CN203432327U - Aluminum ingot smelting system - Google Patents

Aluminum ingot smelting system Download PDF

Info

Publication number
CN203432327U
CN203432327U CN201320573704.9U CN201320573704U CN203432327U CN 203432327 U CN203432327 U CN 203432327U CN 201320573704 U CN201320573704 U CN 201320573704U CN 203432327 U CN203432327 U CN 203432327U
Authority
CN
China
Prior art keywords
smelting
furnace
preheating furnace
aluminium ingot
preheating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320573704.9U
Other languages
Chinese (zh)
Inventor
冷雄水
鄢明军
王天同
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG HAOMEI ALUMINIUM CO Ltd
Original Assignee
GUANGDONG HAOMEI ALUMINUM CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG HAOMEI ALUMINUM CO Ltd filed Critical GUANGDONG HAOMEI ALUMINUM CO Ltd
Priority to CN201320573704.9U priority Critical patent/CN203432327U/en
Application granted granted Critical
Publication of CN203432327U publication Critical patent/CN203432327U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Furnace Details (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

The utility model discloses an aluminum ingot smelting system. The aluminum ingot smelting system comprises a hot gas inlet pipe, smelting furnaces arranged in parallel, and a gas exhausting pipe, wherein smoke outlets of the smelting furnaces are connected with the gas exhausting pipe; a preheating furnace is mounted between the adjacent smelting furnaces; the preheating furnace and the adjacent two smelting furnaces are communicated with a refining furnace through pipelines; and the hot gas inlet pipe is introduced in the smelting furnace near to the preheating furnace from the preheating furnace. The aluminum ingot smelting system uses the heat of the original smelting furnace for supplying heat to the preheating furnace through adding one preheating furnace, so that the aluminum ingot smelting efficiency is improved.

Description

A kind of aluminium ingot smelting system
Technical field
The utility model relates to a kind of smelting system, specifically a kind of aluminium ingot smelting system.
Background technology
In aluminium sheet production process, need to melt a large amount of aluminium ingots.In fusing aluminium ingot, need to expend a large amount of resources, to ensure enough temperature, aluminium ingot be melted.In the process of fusing, can produce a large amount of flue gases, and the temperature of each aluminium ingot smelting furnace is very high, melting makes the appearance temperature of smelting furnace also very high for a long time.This part heat is all directly dispersed in air, has wasted this part heat.
Summary of the invention
The technical problems to be solved in the utility model is to provide in a kind of aluminium ingot smelting system, the more aluminium ingot of melting in the situation that of same equal energy source.
In order to solve the problems of the technologies described above, the utility model is taked following technical scheme:
A kind of aluminium ingot smelting system, comprise hot gas inlet pipe, smelting furnace side by side and blast pipe, the exhanst gas outlet of smelting furnace is connected with blast pipe, between described adjacent smelting furnace, is equiped with preheating furnace, and preheating furnace is communicated with refining furnace by pipeline with two adjacent smelting furnaces.
Described hot gas inlet pipe enters in the smelting furnace adjacent with this preheating furnace in preheating furnace.
In described preheating furnace, be equiped with flame gun.
The import department of described preheating furnace is provided with fire door.
The utility model passes through improvements over the prior art, on the basis of original smelting furnace, increase a preheating furnace is set, this preheating furnace is arranged in the middle of two adjacent smelting furnaces, the heat that utilizes smelting furnace to produce provides heat to preheating furnace, thereby the aluminium ingot of throwing in preheating furnace is melted, thereby can melt more aluminium ingot, enhance productivity.
Accompanying drawing explanation
Accompanying drawing 1 is the utility model catenation principle schematic diagram.
The specific embodiment
For the ease of those skilled in the art's understanding, below in conjunction with accompanying drawing, the utility model will be further described.
As shown in Figure 1, the utility model has disclosed a kind of aluminium ingot smelting system, comprise hot gas inlet pipe, smelting furnace side by side 1 and blast pipe, the exhanst gas outlet of smelting furnace 1 is connected with blast pipe, between described adjacent smelting furnace, be equiped with preheating furnace 2, preheating furnace 2 is communicated with refining furnace by pipeline with two adjacent smelting furnaces 1.Hot gas inlet pipe enters in the smelting furnace adjacent with this preheating furnace in preheating furnace, and preheating furnace is communicated with refining furnace 3 by pipeline with two adjacent smelting furnaces.
In addition, in preheating furnace, be equiped with flame gun (not shown), as long as flame gun is arranged in preheating furnace, be normally contained in the bottom of preheating furnace.When aluminium ingot can not melt completely in preheating furnace, can open flame gun, improve the temperature in preheating furnace, thereby aluminium ingot is melted, play an auxiliary effect.Import department at preheating furnace is provided with fire door, opens fire door and be convenient to cleaning in the time of need to clearing up, and prevents again that heat from hurting people during heating.
The utility model increases a preheating furnace on the basis of existing aluminium ingot, and other air inlet pipe are consistent with blast pipe and prior art, and in this not go into detail.
The utility model is increased a preheating furnace is set by increase, this preheating furnace is arranged in the middle of two adjacent smelting furnaces, the heat that utilizes smelting furnace to produce provides heat to preheating furnace, the temperature in preheating furnace is raise, thereby the aluminium ingot of throwing in preheating furnace is played to fusing effect.In addition, when shortage of heat, so that the temperature in preheating furnace is elevated to while melting aluminium ingot, can open flame gun, the temperature in preheating furnace is improved, guarantee to melt completely the aluminium ingot in preheating furnace.Effectively enhance productivity, on the basis of original resource, melt more aluminium ingot.

Claims (4)

1. an aluminium ingot smelting system, comprise hot gas inlet pipe, smelting furnace side by side (1) and blast pipe, the exhanst gas outlet of smelting furnace is connected with blast pipe, it is characterized in that, between described adjacent smelting furnace, be equiped with preheating furnace (2), preheating furnace is communicated with refining furnace (3) by pipeline with two adjacent smelting furnaces.
2. aluminium ingot smelting system according to claim 1, is characterized in that, described hot gas inlet pipe enters in the smelting furnace adjacent with this preheating furnace in preheating furnace.
3. aluminium ingot smelting system according to claim 2, is characterized in that, in described preheating furnace, is equiped with flame gun.
4. aluminium ingot smelting system according to claim 3, is characterized in that, the import department of described preheating furnace is provided with fire door.
CN201320573704.9U 2013-09-16 2013-09-16 Aluminum ingot smelting system Expired - Fee Related CN203432327U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320573704.9U CN203432327U (en) 2013-09-16 2013-09-16 Aluminum ingot smelting system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320573704.9U CN203432327U (en) 2013-09-16 2013-09-16 Aluminum ingot smelting system

Publications (1)

Publication Number Publication Date
CN203432327U true CN203432327U (en) 2014-02-12

Family

ID=50061361

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320573704.9U Expired - Fee Related CN203432327U (en) 2013-09-16 2013-09-16 Aluminum ingot smelting system

Country Status (1)

Country Link
CN (1) CN203432327U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114279216A (en) * 2021-12-25 2022-04-05 浙江强伟五金有限公司 Aluminum ingot melting furnace for producing curtain rod accessories

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114279216A (en) * 2021-12-25 2022-04-05 浙江强伟五金有限公司 Aluminum ingot melting furnace for producing curtain rod accessories
CN114279216B (en) * 2021-12-25 2024-03-01 浙江强伟五金有限公司 Aluminum ingot melting furnace for producing curtain rod fittings

Similar Documents

Publication Publication Date Title
CN202660889U (en) Liquid deslagging high-temperature oriented silicon steel walking beam type slab heating furnace
CN204085215U (en) A kind of electrical arc furnace flue gas waste heat utilization device
CN202182624U (en) Energy-saving aluminium melting conjuncted furnace
CN105423750A (en) Aluminum melting furnace
CN203432327U (en) Aluminum ingot smelting system
CN203454817U (en) Waste heat recycling mechanism of aluminum melting furnace
CN204026998U (en) A kind of living beings regenerative hot blast stove
CN202494347U (en) Comprehensive energy saving device utilizing surplus heat of tunnel type kiln furnace,
CN204648988U (en) Single excellent heating furnace hot-gas recoverer
CN204080013U (en) A kind of aluminum aging furnace continuously
CN205192263U (en) Smelting furnace waste heat recovery system for aluminum ingot production
CN205175101U (en) Energy -conserving formula melting furnace
CN204997066U (en) Low pressure natural gas zinc powder stove
CN202836186U (en) Energy-saving three-chamber oven battery
CN104152637B (en) A kind of aluminum aging furnace continuously
CN205262179U (en) Aluminum smelting stove
CN204063923U (en) Energy-saving double-layer melting furnace
CN201935557U (en) Regenerative combustion furnace
CN204063896U (en) A kind of isothermal smelting
CN203824343U (en) Pre-heating system for loading and burning porcelain blank
CN204438825U (en) The smoke processing system of top blast stove
CN206018641U (en) CIU is using waste heat boiler to chilling tower heating structure
CN202032887U (en) Energy-saving gravity furnace
CN202470745U (en) Full-coal-gas aluminum alloy melting furnace
CN202993815U (en) Energy-saving automatic voltage control aluminum melting furnace

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 511500 Guangdong city of Qingyuan province high tech Industrial Development Zone, Tai Ji industrial city

Patentee after: GUANGDONG HAOMEI ALUMINIUM CO.,LTD.

Address before: 511540 Guangdong province Qingyuan Taiji industrial city of Guangdong high tech Zone Haomei aluminium Limited by Share Ltd

Patentee before: HAOMEI ALUMINIUM Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140212

Termination date: 20210916

CF01 Termination of patent right due to non-payment of annual fee