CN203432327U - Aluminum ingot smelting system - Google Patents
Aluminum ingot smelting system Download PDFInfo
- Publication number
- CN203432327U CN203432327U CN201320573704.9U CN201320573704U CN203432327U CN 203432327 U CN203432327 U CN 203432327U CN 201320573704 U CN201320573704 U CN 201320573704U CN 203432327 U CN203432327 U CN 203432327U
- Authority
- CN
- China
- Prior art keywords
- smelting
- furnace
- preheating furnace
- aluminium ingot
- preheating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Furnace Details (AREA)
- Vertical, Hearth, Or Arc Furnaces (AREA)
Abstract
The utility model discloses an aluminum ingot smelting system. The aluminum ingot smelting system comprises a hot gas inlet pipe, smelting furnaces arranged in parallel, and a gas exhausting pipe, wherein smoke outlets of the smelting furnaces are connected with the gas exhausting pipe; a preheating furnace is mounted between the adjacent smelting furnaces; the preheating furnace and the adjacent two smelting furnaces are communicated with a refining furnace through pipelines; and the hot gas inlet pipe is introduced in the smelting furnace near to the preheating furnace from the preheating furnace. The aluminum ingot smelting system uses the heat of the original smelting furnace for supplying heat to the preheating furnace through adding one preheating furnace, so that the aluminum ingot smelting efficiency is improved.
Description
Technical field
The utility model relates to a kind of smelting system, specifically a kind of aluminium ingot smelting system.
Background technology
In aluminium sheet production process, need to melt a large amount of aluminium ingots.In fusing aluminium ingot, need to expend a large amount of resources, to ensure enough temperature, aluminium ingot be melted.In the process of fusing, can produce a large amount of flue gases, and the temperature of each aluminium ingot smelting furnace is very high, melting makes the appearance temperature of smelting furnace also very high for a long time.This part heat is all directly dispersed in air, has wasted this part heat.
Summary of the invention
The technical problems to be solved in the utility model is to provide in a kind of aluminium ingot smelting system, the more aluminium ingot of melting in the situation that of same equal energy source.
In order to solve the problems of the technologies described above, the utility model is taked following technical scheme:
A kind of aluminium ingot smelting system, comprise hot gas inlet pipe, smelting furnace side by side and blast pipe, the exhanst gas outlet of smelting furnace is connected with blast pipe, between described adjacent smelting furnace, is equiped with preheating furnace, and preheating furnace is communicated with refining furnace by pipeline with two adjacent smelting furnaces.
Described hot gas inlet pipe enters in the smelting furnace adjacent with this preheating furnace in preheating furnace.
In described preheating furnace, be equiped with flame gun.
The import department of described preheating furnace is provided with fire door.
The utility model passes through improvements over the prior art, on the basis of original smelting furnace, increase a preheating furnace is set, this preheating furnace is arranged in the middle of two adjacent smelting furnaces, the heat that utilizes smelting furnace to produce provides heat to preheating furnace, thereby the aluminium ingot of throwing in preheating furnace is melted, thereby can melt more aluminium ingot, enhance productivity.
Accompanying drawing explanation
Accompanying drawing 1 is the utility model catenation principle schematic diagram.
The specific embodiment
For the ease of those skilled in the art's understanding, below in conjunction with accompanying drawing, the utility model will be further described.
As shown in Figure 1, the utility model has disclosed a kind of aluminium ingot smelting system, comprise hot gas inlet pipe, smelting furnace side by side 1 and blast pipe, the exhanst gas outlet of smelting furnace 1 is connected with blast pipe, between described adjacent smelting furnace, be equiped with preheating furnace 2, preheating furnace 2 is communicated with refining furnace by pipeline with two adjacent smelting furnaces 1.Hot gas inlet pipe enters in the smelting furnace adjacent with this preheating furnace in preheating furnace, and preheating furnace is communicated with refining furnace 3 by pipeline with two adjacent smelting furnaces.
In addition, in preheating furnace, be equiped with flame gun (not shown), as long as flame gun is arranged in preheating furnace, be normally contained in the bottom of preheating furnace.When aluminium ingot can not melt completely in preheating furnace, can open flame gun, improve the temperature in preheating furnace, thereby aluminium ingot is melted, play an auxiliary effect.Import department at preheating furnace is provided with fire door, opens fire door and be convenient to cleaning in the time of need to clearing up, and prevents again that heat from hurting people during heating.
The utility model increases a preheating furnace on the basis of existing aluminium ingot, and other air inlet pipe are consistent with blast pipe and prior art, and in this not go into detail.
The utility model is increased a preheating furnace is set by increase, this preheating furnace is arranged in the middle of two adjacent smelting furnaces, the heat that utilizes smelting furnace to produce provides heat to preheating furnace, the temperature in preheating furnace is raise, thereby the aluminium ingot of throwing in preheating furnace is played to fusing effect.In addition, when shortage of heat, so that the temperature in preheating furnace is elevated to while melting aluminium ingot, can open flame gun, the temperature in preheating furnace is improved, guarantee to melt completely the aluminium ingot in preheating furnace.Effectively enhance productivity, on the basis of original resource, melt more aluminium ingot.
Claims (4)
1. an aluminium ingot smelting system, comprise hot gas inlet pipe, smelting furnace side by side (1) and blast pipe, the exhanst gas outlet of smelting furnace is connected with blast pipe, it is characterized in that, between described adjacent smelting furnace, be equiped with preheating furnace (2), preheating furnace is communicated with refining furnace (3) by pipeline with two adjacent smelting furnaces.
2. aluminium ingot smelting system according to claim 1, is characterized in that, described hot gas inlet pipe enters in the smelting furnace adjacent with this preheating furnace in preheating furnace.
3. aluminium ingot smelting system according to claim 2, is characterized in that, in described preheating furnace, is equiped with flame gun.
4. aluminium ingot smelting system according to claim 3, is characterized in that, the import department of described preheating furnace is provided with fire door.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320573704.9U CN203432327U (en) | 2013-09-16 | 2013-09-16 | Aluminum ingot smelting system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320573704.9U CN203432327U (en) | 2013-09-16 | 2013-09-16 | Aluminum ingot smelting system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203432327U true CN203432327U (en) | 2014-02-12 |
Family
ID=50061361
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320573704.9U Expired - Fee Related CN203432327U (en) | 2013-09-16 | 2013-09-16 | Aluminum ingot smelting system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203432327U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114279216A (en) * | 2021-12-25 | 2022-04-05 | 浙江强伟五金有限公司 | Aluminum ingot melting furnace for producing curtain rod accessories |
-
2013
- 2013-09-16 CN CN201320573704.9U patent/CN203432327U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114279216A (en) * | 2021-12-25 | 2022-04-05 | 浙江强伟五金有限公司 | Aluminum ingot melting furnace for producing curtain rod accessories |
CN114279216B (en) * | 2021-12-25 | 2024-03-01 | 浙江强伟五金有限公司 | Aluminum ingot melting furnace for producing curtain rod fittings |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202660889U (en) | Liquid deslagging high-temperature oriented silicon steel walking beam type slab heating furnace | |
CN204085215U (en) | A kind of electrical arc furnace flue gas waste heat utilization device | |
CN202182624U (en) | Energy-saving aluminium melting conjuncted furnace | |
CN105423750A (en) | Aluminum melting furnace | |
CN203432327U (en) | Aluminum ingot smelting system | |
CN203454817U (en) | Waste heat recycling mechanism of aluminum melting furnace | |
CN204026998U (en) | A kind of living beings regenerative hot blast stove | |
CN202494347U (en) | Comprehensive energy saving device utilizing surplus heat of tunnel type kiln furnace, | |
CN204648988U (en) | Single excellent heating furnace hot-gas recoverer | |
CN204080013U (en) | A kind of aluminum aging furnace continuously | |
CN205192263U (en) | Smelting furnace waste heat recovery system for aluminum ingot production | |
CN205175101U (en) | Energy -conserving formula melting furnace | |
CN204997066U (en) | Low pressure natural gas zinc powder stove | |
CN202836186U (en) | Energy-saving three-chamber oven battery | |
CN104152637B (en) | A kind of aluminum aging furnace continuously | |
CN205262179U (en) | Aluminum smelting stove | |
CN204063923U (en) | Energy-saving double-layer melting furnace | |
CN201935557U (en) | Regenerative combustion furnace | |
CN204063896U (en) | A kind of isothermal smelting | |
CN203824343U (en) | Pre-heating system for loading and burning porcelain blank | |
CN204438825U (en) | The smoke processing system of top blast stove | |
CN206018641U (en) | CIU is using waste heat boiler to chilling tower heating structure | |
CN202032887U (en) | Energy-saving gravity furnace | |
CN202470745U (en) | Full-coal-gas aluminum alloy melting furnace | |
CN202993815U (en) | Energy-saving automatic voltage control aluminum melting furnace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: 511500 Guangdong city of Qingyuan province high tech Industrial Development Zone, Tai Ji industrial city Patentee after: GUANGDONG HAOMEI ALUMINIUM CO.,LTD. Address before: 511540 Guangdong province Qingyuan Taiji industrial city of Guangdong high tech Zone Haomei aluminium Limited by Share Ltd Patentee before: HAOMEI ALUMINIUM Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140212 Termination date: 20210916 |
|
CF01 | Termination of patent right due to non-payment of annual fee |