in that: described in take off the maximum height that burnt slusher (3) lifts and push up 10cm lower than coking chamber, take off the minimum altitude of digging under burnt slusher (3) higher than coking chamber at the bottom of 5cm, the width of taking off burnt slusher (3) is less than coking chamber both sides metope 5cm.
CN201320558196.7U 2013-09-10 2013-09-10 Quick coke raking machine of coke oven Expired - Fee Related CN203474711U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320558196.7U CN203474711U (en) 2013-09-10 2013-09-10 Quick coke raking machine of coke oven

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320558196.7U CN203474711U (en) 2013-09-10 2013-09-10 Quick coke raking machine of coke oven

Publications (1)

Publication Number Publication Date
CN203474711U true CN203474711U (en) 2014-03-12

Family

ID=50223079

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320558196.7U Expired - Fee Related CN203474711U (en) 2013-09-10 2013-09-10 Quick coke raking machine of coke oven

Country Status (1)

Country Link
CN (1) CN203474711U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105062513A (en) * 2015-08-18 2015-11-18 河北钢铁股份有限公司邯郸分公司 Device capable of achieving automatic coke scraping operation of coke pusher

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105062513A (en) * 2015-08-18 2015-11-18 河北钢铁股份有限公司邯郸分公司 Device capable of achieving automatic coke scraping operation of coke pusher
CN105062513B (en) * 2015-08-18 2017-03-15 河北钢铁股份有限公司邯郸分公司 The device of burnt operation taken off automatically by a kind of achievable pusher machine

Similar Documents

Publication Publication Date Title
CN203474711U (en) Quick coke raking machine of coke oven
CN104312596A (en) Tamping coke oven U-shaped pipe smoke-guide trolley with mobile smoke guide pipe and application method of smoke-guide trolley
CN105039665A (en) Closed type heat treatment quenching equipment with oil fume purification function
CN103351883B (en) Biomass carbonization technology and equipment
CN203011154U (en) Special hole drilling and plugging machine for calcium carbide furnaces
CN204981973U (en) Closed thermal treatment quenching equipment of taking oil smoke purification performance
CN106524181A (en) Flat pushing type feeding device for incineration fire grate
CN205874301U (en) Burnt jar of counterpointing that need not to park covers device with taking off
CN211896789U (en) Automatic temperature measuring device for fire observation hole on top of coke oven
CN212174992U (en) Closed quenching device of bottom charging furnace of heat treatment production line
CN203474862U (en) Abrasion-resistant steel ball quenching furnace auxiliary device
CN202346957U (en) Dual-pipe dual-conduction smoke-conducting and smoke-removing car for tamping coke oven
CN216337782U (en) Preheating device for baking steel scrap
CN206338814U (en) A kind of flat push type burns fire grate charging gear
CN213750806U (en) Hydraulic pressure equipment stove car head-off and landing head-on
CN215799311U (en) Coke pushing device of coke oven
CN201704207U (en) Quartz tube dehydroxylation furnace access device
CN219440776U (en) Tar slag discharging device
CN204824052U (en) Parallel elevating gear of many spaders
CN219239573U (en) Coke pushing device of coke pushing vehicle
CN217018976U (en) Movable dust hood
CN204854362U (en) Vertical business turn over is expected machine and is had equipment of firing of this vertical business turn over material machine
CN204981745U (en) Automobile -used firehole cleaning device of stamping charging coke oven U type piping cigarette
CN113957488B (en) Maintenance heating and dust collection integrated machine for aluminum electrolysis crust breaking cylinder
CN219195023U (en) Scrap steel loading device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20170411

Granted publication date: 20140312

PD01 Discharge of preservation of patent
PD01 Discharge of preservation of patent

Date of cancellation: 20190411

Granted publication date: 20140312

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140312

Termination date: 20180910