CN203440807U - Light-weight simple tool for rapid probe resistance of underground hidden facilities - Google Patents
Light-weight simple tool for rapid probe resistance of underground hidden facilities Download PDFInfo
- Publication number
- CN203440807U CN203440807U CN201320569076.7U CN201320569076U CN203440807U CN 203440807 U CN203440807 U CN 203440807U CN 201320569076 U CN201320569076 U CN 201320569076U CN 203440807 U CN203440807 U CN 203440807U
- Authority
- CN
- China
- Prior art keywords
- feeler
- feeler lever
- light
- underground
- simple tool
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320569076.7U CN203440807U (en) | 2013-09-14 | 2013-09-14 | Light-weight simple tool for rapid probe resistance of underground hidden facilities |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320569076.7U CN203440807U (en) | 2013-09-14 | 2013-09-14 | Light-weight simple tool for rapid probe resistance of underground hidden facilities |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203440807U true CN203440807U (en) | 2014-02-19 |
Family
ID=50091872
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320569076.7U Expired - Fee Related CN203440807U (en) | 2013-09-14 | 2013-09-14 | Light-weight simple tool for rapid probe resistance of underground hidden facilities |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203440807U (en) |
-
2013
- 2013-09-14 CN CN201320569076.7U patent/CN203440807U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104181611B (en) | A kind of mine working face roof and floor Mining failure cranny development dynamic monitoring method | |
CN103076119B (en) | Method for measuring floor heave main control stress of laneway | |
CN106950070B (en) | Experimental rig for rectangular top pipe jacking construction Whole Process Simulation | |
CN102995615B (en) | A kind of method of real-time for underground deep layer land movement | |
Sun et al. | Multi-field coupling of water inrush channel formation in a deep mine with a buried fault | |
CN102768369A (en) | Roadway drivage drilling induced polarization advance water probing forecasting method, device and probe | |
CN105334548A (en) | Geological forecasting method for tunnel construction in karst area | |
CN103471647B (en) | A kind of shield tunnel remote automation monitoring method | |
CN106032748B (en) | Hydraulic fracturing crack propagation rule detection method based on drilling Transient Electromagnetic Technique | |
CN109238161A (en) | A kind of observation device and observation method of tunnel surface absolute convergence amount | |
CN105804763B (en) | Across the hole CT boulders detection system of advanced 3 D resistivity and detection method that shield excavation machine is carried | |
CN104035142A (en) | Early warning method for sudden gushing water danger of undersea tunnel | |
CN105652311A (en) | Micro-seismic monitoring method for monitoring water inrush of base plate | |
Liu et al. | A case study of collapses at the Yangshan tunnel of the Coal Transportation Channel from the Western Inner Mongolia to the Central China | |
Meng et al. | In situ investigation and numerical simulation of the failure depth of an inclined coal seam floor: a case study | |
Guo et al. | Distribution of ground stress on Puhe coal mine | |
CN101975065A (en) | Method for measuring mining stress of coal mine tunnel | |
CN214747897U (en) | Building construction monitoring system | |
CN203021982U (en) | Underground deep soil displacement real-time monitor system | |
CN103335169A (en) | Geotechnical engineering investigation method | |
CN104123433B (en) | Method for determining soil deformation caused by high-pressure horizontal rotary jet grouting construction | |
CN104631418A (en) | Method for checking underground pipeline through simple manpower device in urban geology exploration | |
CN203440807U (en) | Light-weight simple tool for rapid probe resistance of underground hidden facilities | |
CN104405376A (en) | Drilling electrical prospecting device and method for overburden water-conducting zone | |
CN103867208A (en) | Method for controlling deformation of ground surface and pipelines in process of tunnel and underground works construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Gu Jinming Inventor after: Li Ping Inventor after: Huang Zhihua Inventor after: Fei Xuejun Inventor after: Ma Ping Inventor after: Zhou Junbao Inventor after: Gao Xing Inventor after: Xu Yuexiang Inventor before: Gu Jinming Inventor before: Li Ping Inventor before: Huang Zhihua Inventor before: Fei Xuejun Inventor before: Ma Jun Inventor before: Zhou Junbao Inventor before: Gao Xing Inventor before: Xu Yuexiang |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: GU JINMING LI PING HUANG ZHIHUA FEI XUEJUN MA JUN ZHOU JUNBAO GAO XING XU YUEXIANG TO: GU JINMING LI PING HUANG ZHIHUA FEI XUEJUN MA PING ZHOU JUNBAO GAO XING XU YUEXIANG |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140219 Termination date: 20140914 |
|
EXPY | Termination of patent right or utility model |