CN203421815U - Energy-saving boiler - Google Patents

Energy-saving boiler Download PDF

Info

Publication number
CN203421815U
CN203421815U CN201320361658.6U CN201320361658U CN203421815U CN 203421815 U CN203421815 U CN 203421815U CN 201320361658 U CN201320361658 U CN 201320361658U CN 203421815 U CN203421815 U CN 203421815U
Authority
CN
China
Prior art keywords
heater
boiler
preheater
pipe
chimney
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320361658.6U
Other languages
Chinese (zh)
Inventor
贾宁安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YAN'AN SHENGHUO PETROCHEMICAL JIANAN Co Ltd
Original Assignee
YAN'AN SHENGHUO PETROCHEMICAL JIANAN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YAN'AN SHENGHUO PETROCHEMICAL JIANAN Co Ltd filed Critical YAN'AN SHENGHUO PETROCHEMICAL JIANAN Co Ltd
Priority to CN201320361658.6U priority Critical patent/CN203421815U/en
Application granted granted Critical
Publication of CN203421815U publication Critical patent/CN203421815U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Air Supply (AREA)
  • Solid-Fuel Combustion (AREA)

Abstract

The utility model discloses an energy-saving boiler comprising a boiler body. A water circulating pipeline is arranged in the boiler body, a combustion chamber is arranged below the boiler body, a boiler ash chamber is arranged below the combustion chamber, and one side of the boiler body is provided with a chimney. By means of the arrangement of a plurality of boiler tubes, the stroke of smoke is lengthened, and flue gas heat exchange time is prolonged. Temperature of discharged smoke is lowered by means of a preheater. By means of the arrangement of double fire gate back combustion, heat efficiency and power are increased, the functions of coal conservation and emission reduction are achieved, and the problems that an existing boiler is short in flue gas heat exchange time, low in heat efficiency, high in smoke exhaust temperature and low in power are solved.

Description

A kind of power economized boiler
Technical field
The utility model belongs to atmospheric efficient energy-saving boiler technical field, relates to a kind of power economized boiler.
Background technology
The boiler of existing use, the flue gas heat exchange time is short, the thermal efficiency is low, high fume temperature, power are little.
Utility model content
The purpose of this utility model is to provide a kind of boiler, and to solve, existing boiler smoke heat-exchange time is short, the thermal efficiency is low, the problem of high fume temperature.
The technical scheme that the utility model adopts is, a kind of power economized boiler, comprises body of heater, is provided with water circulating pipe in body of heater, and the below of body of heater is provided with combustion chamber, and below, combustion chamber is provided with ashes chamber, and a side of body of heater is provided with chimney.
Feature of the present utility model is also,
Combustion chamber comprises water jacket grate furnace and the cast iron grate furnace that is successively set on body of heater below.
Chimney is provided with preheater near one end of body of heater, and preheater is provided with emptying tracheae, and the port of export of chimney is provided with flue air regulating board.
The outer wall of body of heater is provided with water-level gauge and thermometer.
Body of heater comprises inner chamber and exocoel, water circulating pipe comprises that several are set in parallel in the boiler tube of inner chamber side by side, the two ends of each boiler tube are all communicated with exocoel, the outer wall of body of heater is provided with outlet pipe and the return pipe being interconnected, preheater is provided with feed pipe, and outlet pipe, return pipe and feed pipe are all communicated with exocoel.
The inner chamber of body of heater is vertically provided with refractory wall, and gap is left on one end of refractory wall and inner chamber top.
The beneficial effects of the utility model are, by several boiler tubes that arrange, increased the backhaul of cigarette, increased the flue gas heat exchange time, by preheater, reduce the temperature of smoke evacuation, by Double fire grate back burning is set, increase the thermal efficiency and power, played the effect of economizing on coal and reducing discharging, solved that existing boiler smoke heat-exchange time is short, the thermal efficiency is low, the problem of high fume temperature.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of power economized boiler of the utility model.
In figure, 1. ashes chamber, 2. cast iron grate furnace, 3. water jacket grate furnace, 4. return pipe, 5. refractory wall, 6. boiler tube, 7. water-level gauge, 8. thermometer, 9. outlet pipe, 10. body of heater, 11. flue air regulating boards, 12. chimneys, 13. feed pipes, 14. emptying tracheaes, 15. preheaters.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is elaborated.
The utility model provides a kind of power economized boiler, and its structure, referring to Fig. 1, comprises body of heater 10, in body of heater 10, is provided with water circulating pipe, and the below of body of heater 10 is provided with combustion chamber, and below, combustion chamber is provided with ashes chamber 1, and a side of body of heater 10 is provided with chimney 12.Wherein, combustion chamber comprises water jacket grate furnace 3 and the cast iron grate furnace 2 that is successively set on body of heater 10 belows; Chimney 12 is provided with preheater 15 near one end of body of heater 10, and preheater 15 is provided with emptying tracheae 14, and the port of export of chimney 12 is provided with flue air regulating board 11; The outer wall of body of heater 10 is provided with water-level gauge 7 and thermometer 8; Body of heater 10 comprises inner chamber and exocoel, described water circulating pipe comprises several boiler tubes that is set in parallel in side by side inner chamber 6, the two ends of each boiler tube 6 are all communicated with exocoel, the outer wall of body of heater 10 is provided with outlet pipe 9 and the return pipe 4 being interconnected, described preheater 15 is provided with feed pipe 13, and described outlet pipe 9, return pipe 4 and feed pipe 13 are all communicated with exocoel; The inner chamber of body of heater 10 is vertically provided with refractory wall 5, and gap is left on one end of refractory wall 5 and inner chamber top.
Point stokehold, water jacket grate furnace 3 and cast iron grate furnace 2 are paved with to timber, light and coal, open flue air regulating board 11 and be adjusted to correct position, self-priming normal combustion, in combustion process, the water jacket grate furnace 3 on upper strata falls down and does not fire the timber that clean broken coal is lighted lower floor's cast iron grate furnace 2, and lower floor takes fire, and forms two-layer burning, then the fuel continuation that water jacket grate furnace 3 is fallen down on upper strata is in 2 afterburnts of lower floor's cast iron grate furnace, and ash content falls into ashes chamber 1.
Cooling water is entered from feed pipe 13, then enter several boiler tubes 6 by the inner chamber of body of heater 10, then export from outlet pipe 9 by boiler tube 6, then by return pipe 4, be back to the inner chamber of body of heater 10, complete water cycle process.
The outer wall of body of heater is provided with water-level gauge 7 and thermometer 8, can the temperature of Real-Time Monitoring boiler and the state of recirculated water.
The setting of refractory wall 5, makes body of heater 10 inner chambers form the path of a U-shaped, and the cigarette that combustion chamber produces rises to the top of body of heater 10 from a side of refractory wall 5, move to again the exit of chimney 12, increased the backhaul of cigarette, the preheater that simultaneously chimney 12 places arrange, can reduce the temperature of smoke evacuation.
By several boiler tubes 6 that arrange, increased the backhaul of cigarette, increased the flue gas heat exchange time, by preheater 15 is set, reduced the temperature of smoke evacuation, by Double fire grate back burning is set, increase the thermal efficiency and power, played the effect of economizing on coal and reducing discharging, solved that existing boiler smoke heat-exchange time is short, the thermal efficiency is low, the problem of high fume temperature.

Claims (6)

1. a power economized boiler, is characterized in that, comprises body of heater (10), and body of heater is provided with water circulating pipe in (10), and the below of body of heater (10) is provided with combustion chamber, and below, combustion chamber is provided with ashes chamber (1), and a side of body of heater (10) is provided with chimney (12).
2. a kind of power economized boiler as claimed in claim 1, is characterized in that, described combustion chamber comprises water jacket grate furnace (3) and the cast iron grate furnace (2) that is successively set on body of heater (10) below.
3. a kind of power economized boiler as claimed in claim 1 or 2, it is characterized in that, described chimney (12) is provided with preheater (15) near one end of body of heater (10), and preheater (15) is provided with emptying tracheae (14), and the port of export of chimney (12) is provided with flue air regulating board (11).
4. a kind of power economized boiler as claimed in claim 3, is characterized in that, the outer wall of described body of heater (10) is provided with water-level gauge (7) and thermometer (8).
5. a kind of power economized boiler as claimed in claim 4, it is characterized in that, described body of heater (10) comprises inner chamber and exocoel, described water circulating pipe comprises that several are set in parallel in the boiler tube of inner chamber (6) side by side, the two ends of each boiler tube (6) are all communicated with exocoel, the outer wall of body of heater (10) is provided with outlet pipe (9) and the return pipe (4) being interconnected, described preheater (15) is provided with feed pipe (13), and described outlet pipe (9), return pipe (4) and feed pipe (13) are all communicated with exocoel.
6. a kind of power economized boiler as claimed in claim 5, is characterized in that, the inner chamber of described body of heater (10) is vertically provided with refractory wall (5), and gap is left on one end and the inner chamber top of refractory wall (5).
CN201320361658.6U 2013-06-21 2013-06-21 Energy-saving boiler Expired - Fee Related CN203421815U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320361658.6U CN203421815U (en) 2013-06-21 2013-06-21 Energy-saving boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320361658.6U CN203421815U (en) 2013-06-21 2013-06-21 Energy-saving boiler

Publications (1)

Publication Number Publication Date
CN203421815U true CN203421815U (en) 2014-02-05

Family

ID=50020914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320361658.6U Expired - Fee Related CN203421815U (en) 2013-06-21 2013-06-21 Energy-saving boiler

Country Status (1)

Country Link
CN (1) CN203421815U (en)

Similar Documents

Publication Publication Date Title
CN102679303A (en) Horizontal dual-drum energy-efficient boiler without fireproofing-material furnace-building process
CN202018185U (en) Combined air furnace system
CN201259303Y (en) Coal briquette energy-conserving environment protection water heater
CN201066195Y (en) Horizontal type reverse-combusting coal-firing boiler
CN106016244A (en) Double-combustion chamber boiler for waste-heat utilization
CN203382777U (en) Hot-blast furnace
CN201764676U (en) Carbonized gas mixed-combustion normal pressure boiler
CN203421815U (en) Energy-saving boiler
CN201074840Y (en) Horizontal water-fire pipe dual-fire-grate inverse-burning boiler
CN204829877U (en) Horizontal living beings chain boiler that fires
CN203550187U (en) Normal-pressure biomass rolling furnace bar hot-water boiler
CN203336814U (en) Horizontal hot water boiler
CN207539881U (en) Gas-solid mixes combustion high moisture fuel steam boiler
CN2919159Y (en) Heat conducting oil heating heat furnace
CN202618250U (en) Double-pressure air inducing heating device
CN201212735Y (en) Energy saving high efficient smokeless environment protecting boiler
CN202119092U (en) Reverse combustion central heating furnace
CN101021358B (en) Energy conserving environmental protective non-pressure heating furnace
CN105004043A (en) Entrained flow bed hot water boiler
CN201028766Y (en) Biomass biphase combustion boiler
CN205939677U (en) Novel energy -conserving high -efficient inclined reciprocating grate living beings granule boiler
CN201059750Y (en) Home-use environmental protection oneself combustion boiler
CN205137544U (en) Cooking heating stove with water pipe heat exchanger
CN202581252U (en) High-efficiency energy-saving boiler for horizontal two-boiler drum non-refractory material building furnace
CN208312708U (en) A kind of inner-tube structure of energy-saving hot water stove

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140205

Termination date: 20210621

CF01 Termination of patent right due to non-payment of annual fee