CN203464539U - Cold and warm water machine capable of providing sanitary hot water - Google Patents

Cold and warm water machine capable of providing sanitary hot water Download PDF

Info

Publication number
CN203464539U
CN203464539U CN201320438762.0U CN201320438762U CN203464539U CN 203464539 U CN203464539 U CN 203464539U CN 201320438762 U CN201320438762 U CN 201320438762U CN 203464539 U CN203464539 U CN 203464539U
Authority
CN
China
Prior art keywords
hot water
valve
health hot
cryogen
temperature generator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320438762.0U
Other languages
Chinese (zh)
Inventor
陈瑞杏
穆永明
贾世明
王友良
段永红
姜习贤
王沙千
徐祥根
王文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ebara Refrigeration Equipment and Systems China Co Ltd
Original Assignee
RENYUAN AIR CONDITIONER EQUIPMENT CO Ltd YANTAI CITY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RENYUAN AIR CONDITIONER EQUIPMENT CO Ltd YANTAI CITY filed Critical RENYUAN AIR CONDITIONER EQUIPMENT CO Ltd YANTAI CITY
Priority to CN201320438762.0U priority Critical patent/CN203464539U/en
Application granted granted Critical
Publication of CN203464539U publication Critical patent/CN203464539U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

A cold and warm water machine capable of providing sanitary hot water is composed of a lithium bromide absorption unit and comprises a high temperature generator and a sanitary hot water refrigerant condensation pipeline connected with a sanitary hot water heat exchanger, wherein a sanitary hot water refrigerant condensation control valve is arranged on the sanitary hot water refrigerant condensation pipeline. The cold and warm water machine further comprises a low temperature generator, a solution pump and an absorber, wherein a first switching valve is arranged on the sanitary hot water refrigerant condensation pipeline between the sanitary hot water refrigerant condensation control valve and the high temperature generator; a refrigerant condensate water pipeline communicated with a refrigerant condensation outlet pipeline of the low temperature generator is arranged on the sanitary hot water refrigerant condensation pipeline between the sanitary hot water refrigerant condensation control valve and the first switching valve; a second switching valve is arranged on the refrigerant condensate water pipeline. By means of the cold and warm water machine, unit refrigerating efficiency under all operation modes can be effectively increased, wear on component parts and the valve of the unit is reduced, and potential operation risks and cost are further reduced.

Description

A kind of cold warm water machine that health hot water is provided
Technical field
The utility model relates to a kind of air-conditioning system, particularly relates to a kind of air-conditioning system of lithium bromide absorption cooling and warming water machine.
Background technology
Along with the raising of people's quality of life, except there being the demand of air conditioner cold-warm, increasing user also has the demand of continual use health hot water.In order to adapt to the variation of this market demand, the producer of more and more freezing is devoted to the lithium-bromide absorption-type refrigerating machine that exploitation provides health hot water.Common way on market is on lithium bromide absorption cooling and warming water machine basis, to append health hot water heat exchanger now, usually health hot water heat exchanger is arranged on high-temperature generator, the solidifying water of cryogen in health hot water heat exchanger has returns to high-temperature generator, and entering in kind of refrigeration cycle of having gone; Cooling condition and heating operating mode realize by changes in temperature transfer valve is set.
As shown in Figure 1, existing lithium bromide absorption cooling and warming water machine group in the fall, when winter and spring, for warm water is produced separately operation mode, be high-temperature generator independent operation pattern: first valve-off (solution inlet port transfer valve) F1, valve (taphole transfer valve) F2, valve (refrigerant vapour outlet transfer valve) F3, open valve (air-conditioning heating water heat exchanger cryogen Condensate Controlling Equipment valve) F5, valve (cryogen Condensate Controlling Equipment valve for health hot water) F6.Burn in the burner solution of 1 li of the heat heating high-temperature generator that produces of combustion gas or fuel oil, make the cryogen in solution absorb heat vaporization out, refrigerant vapour enters the health hot water heat exchanger 15 on high-temperature generator top by refrigerant vapour pipeline 17, because be added with health hot water in the heat-transfer pipe of health hot water heat exchanger 15, so health hot water absorbs the latent heat of refrigerant vapour, be heated, and the refrigerant vapour that has been absorbed latent heat becomes the solidifying water of cryogen and uses cryogen Condensate Controlling Equipment valve F6 and health hot water to get back to high-temperature generator 1 with cryogen condensate line 18 by health hot water.Another part refrigerant vapour that high-temperature generator 1 produces is also by refrigerant vapour pipeline 17, to enter the air-conditioning heating water heat exchanger 16 on high-temperature generator 1 top, because have air-conditioning heating water in the heat-transfer pipe of air-conditioning heating water heat exchanger 16, so air-conditioning heating water absorbs the latent heat of refrigerant vapour, be heated, and the refrigerant vapour that has been absorbed latent heat becomes the solidifying water of cryogen and gets back to 1 li of high-temperature generator by air-conditioning heating water heat exchanger cryogen Condensate Controlling Equipment valve F5 and heating water heat exchanger cryogen condensate line 19.The cryogen solution that high-temperature generator is 1 li does not pass in and out and flows, and is only carrying out the circulation that simple solution is heated, cryogen evaporates, the solidifying water of cryogen is absorbed by solution again.Said process is both to have needed air-conditioning heating winter, needs again the operating mode of health hot water.When spring and autumn only needing health hot water, close air-conditioning heating water heat exchanger cryogen Condensate Controlling Equipment valve F5, obstructed air-conditioning heating water in heat exchanger tube, air-conditioning heating water heat exchanger 16 just can not worked, and unit just can be realized the workload demand that health hot water is provided separately.
When summer, for cold water and warm water are produced operation mode simultaneously, be high-temperature generator dependent operation mode: unit adopts complete machine circulation, Open valve F1, valve F2, valve F3, valve F5, valve F6, burn in the burner solution of 1 li of the heat heating high-temperature generator that produces of combustion gas or fuel oil, make the cryogen in solution absorb heat vaporization out, part refrigerant vapour enters the health hot water heat exchanger 15 on high-temperature generator top by refrigerant vapour pipeline 17, because be added with health hot water in the heat-transfer pipe of health hot water heat exchanger 15, so absorbing the latent heat of refrigerant vapour, health hot water is heated, and the refrigerant vapour that has been absorbed latent heat becomes the solidifying water of cryogen and uses cryogen Condensate Controlling Equipment valve F6 and health hot water to get back to high-temperature generator with cryogen condensate line 18 by health hot water.Another part refrigerant vapour of 1 li of generation of high-temperature generator passes into by valve F3 in the heat-transfer pipe of cryogenerator 8, and the weak solution of 8 li of cryogenerators of heating makes it to thicken, and refrigerant vapour self becomes cryogen condensed water and passes into condenser 9.Cryogenerator 8 produces a part of refrigerant vapour simultaneously, this part refrigerant vapour becomes cryogen condensed water after entering the water condensation that is cooled in condenser 9, the cryogen condensed water that condenser is 9 li leads to evaporimeter 7 through expenditure and pressure device, in 7 li, evaporimeter, by cryogenic fluid pump 14, suppressed spray, cryogen condensed water sprays on the heat-transfer pipe of evaporimeter 7 and evaporates, the heat of the cold water in heat-transfer pipe is drawn in evaporation, so just can produce out cold water from evaporimeter 7.The concentrated solution from high-temperature generator 1 and cryogenerator 8 that the refrigerant vapour of 7 li of generations of evaporimeter is absorbed 6 li of devices absorbs, and therefore concentrated solution becomes weak solution.Weak solution is transferred out by solution pump 10, wherein a part is sent to the interior heating of cryogenerator 8 through low temperature heat exchanger 11, another part is sent to the interior heating of high-temperature generator 1 after low temperature heat exchanger 11 and high-temperature heat exchanger 12, starts next round circulation.
When kind of refrigeration cycle is produced cold water, because the solidifying water of the cryogen in health hot water heat exchanger is still got back to high-temperature generator 1, do not participate in kind of refrigeration cycle, so refrigerating efficiency is lower.
Generally, client is throughout the year requirement throughout the year to the demand of health hot water, and the demand in corresponding summer and winter is distinguished in air conditioner refrigerating and heating.For traditional lithium bromide absorption cooling and warming water machine, its idle call cold water and heating water are all made from evaporimeter.But for this, both needed for air conditioner cold-warm, need again to produce health hot water unit, within the cycle of operation of 1 year, its switch valve need to carry out four times and switch, as shown in the table:
Figure BDA00003548775600021
This not only makes the seal of valve can be subject to too much wearing and tearing, increases Leakage probability, and has increased operation easier.
Summer, unit was when high-temperature generator dependent operation mode, complete machine normal circulation, the first liquid level checking device 2 of high-temperature generator and the 3rd liquid level checking device 4 are contained in high-temperature generator taphole case, and the second liquid level checking device 3 is contained in the loculus of high-temperature generator.While the high liquid level of cryogen solution being detected, the first liquid level checking device 2 actions, the frequency of control solution pump 10 and solution spraying pump 13, balance liquid level.While the low liquid level of cryogen solution being detected, the 3rd liquid level checking device 4 actions, the frequency of control solution pump 10 and solution spraying pump 13, balance liquid level.While the middle liquid level of cryogen solution being detected, solution level is lower than the heat-transfer pipe height of generator, and heat-transfer pipe exists the danger of dry combustion method, and the second liquid level checking device 3 actions, control compressor emergency shutdown, and unit is carried out to safeguard protection.When high-temperature generator 1 independent operation pattern, solution pump, the solution spraying pump of unit are not worked, and the valve Close All on solution turnover pipeline, the solution in high-temperature generator does not circulate, so the action of the first liquid level checking device 2, the 3rd liquid level checking device 4 loses meaning.For high-temperature generator top, set up the occasion of a plurality of heat exchangers, if each heat exchanger is when utmost point lower part load operation, heat exchanger inner accumulated the solidifying water of a large amount of cryogen, the solidifying water of cryogen is condensed and is formed by refrigerant vapour heat release, refrigerant vapour is heated vaporization out by solution in high-temperature generator, in heat exchanger, solidifying water liquid level is higher, and in high-temperature generator, liquid level is lower.When high-temperature generator liquid level is during lower than certain height, the risk of heat-transfer pipe in high-temperature generator in dry combustion method, can make the violent modification of heat-transfer pipe cause barrel distortion to be torn, further cause unit vacuum destroyed, cisco unity malfunction, even air also may enter the corrosion and damage that unit causes complete machine.For fear of this risk, the second liquid level checking device 3 can make compressor emergency shutdown.During load frequent variations, unit will frequent shutdown.In addition, people is fluid infusion, need to open solution inlet port transfer valve F1, because solution inlet port transfer valve F1 is manually-operated gate.Frequent operation is also disadvantageous.
As shown in Figure 2, another kind of similar existing lithium bromide absorption cooling and warming water machine group does not arrange valve F1, valve F2, the switch valves such as valve F3, health hot water is connected the heat-transfer pipe of cryogenerator 8 with the solidifying water loop 19 of cryogen condensate line 18 and heating water heat exchanger cryogen, unit is throughout the year in complete machine operation cycle, refrigerant vapour in health hot water heat exchanger and heating water heat exchanger is got back in kind of refrigeration cycle after forming the solidifying water of cryogen, although efficiency during refrigeration is not low, but owing to cannot forming high-temperature generator independent operation pattern, cause low temperature cylindrical shell in whole kind of refrigeration cycle, the running gear solution pump 10 of unit, wearing and tearing and the consumption of cryogenic fluid pump 4 grades, unit service life of a machine is shortened, maintenance cost is high.
Utility model content
The purpose of this utility model is to provide a kind of novel cold warm water machine that health hot water is provided, and solves the lower technical problem of existing cold warm water machine group refrigerating efficiency, and solves the technical problem that maintenance cost is high, maintenance process is complicated.
The novel cold warm water machine that health hot water is provided of the present utility model, by lithium bromide absorption-type machine unit, formed, comprising high-temperature generator and the health hot water that is connected health hot water heat exchanger cryogen condensate line, health hot water is with being provided with cryogen Condensate Controlling Equipment valve for health hot water on cryogen condensate line, also comprise cryogenerator, solution pump and absorber, wherein: at described health hot water, with the health hot water between cryogen Condensate Controlling Equipment valve and hot high-temperature generator, use on cryogen condensate line, the first transfer valve is set, at health hot water, with the health hot water between cryogen Condensate Controlling Equipment valve and the first transfer valve, use on cryogen condensate line, the cryogen condensate line being connected with the solidifying water out pipeline of cryogen of cryogenerator is set, the second transfer valve is set on cryogen condensate line.
In the output pipe of described solution pump and high-temperature generator, between loculus, a solution replenishing line is set, and fluid supplement solenoid valve valve is set on solution replenishing line, in the weak solution chamber of absorber and high-temperature generator, between loculus, an overflow passage is set, and overflow magnetic valve is set on overflow passage.
The position that described solution replenishing line and described loculus connect is positioned at the side wall upper part of loculus, and the position that described overflow passage and described loculus connect is positioned at the lower sidewall of loculus.
The novel cold warm water machine that health hot water is provided of the present utility model, the solution that makes to freeze can fully enter refrigerating circuit and participate in cold water preparation, guaranteeing under the prerequisite of refrigerating efficiency, by changing the solidifying water connecting line of cryogen of high-temperature generator and cryogenerator, realize the multiple operation mode of efficiently preparing cold water and warm water, changed the heating loop of common cold warm water machine.Heating water is also made by heat exchanger from high-temperature generator top, and also can only carry out the independent operation of high-temperature generator winter.By redesign, realize the solidifying water of heat exchanger and be back to respectively diverse location, optimized the solidifying water echo plex mode of cryogen, improved refrigerating efficiency, saved the expense of operation.
Meanwhile, also make the pattern switching times of unit in 1 year can reduce to twice, as shown in the table:
Figure BDA00003548775600041
On solution inlet port pipeline, export pipeline and the refrigerant vapour export pipeline of high-temperature generator, be provided for respectively the switch valve opening and closing.Late summer, Field Force only need close switch valve, can realize the switching of high-temperature generator independent operation pattern and dependent operation mode, realizes the demand that spring, autumn only need health hot water, and the demand of winter air-conditioning heating and health hot water.While having arrived early summer, above-mentioned valve open can carry out the normal kind of refrigeration cycle of complete machine.So just can improve above-mentioned rough sledding, and heating efficiency is not only unaffected, also can reduces the solution pump operation time of unit, the corrosion of low temperature side cylindrical shell, improve the service life of complete machine.
The utility model has also been equipped with liquid level protection system on high-temperature generator.Disorderly closedown each time all needs to judge reason, solves fault and recovery operation etc., so frequent shutdown has just greatly increased operating personnel and attendant's workload, and unit also exists certain risk.During high-temperature generator individual operation pattern, although solution does not circulate, liquid level is also uprising step-down gradually, and the liquid level checking device of taphole case still can carry out the detection of liquid level.The utility model utilizes original liquid level checking device 2 to carry out liquid level judgement, and increase solution replenishing line T1 and overflow passage T2, avoid the not enough or too much risk of solution while loading frequent variations under this kind of pattern, make the intelligent safe handling of unit, can not only reduce operating personnel's workload like this, and save equipment manufacturer's service human resources.
Below in conjunction with accompanying drawing, embodiment of the present utility model is described further.
Accompanying drawing explanation
Fig. 1 is a kind of structural representation of lithium bromide absorption-type machine unit in prior art;
Fig. 2 is the another kind of structural representation of lithium bromide absorption-type machine unit in prior art;
Fig. 3 can provide the structural representation of the novel cold warm water machine of health hot water for the utility model.
The specific embodiment
As shown in Figure 3, in the present embodiment, on the unit basis shown in Fig. 1, at health hot water, use on cryogen condensate line 18, the first transfer valve F7 is set between health hot water is with cryogen Condensate Controlling Equipment valve F6 and hot high-temperature generator 1, at health hot water, with the health hot water between cryogen Condensate Controlling Equipment valve F6 and the first transfer valve F7, use on cryogen condensate line 18, the cryogen condensate line 20 being connected with the solidifying water out pipeline of cryogen of cryogenerator 8 is set, the second transfer valve F8 is set on cryogen condensate line 20.
In summer, need to freeze and add health hot water, high-temperature generator is when dependent operation mode: unit adopts complete machine circulation, first Open valve F1, valve F2, valve F3, valve F6, valve F8, valve-off F5, valve F7.Burn in the burner solution of 1 li of the heat heating high-temperature generator that produces of combustion gas or fuel oil, make the cryogen in solution absorb heat vaporization out, part refrigerant vapour enters the health hot water heat exchanger 15 on high-temperature generator 1 top by refrigerant vapour pipeline 17, because be added with health hot water in the heat-transfer pipe of health hot water heat exchanger 15, so absorbing the latent heat of refrigerant vapour, health hot water is heated, and the refrigerant vapour that has been absorbed latent heat becomes the cryogen condensate line 20 that the solidifying water of cryogen uses Condensate Controlling Equipment valve F6 and health hot water to use by health hot water, be connected with the solidifying water out pipeline of cryogen of cryogenerator 8, the solidifying water of this part cryogen enters kind of refrigeration cycle, improved the efficiency of refrigeration.Another part refrigerant vapour of 1 li of generation of high-temperature generator passes in the heat-transfer pipe of cryogenerator 8, and the weak solution of 8 li of cryogenerators of heating makes it to thicken, and refrigerant vapour self becomes condensed water and sanitary hot water-setting water and converges and pass into condenser 9.Cryogenerator 8 produces a part of refrigerant vapour simultaneously, this part refrigerant vapour becomes cryogen condensed water after entering the water condensation that is cooled in condenser, the cryogen condensed water that condenser is 9 li leads to evaporimeter 7 through expenditure and pressure device, in 7 li, evaporimeter, by cryogenic fluid pump 14, suppressed spray, condensed water sprays on the heat-transfer pipe of evaporimeter 7 and evaporates, the heat of the cold water in heat-transfer pipe is drawn in evaporation, so just can produce out cold water from evaporimeter 7.The concentrated solution from high-temperature generator 1 and cryogenerator 8 that the refrigerant vapour of 7 li of generations of evaporimeter is absorbed 6 li of devices absorbs, and therefore concentrated solution becomes weak solution.Weak solution is transferred out by solution pump 10, wherein a part is sent to the interior heating of cryogenerator 8 through cryogenic fluid heat exchanger 11, another part is sent to the interior heating of high-temperature generator 1 after low temperature heat exchanger 11 and high-temperature heat exchanger 12, starts next round circulation.
When health hot water load variations, can use cryogen Condensate Controlling Equipment valve F6 to control the flow of solidifying water by health hot water, to load larger, valve opening is larger, and the solution level that health hot water heat exchanger is 15 li is lower.Otherwise, to load less, valve opening is less, and the solution level that health hot water heat exchanger is 15 li is higher.Unit is energy-conservation in order to realize in addition, solution pump 10 and solution spraying pump 13 adopt VFC balance liquid level according to liquid level, liquid level is by the liquid level checking device 2 and 4 in high-temperature generator 1 concentrated solution EXPORT CARTON, and the liquid level checking device 3 in the interior loculus of high-temperature generator 1 judges.While high liquid level being detected, the first liquid level checking device 2 actions, the frequency of control solution pump and solution spraying pump.While low liquid level being detected, the 3rd liquid level detection device 4 actions, the frequency of control solution pump and solution spraying pump.While middle liquid level being detected, cryogen solution level is lower than the heat-transfer pipe height of 1 li of high-temperature generator, and heat-transfer pipe exists the danger of dry combustion method, and the second liquid level checking device 3 actions, control compressor emergency shutdown, and unit is carried out to safeguard protection.By VFC, liquid level can be controlled in normal range (NR) always, and unit just can not frequent shutdown so.
Fluctuation for accurate balance high-temperature generator 1 interior liquid level, overcome potential risk and operation maintenance cost that level fluctuation brings, between the output pipe of solution pump 10 and the side wall upper part of high-temperature generator 1 interior loculus, a solution replenishing line T1 is set, and fluid supplement solenoid valve valve F4 is set on solution replenishing line T1, between the weak solution chamber of absorber 6 and the lower sidewall of high-temperature generator 1 interior loculus, an overflow passage T2 is set, and overflow magnetic valve F9 is set on overflow passage T2.
Winter and running in spring in the fall,, when high-temperature generator independent operation pattern: unit only needs high-temperature generator independent operation can meet client's workload demand, first valve-off F1, valve F2, valve F3, valve F8, open valve F5, valve F6, valve F7.The solution level that guarantees 1 li of high-temperature generator is original state, burn in the burner solution of 1 li of the heat heating high-temperature generator that produces of combustion gas or fuel oil, make the cryogen in solution absorb heat vaporization out, part refrigerant vapour enters the health hot water heat exchanger 15 on high-temperature generator top by refrigerant vapour pipeline 17, because be added with health hot water in the heat-transfer pipe of health hot water heat exchanger 15, so absorbing the latent heat of refrigerant vapour, health hot water is heated, and the refrigerant vapour that has been absorbed latent heat becomes the solidifying water of cryogen and uses Condensate Controlling Equipment valve F6 and health hot water to get back to high-temperature generator 1 with condensate line 18 by health hot water.Another part refrigerant vapour that high-temperature generator 1 produces is also by refrigerant vapour pipeline 17, to enter the air-conditioning heating water heat exchanger 16 on high-temperature generator 1 top, because be added with air-conditioning heating water in the heat-transfer pipe of air-conditioning heating water heat exchanger 16, so air-conditioning heating water absorbs the latent heat of refrigerant vapour, be heated, and the refrigerant vapour that has been absorbed latent heat becomes the solidifying water of cryogen and gets back to 1 li of high-temperature generator by air-conditioning heating water heat exchanger Condensate Controlling Equipment valve F5 and the solidifying water loop 19 of heating water heat exchanger.The solution that high-temperature generator is 1 li does not pass in and out and flows, and is only carrying out the circulation that simple solution is heated, cryogen evaporates, the solidifying water of cryogen is absorbed by solution again.Said process is both to have needed air-conditioning heating winter, needs again the operating mode of health hot water.When spring and autumn only needing health hot water, close air-conditioning heating water heat exchanger Condensate Controlling Equipment valve F5, obstructed air-conditioning heating water in heat exchanger tube, air-conditioning heating water heat exchanger 16 just can not worked, and unit just can be realized the workload demand that health hot water is provided separately.
When air-conditioning heating water or health hot water load changes, the flow that can utilize the Condensate Controlling Equipment valve of corresponding heat exchanger to control solidifying water carries out Load Regulation, load larger, and valve opening is just larger, and the solution level in heat exchanger is lower.Otherwise, to load less, valve opening is less, and the solution level in heat exchanger is higher.But when each heat exchanger moves during at utmost point underload, in heat exchanger, will gather the solidifying water of a large amount of cryogens, the solidifying water of cryogen is to be condensed and generated by the refrigerant vapour heat release of high-temperature generator 1, and in heat exchanger, solidifying water liquid level is higher, and the interior liquid level of high-temperature generator 1 is just lower.When liquid level is too low, just likely there is the phenomenon of dry combustion method, affect the stable operation of unit.The utility model has been equipped with the generation that solution replenishing line T1 prevents dry combustion method phenomenon.When the liquid level of high-temperature generator 1 is during lower than the second liquid level checking device 3 detection position, unit gathers after this signal, will send instruction and start solution pump 10, and open fluid supplement solenoid valve F4, so solution will enter into high-temperature generator 1 through solution replenishing line T1, has just prevented the generation of dry combustion method phenomenon.Otherwise when each heat exchanger is when higher load is moved, in heat exchanger, solidifying water returns to rapidly high-temperature generator, causes high-temperature generator liquid level too high, unfavorable to the normal operation of unit.The utility model has been equipped with the overflow passage T2 of high liquid level, when liquid level is higher than the position of overflow passage in high-temperature generator, opens overflow valve F9, and solution just flows out high-temperature generator through overflow pipe T2.Liquid level protection system just can be avoided while loading frequent variations under this kind of pattern the not enough or too much risk of solution like this, guarantees the intelligent safe operation of unit, reduces Field Force's workload.
Above-described embodiment is described preferred embodiment of the present utility model; not scope of the present utility model is limited; do not departing under the prerequisite of the utility model design spirit; various distortion and improvement that those of ordinary skills make the technical solution of the utility model, all should fall in the definite protection domain of the utility model claims.

Claims (3)

1. the novel cold warm water machine that health hot water can be provided, by lithium bromide absorption-type machine unit, formed, comprising high-temperature generator (1) and the cryogen condensate line (18) for health hot water that is connected health hot water heat exchanger, on cryogen condensate line for health hot water (18), be provided with cryogen Condensate Controlling Equipment valve (F6) for health hot water, also comprise cryogenerator (8), solution pump (10) and absorber (6), it is characterized in that: at described health hot water, with the health hot water between cryogen Condensate Controlling Equipment valve (F6) and hot high-temperature generator (1), use on cryogen condensate line (18), the first transfer valve (F7) is set, at health hot water, with the health hot water between cryogen Condensate Controlling Equipment valve (F6) and the first transfer valve (F7), use on cryogen condensate line (18), the cryogen condensate line (20) being connected with the solidifying water out pipeline of cryogen of cryogenerator (8) is set, the second transfer valve (F8) is set on cryogen condensate line (20).
2. the novel cold warm water machine that health hot water is provided according to claim 1, it is characterized in that: in the output pipe of described solution pump (10) and high-temperature generator (1), between loculus, a solution replenishing line (T1) is set, and fluid supplement solenoid valve valve (F4) is set on solution replenishing line (T1), in the weak solution chamber of absorber (6) and high-temperature generator (1), between loculus, an overflow passage (T2) is set, and on overflow passage (T2), overflow magnetic valve (F9) is set.
3. the novel cold warm water machine that health hot water is provided according to claim 2, it is characterized in that: the position that described solution replenishing line (T1) and described loculus connect is positioned at the side wall upper part of loculus, the position that described overflow passage (T2) and described loculus connect is positioned at the lower sidewall of loculus.
CN201320438762.0U 2013-07-22 2013-07-22 Cold and warm water machine capable of providing sanitary hot water Expired - Lifetime CN203464539U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320438762.0U CN203464539U (en) 2013-07-22 2013-07-22 Cold and warm water machine capable of providing sanitary hot water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320438762.0U CN203464539U (en) 2013-07-22 2013-07-22 Cold and warm water machine capable of providing sanitary hot water

Publications (1)

Publication Number Publication Date
CN203464539U true CN203464539U (en) 2014-03-05

Family

ID=50176901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320438762.0U Expired - Lifetime CN203464539U (en) 2013-07-22 2013-07-22 Cold and warm water machine capable of providing sanitary hot water

Country Status (1)

Country Link
CN (1) CN203464539U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106225299A (en) * 2016-09-13 2016-12-14 远大空调有限公司 A kind of absorption cooling and warming water machine group crystallization-preventive processing means and method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106225299A (en) * 2016-09-13 2016-12-14 远大空调有限公司 A kind of absorption cooling and warming water machine group crystallization-preventive processing means and method thereof

Similar Documents

Publication Publication Date Title
CN102997482B (en) Direct-fired lithium bromide absorption cold-hot water unit for recovering flue gas waste heat under heating working condition
CN102155772A (en) Cascaded ice-storage air conditioning system and method utilizing same to supply cold air for air conditioner
CN105423595B (en) A kind of energy-efficient direct-burning type lithium bromide absorption type hot water or cold water unit of heating
CN102628624A (en) Cascade lithium bromide refrigeration and cold storage system
CN102563947B (en) A kind of heat pipe hot pump combination type refrigerating plant
CN2916522Y (en) Low-temperature-water direct-combustion single and double effect lithium bromide absorption cold and warm water machine
CN205316778U (en) Cold storage refrigeration system
CN104454232A (en) Fuel gas generator set waste heat utilization device
CN203464539U (en) Cold and warm water machine capable of providing sanitary hot water
CN209877408U (en) Energy tower heat pump system with energy storage and solution regeneration functions
CN108131765A (en) A kind of monoblock type list Two-stage Heat Pump System and its control method
CN205332641U (en) Freezer heat recovery is towards white system
CN205227967U (en) Low temperature liquefied gas gasification cold energy recovery unit
CN203940651U (en) Superposition type air-cooled lithium-bromide absorption-type refrigerating machine
CN207881051U (en) A kind of monoblock type list Two-stage Heat Pump System
CN106352586A (en) Double machine head heat source tower heat pump unit
CN2909113Y (en) Low temp water/steam single double efficient lithium bromide absorption refrigeration machine
CN107166476B (en) A kind of heating system of high-pressure water tank combined absorption type heat pump
CN102997496B (en) Direct-fired lithium bromide absorption cold-hot water unit provided with flue gas valves and used for recovering flue gas waste heat
CN205939690U (en) Refrigerating plant heat utilization is to circulation system of water heater
KR101045512B1 (en) Low temperature water two-stage absorbtion typerefrigerator
CN201561565U (en) Air source heat pump water heater with anti-frosting function
CN204612241U (en) Biomass direct-fired cold/hot water machine of lithium bromide group
CN103512271B (en) Direct-fired three-purpose-type lithium bromide absorption-type cold and hot water unit with flue gas heat exchanger
CN203908145U (en) Novel ammonia refrigeration oil collector

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Yongda road 265500 Shandong province Yantai Fushan hi tech Industrial Zone No. 720

Patentee after: Ebara (Chinese) Co. Ltd and cooling system

Address before: Yongda road 265500 Shandong province Yantai Fushan hi tech Industrial Zone No. 720

Patentee before: Renyuan Air Conditioner Equipment Co., Ltd., Yantai City

CP01 Change in the name or title of a patent holder