CN203443580U - 一种用于开挖过程中的隧道收敛监测系统 - Google Patents
一种用于开挖过程中的隧道收敛监测系统 Download PDFInfo
- Publication number
- CN203443580U CN203443580U CN201320547347.9U CN201320547347U CN203443580U CN 203443580 U CN203443580 U CN 203443580U CN 201320547347 U CN201320547347 U CN 201320547347U CN 203443580 U CN203443580 U CN 203443580U
- Authority
- CN
- China
- Prior art keywords
- tunnel
- convergence
- monitoring system
- measuring points
- displacement measuring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320547347.9U CN203443580U (zh) | 2013-09-05 | 2013-09-05 | 一种用于开挖过程中的隧道收敛监测系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320547347.9U CN203443580U (zh) | 2013-09-05 | 2013-09-05 | 一种用于开挖过程中的隧道收敛监测系统 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203443580U true CN203443580U (zh) | 2014-02-19 |
Family
ID=50094619
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320547347.9U Expired - Fee Related CN203443580U (zh) | 2013-09-05 | 2013-09-05 | 一种用于开挖过程中的隧道收敛监测系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203443580U (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108072363A (zh) * | 2017-12-29 | 2018-05-25 | 山东大学 | 一种隧道工程监控量测测点保护装置及安装方法 |
CN109505658A (zh) * | 2018-12-11 | 2019-03-22 | 云南航天工程物探检测股份有限公司 | 基于拱顶下沉和周边收敛的隧道监测预警系统及方法 |
CN110954053A (zh) * | 2019-11-18 | 2020-04-03 | 同济大学 | 隧道模型围岩内部位移监测试验平台 |
CN112902933A (zh) * | 2021-01-21 | 2021-06-04 | 河北建设勘察研究院有限公司 | 一种隧道结构变形监测装置及监测方法 |
-
2013
- 2013-09-05 CN CN201320547347.9U patent/CN203443580U/zh not_active Expired - Fee Related
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108072363A (zh) * | 2017-12-29 | 2018-05-25 | 山东大学 | 一种隧道工程监控量测测点保护装置及安装方法 |
CN108072363B (zh) * | 2017-12-29 | 2024-03-15 | 山东大学 | 一种隧道工程监控量测测点保护装置及安装方法 |
CN109505658A (zh) * | 2018-12-11 | 2019-03-22 | 云南航天工程物探检测股份有限公司 | 基于拱顶下沉和周边收敛的隧道监测预警系统及方法 |
CN109505658B (zh) * | 2018-12-11 | 2020-05-19 | 云南航天工程物探检测股份有限公司 | 基于拱顶下沉和周边收敛的隧道监测预警系统及方法 |
CN110954053A (zh) * | 2019-11-18 | 2020-04-03 | 同济大学 | 隧道模型围岩内部位移监测试验平台 |
CN110954053B (zh) * | 2019-11-18 | 2021-03-30 | 同济大学 | 隧道模型围岩内部位移监测试验平台 |
CN112902933A (zh) * | 2021-01-21 | 2021-06-04 | 河北建设勘察研究院有限公司 | 一种隧道结构变形监测装置及监测方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Arthur et al. | Ground movement model validation at the Heathrow Express trial tunnel | |
CN109839315B (zh) | 双向滑移式物理模型箱及跨断层隧道力学行为测试方法 | |
Kavvadas | Monitoring ground deformation in tunnelling: Current practice in transportation tunnels | |
CN103352455B (zh) | 开挖基坑坑底土体隆起的监测方法 | |
AU2020433233A1 (en) | System and method for monitoring and verifying global failure mode of soil and rock dual-element side slope | |
CN203443579U (zh) | 一种基于单侧壁导坑法的隧道收敛监测系统 | |
CN107893437B (zh) | 基于远程无线传输技术的大型沉井基础施工实时监控系统 | |
CN203443580U (zh) | 一种用于开挖过程中的隧道收敛监测系统 | |
CN111429575B (zh) | 一种三维可视化监测方法、系统、设备和存储介质 | |
CN102409703A (zh) | 一种基坑桩顶水平位移的监测方法及其监测装置 | |
CN210154614U (zh) | 一种基于bim的基坑及其周边地层的沉降监测装置 | |
CN110992197B (zh) | 煤矿巷道不规则收敛变形的预警方法及系统 | |
CN111081110A (zh) | 不同埋深、不同构造应力下跨断层隧巷道的力学行为特征模拟测试装置及测试方法 | |
CN107288115A (zh) | 软弱地层基坑深层水平位移监测方法 | |
CN103981906A (zh) | 预设测点式基坑支护变形测量方法 | |
CN113236260A (zh) | 一种全方位盾构下穿既有地铁车站施工监测方法 | |
CN105525634A (zh) | 抗滑桩桩侧土压力连续监测装置、抗滑桩监测系统与监测方法、抗滑桩施工方法 | |
CN103088843B (zh) | 综合管廊预埋铁件安装施工方法 | |
CN203420265U (zh) | 一种基坑边缘变形的监测系统 | |
CN115637743A (zh) | 一种深大基坑施工智能监测变形的方法 | |
CN105887941A (zh) | 一种桩基础桩长测算方法 | |
CN104533520A (zh) | 一种监控隧道拱顶沉降和周边收敛的方法 | |
CN110984114A (zh) | 一种深基坑全周期动态监测方法 | |
CN114370897B (zh) | 一种暗挖隧道爆破震动监测装置及方法 | |
JP6821379B2 (ja) | 軟弱地盤上における盛土速度の管理方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C56 | Change in the name or address of the patentee |
Owner name: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC Free format text: FORMER NAME: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC |
|
CP01 | Change in the name or title of a patent holder |
Address after: 200436 Shanghai, Zhabei District River Road, No. 272, No. three, layer 278, 10 Patentee after: Shanghai Civil Engineering Co., Ltd. of Crec Patentee after: CRECSHANGHAI CIVIL ENGINEERING GROUP NO.2 ENGINEERING CO., LTD. Address before: 200436 Shanghai, Zhabei District River Road, No. 272, No. three, layer 278, 10 Patentee before: Shanghai Civil Engineering Co., Ltd. of CREC Patentee before: No.2 Engineering Company, Shanghai Civil Engineering Co., Ltd. of CREC |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140219 Termination date: 20160905 |