CN203452263U - Novel steel beam clamp - Google Patents
Novel steel beam clamp Download PDFInfo
- Publication number
- CN203452263U CN203452263U CN201320511329.5U CN201320511329U CN203452263U CN 203452263 U CN203452263 U CN 203452263U CN 201320511329 U CN201320511329 U CN 201320511329U CN 203452263 U CN203452263 U CN 203452263U
- Authority
- CN
- China
- Prior art keywords
- side arm
- steel beam
- novel steel
- base
- beam clamp
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
The utility model relates to a novel steel beam clamp. The novel steel beam clamp comprises a left side arm, a right side arm and a pedestal, wherein the left side arm and the right side arm are in Z-shaped structures, and baffles are inwards arranged at one ends of the left side arm and the right side arm to form clamping troughs; the pedestal is in a U-shaped structure, and the left side arm and the right side arm are fixedly integrated through a bolt. The novel steel beam clamp has the beneficial effects that a builder does not need to consider the direction of the pipeline and drill holes on site during mounting, is not limited by the descriptions above and is greatly facilitated to operate to rapidly lock the pipeline, so that the construction progress is greatly accelerated, and economic and environment-friendly effects are achieved.
Description
Technical field
The utility model relates to a kind of connector, particularly a kind of girder steel folder.
Background technology
The building of steel beam structure has that speed of application is fast, site assembly efficiency advantages of higher, is therefore no lack of in recent years and has large public building, Standard Factory Room all with the form of steel beam structure, to occur.But in decoration, the function of rear continuation, have some inconvenient factor aspect supporting for the building of steel beam structure, for example, in the time various pipelines will being carried out to unsettled laying, just be difficult to pipeline and girder steel to hole, weld, thereby more increased technical difficulty.Therefore people urgently wish a kind of without by welding or rivet or punching and can realizing connecting firmly mutually with girder steel on girder steel and can guide and support conduit component, by these parts as the transition piece between girder steel and pipeline.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of Novel steel beam folder for above drawback, during installation, do not need to consider pipeline rout, do not need on-the-spot boring, not limited by above description, one man operation rapid locking pipes, greatly facilitates constructor, improved greatly construction speed, and economic environmental protection.
For solving the problems of the technologies described above, the technical solution of the utility model is:
A kind of Novel steel beam folder, comprises left side arm, right arm and base, and wherein, described left and right side arm is " Z " shape structure, and its one end is inwardly provided with a baffle plate, forms draw-in groove; Described base is " U " shape structure, and described left and right side arm is bolted into an integral body with base.
Above-mentioned a kind of Novel steel beam folder, wherein, described base two arms and horizontal direction have an angle, and described angle is 92-95 °.
Above-mentioned a kind of Novel steel beam folder, wherein, is provided with pad between described left and right side arm and the contact position of base, and described pad is sheet rubber.
The beneficial effects of the utility model are:
1. construction party is stuck in the draw-in groove of the left side arm of girder steel folder and right arm the both sides on H shape girder steel base in installation process, after pipeline is positioned on base, finally by bolt, girder steel, side arm and base are fixed into an integral body, easy for installation, safe.
2. base two arms and horizontal direction have one 92-95 ° of angle, and are provided with pad between left and right side arm and the contact position of base, make connection more fastening, have increased buffer capacity, have greatly increased weight bearing power.
Accompanying drawing explanation
Fig. 1 is constitutional diagram of the present utility model
Fig. 2 is front view of the present utility model
The specific embodiment
Below in conjunction with accompanying drawing, the utility model is described further.
As scheme a kind of Novel steel beam folder, and comprising left side arm 1, right arm 2 and base 3, left side arm 1, right arm 2 are fixed on base 3 both sides by securing member, and wherein, left side arm 1 and right arm 2 are " Z " shape structure, and its one end is inwardly provided with an interior flap 4, forms draw-in groove 7; Base 3 is " U " shape structure, there is an angle a medial surface of base and bottom surface, a is 92 °, and described left side arm 1, right arm 2 are consolidated 5 with base 3 by bolt and surely become an integral body, between the contact position of left side arm 1, right arm 2 and base 3, are provided with rubber sheet gasket 6.
Construction party is stuck in the draw-in groove of the left side arm of girder steel folder and right arm the both sides on H shape girder steel 6 bases in installation process, after pipeline is positioned on base, finally by bolt, girder steel, side arm and base are fixed into an integral body, easy for installation, safe.Base two arms and horizontal direction have one 92-95 ° of angle, and are provided with pad between left and right side arm and the contact position of base, make connection more fastening, have increased buffer capacity, have greatly increased weight bearing power.
Claims (4)
1. a Novel steel beam folder, comprises left side arm, right arm and base, it is characterized by, and described left and right side arm is " Z " shape structure, and its one end is inwardly provided with an interior flap, forms draw-in groove; Described base is " U " shape structure, described left and right side arm be bolted on described base both sides.
2. a kind of Novel steel beam folder as claimed in claim 1, is characterized by, and between the medial surface of described base and the bottom surface of described base, shape has angle, and described angle is 92-95 °.
3. a kind of Novel steel beam folder as claimed in claim 1, is characterized by, and between described left and right side arm and the contact position of base, is respectively equipped with pad.
4. a kind of Novel steel beam folder as claimed in claim 3, is characterized by, and described pad is sheet rubber.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320511329.5U CN203452263U (en) | 2013-08-21 | 2013-08-21 | Novel steel beam clamp |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320511329.5U CN203452263U (en) | 2013-08-21 | 2013-08-21 | Novel steel beam clamp |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203452263U true CN203452263U (en) | 2014-02-26 |
Family
ID=50132150
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320511329.5U Expired - Fee Related CN203452263U (en) | 2013-08-21 | 2013-08-21 | Novel steel beam clamp |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203452263U (en) |
-
2013
- 2013-08-21 CN CN201320511329.5U patent/CN203452263U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102953473A (en) | Unit curtain wall connector | |
CN106224655A (en) | Two-tube pipe clamp | |
CN201738456U (en) | L-shaped connecting joint of steel I-beam | |
CN203452263U (en) | Novel steel beam clamp | |
CN204993195U (en) | Device for connecting installation photovoltaic support on various steel tile roof | |
CN205688782U (en) | A kind of corner steel girder erection structure of boat scaffold | |
CN204876212U (en) | Three -dimensional adjustable curtain fossil fragments support connected system | |
CN204983169U (en) | Connected node of primary and secondary roof beam | |
CN201882737U (en) | Elevator guide rail bracket | |
CN201817919U (en) | Connecting part for steel structure beam hanger | |
CN203453624U (en) | Pipeline-fixing member | |
CN204211397U (en) | Assembly type standard knot | |
CN203008479U (en) | Temporary standing platform for iron tower assembly | |
CN207173303U (en) | Sliding support meanss for the mechanical swing arm of engineering truck | |
CN205206305U (en) | Table formwork | |
CN206263037U (en) | A kind of semi-automatic pipe bending equipment | |
CN204590617U (en) | The universal connection boots of large form support system | |
CN203742156U (en) | Beret frame lower chord downward-hanging joist steel hoop type device | |
CN203514523U (en) | Floor slab combined mounting seat | |
CN202729660U (en) | Support strengthening device for tower crane attached frame | |
CN203560588U (en) | Movable type steel beam clamp | |
CN201479051U (en) | Connecting structure of solar photovoltaic battery assembly | |
CN202266011U (en) | Shear wall support | |
CN203667813U (en) | Bailey frame bottom chord downwards-hanging I-steel pin-type clamp | |
CN203022332U (en) | Connecting member between scaffold for construction and wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140226 Termination date: 20180821 |