CN203446330U - Ecological sheep house applied to mountainous slope land - Google Patents
Ecological sheep house applied to mountainous slope land Download PDFInfo
- Publication number
- CN203446330U CN203446330U CN201320482272.0U CN201320482272U CN203446330U CN 203446330 U CN203446330 U CN 203446330U CN 201320482272 U CN201320482272 U CN 201320482272U CN 203446330 U CN203446330 U CN 203446330U
- Authority
- CN
- China
- Prior art keywords
- sheep
- mountain area
- ecological
- applicable
- sloping field
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Housing For Livestock And Birds (AREA)
Abstract
The utility model relates to an ecological sheep house applied to mountainous slope land. The ecological sheep house comprises an aisle, wherein the aisle is formed by leveling the position at any height of the mountainous slope land along the isoheight, stilted building type sheep house bodies are established on the aisle and a slope below the side of the aisle, each stilted building type sheep house body is composed of an upper breeding layer and a lower empty space, a sheep bed formed by laying dung leaking floors is arranged in the middle of the stilted building type sheep house body, the sheep bed and the aisle are located in the same horizontal plane, a cement inclined face is poured on the slope below the sheep bed, and a dung collecting trough is formed in the lower end of the cement inclined face. The ecological sheep house applied to mountainous slope land overcomes the shortcomings that an existing mountainous sheep house is simple and crude in structure and has a single function, not only can achieve the aims of using local materials, reducing destroy of the ecological environment and fast constructing the sheep house body, but also can enable sheep to be fast separated from dung and urine, is a clean, dry and comfortable living breeding house for the sheep, improves the survival rate of lambs, accelerates growing speed of the lambs, and improves economic efficiency of farmers.
Description
Technical field
The utility model relates to a kind of sheep hurdle, and particularly a kind of ecological sheep hurdle that is applicable to Sloping field in mountain area use, belongs to livestock breeding cultural technique field.
Background technology
Along with improving constantly of people's living standard, the mutton of green, environmental protection, low fat high protein extremely people is liked, thereby drives the fast development of sheep raising industry.Development of Mutton Sheep breeding scale, sheep hurdle is important facility.At present, the sheep hurdle of flat area all compares standard, and the sheep hurdle in mountain area is limit by condition to utilize that ground is flat supports or by idle building transformation, most lighting and ventilations are poor more, and some sheep hurdles, due to insufficient height, cause summer sultry, air dirt; Winter is sombrely moist, and moisture is overweight.Flat the supporting in some sheep hurdle employings ground causes excrement dirt to flow over, cause flock of sheep disease and parasitosis to take place frequently, and lamb survival rate is low and be difficult to timely thoroughly cleaning ight soil, causes and gives up interior stuffy, high humidity, and the sound development of sheep is constituted a threat to.
Utility model content
In order to overcome the above-mentioned defect of existing mountain area sheep hurdle, the purpose of this utility model is to provide a kind of ecological sheep hurdle that is applicable to Sloping field in mountain area, this ecology sheep hurdle is rational in infrastructure, multiple functional, can maximally utilise Sloping field in mountain area, reduce mountain area ecological disruption, the sheep hurdle that is built in hillside fields is convenient to flock of sheep and is herded and return and herd, reduce the migration of the long distance of flock of sheep, this ecology sheep hurdle scale is easy to control, changeable, can reduce sheep fecaluria and pollute colony house, reduce goat morbidity risk rate, be particularly suitable for mountain area, hilly country scale Yang Chang use.
In order to solve the problems of the technologies described above, the technical solution of the utility model is: a kind of ecological sheep hurdle that is applicable to Sloping field in mountain area, comprise by the arbitrary height and position of Sloping field in mountain area and along contour, even the passageway forming out, on the slope of described passageway and side below thereof, set up and hang pin Storied Goatfold, the described pin Storied Goatfold that hangs is comprised of the cultivation layer on top and the Stilt layer of bottom, described centre of hanging pin Storied Goatfold is provided with by screen floor for manure and lays the sheep bed forming, described sheep bed and passageway are positioned in same level, on the slope of described sheep bed below, built cement inclined-plane, compare Di one end, described cement inclined-plane is provided with collection dropping pit.
In further technical scheme, described collection dropping pit inclined bottom surface is to one end, and the lower one end of described collection dropping pit is provided with total manure pit.
In further technical scheme, on described collection dropping pit, be provided with cover plate.
In further technical scheme, described collection dropping pit is supporting excrement cleaning device, and described excrement cleaning device comprises winch, steel wire rope and manure scraper plate, and described winch is driven and is positioned at the manure scraper plate that collects dropping pit by steel wire rope.
In further technical scheme, a side in the nearly passageway of described sheep bed mooring is provided with feeding slot.
In further technical scheme, described cement inclined-plane extends to the pillar position of Stilt layer, and described collection dropping pit is close to the pillar position of Stilt layer.
In further technical scheme, the pillar of described Stilt layer is wood or brick post.
In further technical scheme, described in hang pin Storied Goatfold top be provided with herringbone roof, the outside eaves on described herringbone roof stretch out and cover collection dropping pit.
In further technical scheme, described in hang pin Storied Goatfold upper height be 2.5m~2.8m.
In further technical scheme, described screen floor for manure is made by batten or bamboo chip.
Compared with prior art, the utlity model has following beneficial effect: this ecology sheep hurdle has overcome that existing mountain area sheep hurdle structure is simple and crude, the shortcoming of function singleness, both reached and can gather materials on the spot, reduce the object of destroying ecotope fast construction sheep hurdle, can make again sheep separated fast with fecaluria, allow sheep perch at clean sheep bed, avoided flock of sheep for a long time in muddy, the sombre moist sheep hurdle of air, and then the possibility catching; Simultaneously, hanging space under the slatted floor of pin Storied Goatfold can make sheep fecaluria slip into rapidly collection dropping pit through processing, avoid goat Long Term Contact fecaluria to cause the possibility of morbidity, thereby for goat provides the object of clean, dry and comfortable colony house, improve lamb survival rate and accelerate its growth rate, improve raiser's economic benefit.
Below in conjunction with the drawings and specific embodiments, the utility model is described in more detail.
Accompanying drawing explanation
Fig. 1 is that the master of the utility model embodiment looks schematic diagram.
Fig. 2 is that schematic diagram is looked on the right side of the utility model embodiment.
In figure: 1-passageway, 2-hangs pin Storied Goatfold, 3-sheep bed, 4-cement inclined-plane, 5-collection dropping pit, 6-pillar, 7-herringbone roof, the total manure pit of 8-, 9-feeding slot.
Embodiment
As shown in Figure 1 and 2, a kind of ecological sheep hurdle that is applicable to Sloping field in mountain area, comprise and by the arbitrary height and position of Sloping field in mountain area, along contour, evened out the passageway 1 forming, on the slope of described passageway 1 and side below thereof, set up and hang pin Storied Goatfold 2, the described pin Storied Goatfold 2 that hangs is comprised of the cultivation layer on top and the Stilt layer of bottom, described centre of hanging pin Storied Goatfold 2 is provided with by screen floor for manure and lays the sheep bed 3 forming, described sheep bed 3 and passageway 1 are positioned in same level, on the slope of described sheep bed 3 belows, built cement inclined- plane 4, 4 lower one end, described cement inclined-plane are provided with collection dropping pit 5.
In the present embodiment, described upper height of hanging pin Storied Goatfold 2 is 2.5m~2.8m, the described lower cage dead level that hangs pin Storied Goatfold 2 is from hillside fields bottom, to hold up the pillar 6 made by materials such as wood or fragments of brick to support high bed sheep hurdle, and lower height is suited measures to local conditions according to hillside fields.Described top of hanging pin Storied Goatfold 2 is provided with herringbone roof 7, described cement inclined-plane 4 extends to pillar 6 positions of Stilt layer so that sheep fecaluria slips into collection dropping pit 5 smoothly, described collection dropping pit 5 is close to pillar 6 positions of Stilt layer, the outside eaves on described herringbone roof 7 outwards suitably extend to cover collection dropping pit 5, and the inner side eaves on described herringbone roof 7 cover passageway 1.
In the present embodiment, described collection dropping pit 5 inclined bottom surfaces are to one end, the length of described collection dropping pit 5 equals sheep hurdle length, width is 1.0m left and right, the degree of depth deepens gradually so that clear excrement, depth capacity is 1.0m left and right, and the lower one end of described collection dropping pit 5 is provided with total manure pit 8, has improved the efficiency of general collection excrement and clear excrement.On described collection dropping pit 5, can add a cover cover plate (not shown in FIG.), prevent that the insects such as fly from entering, reduce to the virose ammonia of sheep hurdle discharge tool, stop foul smell excessive, allow sheep perch at clean salubrious sheep hurdle, avoided flock of sheep to suck for a long time turbid air, and then the possibility catching.
In the present embodiment, described sheep bed 3 is distributed in the outside of ecological sheep hurdle, and described sheep bed 3 is provided with feeding slot 9 near a side in passageway 1, the convenient foodstuffs such as herbage that add.Described screen floor for manure is made by materials such as the batten of certain specification or bamboo chips, so that sheep fecaluria passes through.When the ight soil of collection in dropping pit 5 gathers when a certain amount of, can utilize artificial or mechanical concentrated the scraping in total manure pit 8 of sheep fecaluria collecting in dropping pit 5, for example adopt the excrement cleaning device (not shown in FIG.) being formed by winch, steel wire rope and manure scraper plate, during work, startup winch connects manure scraper plate by steel wire rope and carry out excrement clearly in collection dropping pit 5, greatly reduces the intensity of hand labor.
The operation principle of the present embodiment is as follows: mountain area is herded the flock of sheep of coming back and entered ecological sheep hurdle by sheep hurdle passageway 1, hang pin Storied Goatfold 2 have a rest on the sheep bed 3 of slatted floor, movable and feed, the slope that the fecaluria of discharging enters below by slatted floor slips into collection dropping pit 5 automatically, wait collecting the interior ight soil of dropping pit 5, gather when a certain amount of, utilizing artificial or mechanical the sheep fecaluria in collection dropping pit 5 to concentrate scrapes in total manure pit 8, carry out heap fermentation or transport organic chemical fertilizer factory to producing fertilizer, reduced the pollution to environment.
The foregoing is only preferred embodiment of the present utility model, all equalizations of doing according to the utility model claim change and modify, and all should belong to covering scope of the present utility model.
Claims (10)
1. an ecological sheep hurdle that is applicable to Sloping field in mountain area, it is characterized in that: comprise by the arbitrary height and position of Sloping field in mountain area and along contour, even the passageway forming out, on the slope of described passageway and side below thereof, set up and hang pin Storied Goatfold, the described pin Storied Goatfold that hangs is comprised of the cultivation layer on top and the Stilt layer of bottom, described centre of hanging pin Storied Goatfold is provided with by screen floor for manure and lays the sheep bed forming, described sheep bed and passageway are positioned in same level, on the slope of described sheep bed below, built cement inclined-plane, compare Di one end, described cement inclined-plane is provided with collection dropping pit.
2. the ecological sheep hurdle that is applicable to Sloping field in mountain area according to claim 1, is characterized in that: described collection dropping pit inclined bottom surface is to one end, and the lower one end of described collection dropping pit is provided with total manure pit.
3. the ecological sheep hurdle that is applicable to Sloping field in mountain area according to claim 1 and 2, is characterized in that: on described collection dropping pit, be provided with cover plate.
4. the ecological sheep hurdle that is applicable to Sloping field in mountain area according to claim 1 and 2, it is characterized in that: described collection dropping pit is supporting excrement cleaning device, described excrement cleaning device comprises winch, steel wire rope and manure scraper plate, and described winch drives the manure scraper plate that is positioned at collection dropping pit by steel wire rope.
5. the ecological sheep hurdle that is applicable to Sloping field in mountain area according to claim 1, is characterized in that: a side in the nearly passageway of described sheep bed mooring is provided with feeding slot.
6. the ecological sheep hurdle that is applicable to Sloping field in mountain area according to claim 1, is characterized in that: described cement inclined-plane extends to the pillar position of Stilt layer, and described collection dropping pit is close to the pillar position of Stilt layer.
7. according to the ecological sheep hurdle that is applicable to Sloping field in mountain area described in claim 1 or 6, it is characterized in that: the pillar of described Stilt layer is wood or brick post.
8. according to the ecological sheep hurdle that is applicable to Sloping field in mountain area described in claim 1 or 6, it is characterized in that: described in hang pin Storied Goatfold top be provided with herringbone roof, the outside eaves on described herringbone roof stretch out and cover collection dropping pit.
9. the ecological sheep hurdle that is applicable to Sloping field in mountain area according to claim 1, is characterized in that: described in hang pin Storied Goatfold upper height be 2.5m~2.8m.
10. the ecological sheep hurdle that is applicable to Sloping field in mountain area according to claim 1, is characterized in that: described screen floor for manure is made by batten or bamboo chip.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320482272.0U CN203446330U (en) | 2013-08-08 | 2013-08-08 | Ecological sheep house applied to mountainous slope land |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320482272.0U CN203446330U (en) | 2013-08-08 | 2013-08-08 | Ecological sheep house applied to mountainous slope land |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203446330U true CN203446330U (en) | 2014-02-26 |
Family
ID=50126248
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320482272.0U Expired - Fee Related CN203446330U (en) | 2013-08-08 | 2013-08-08 | Ecological sheep house applied to mountainous slope land |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203446330U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104488738A (en) * | 2014-12-16 | 2015-04-08 | 牡丹江林海特种山猪养殖有限公司 | Double-layer special wild boar cultivation pigsty |
CN105210885A (en) * | 2015-08-26 | 2016-01-06 | 邓建豪 | Ecological sheep cot |
CN106688897A (en) * | 2017-01-19 | 2017-05-24 | 福建省农业科学院畜牧兽医研究所 | Annular ecological cycle sheep cot system under forest in hilly and mountain area and using method thereof |
CN108496811A (en) * | 2018-04-02 | 2018-09-07 | 魏全 | Drainage |
CN110604064A (en) * | 2019-10-28 | 2019-12-24 | 龙陵县畜牧工作站 | Novel multi-functional building formula sheep hurdle of building according to slope |
CN113142068A (en) * | 2021-02-24 | 2021-07-23 | 城步羴牧牧业有限公司 | Hang foot building sheep hurdle convenient to clear excrement of machinery |
-
2013
- 2013-08-08 CN CN201320482272.0U patent/CN203446330U/en not_active Expired - Fee Related
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104488738A (en) * | 2014-12-16 | 2015-04-08 | 牡丹江林海特种山猪养殖有限公司 | Double-layer special wild boar cultivation pigsty |
CN105210885A (en) * | 2015-08-26 | 2016-01-06 | 邓建豪 | Ecological sheep cot |
CN105210885B (en) * | 2015-08-26 | 2017-09-29 | 邓建豪 | Ecological sheep cot |
CN106688897A (en) * | 2017-01-19 | 2017-05-24 | 福建省农业科学院畜牧兽医研究所 | Annular ecological cycle sheep cot system under forest in hilly and mountain area and using method thereof |
CN108496811A (en) * | 2018-04-02 | 2018-09-07 | 魏全 | Drainage |
CN108496811B (en) * | 2018-04-02 | 2024-05-28 | 魏全 | Sewage draining system |
CN110604064A (en) * | 2019-10-28 | 2019-12-24 | 龙陵县畜牧工作站 | Novel multi-functional building formula sheep hurdle of building according to slope |
CN110604064B (en) * | 2019-10-28 | 2024-05-07 | 龙陵县畜牧工作站 | Novel multifunctional building type sheep pen built according to slopes |
CN113142068A (en) * | 2021-02-24 | 2021-07-23 | 城步羴牧牧业有限公司 | Hang foot building sheep hurdle convenient to clear excrement of machinery |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203446330U (en) | Ecological sheep house applied to mountainous slope land | |
CN203446329U (en) | Sheep cot capable of separating excrement and urine | |
CN205455156U (en) | Ecological cycle walking is raisd livestock or poultry and is raised room | |
CN205922381U (en) | Pig house with automatic clear excrement device | |
CN104285828A (en) | Energy-saving and environment-friendly hog house | |
CN202425443U (en) | Net type duck/goose-culturing fermentation bed | |
CN205093391U (en) | Maggot excrement splitter | |
CN104412939A (en) | Propagation method of fly maggots | |
CN201957554U (en) | Double-row fattening hog house | |
CN102613100A (en) | Integrated double bed for healthy cultivation of mutton sheep and sheep raising method | |
CN202104101U (en) | Growing and fattening pig manure in-situ degradation fermenting bed | |
CN201700231U (en) | Sheep pen for farming | |
CN204362722U (en) | A kind of standardization growing and fattening pig house | |
CN201742798U (en) | Temperature-controlled pigsty fermenting bed | |
CN109479732A (en) | A kind of pig-breeding fecaluria removing technique | |
CN106538403A (en) | A kind of goat three-dimensional culture field | |
CN202588032U (en) | Novel high bed sheep house | |
CN201372584Y (en) | Sheep shed of facility breeding | |
CN202425425U (en) | Multi-storey pigsty with fermenting bed | |
CN105532483A (en) | Goat house | |
CN106538402A (en) | A kind of three-dimensional pig farm | |
CN203152204U (en) | Middle-crack cowshed | |
CN205213704U (en) | Automatic high bed sheep hurdle of clear excrement | |
CN204259585U (en) | A kind of pig house of energy-saving and environmental protecting | |
CN104412940A (en) | Propagation method of fly maggot and propagation device thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140226 Termination date: 20140808 |
|
EXPY | Termination of patent right or utility model |