CN203410984U - Obstacle passing station of tailoring system - Google Patents

Obstacle passing station of tailoring system Download PDF

Info

Publication number
CN203410984U
CN203410984U CN201320511199.5U CN201320511199U CN203410984U CN 203410984 U CN203410984 U CN 203410984U CN 201320511199 U CN201320511199 U CN 201320511199U CN 203410984 U CN203410984 U CN 203410984U
Authority
CN
China
Prior art keywords
guide rail
rail
station
obstacle
overpass
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320511199.5U
Other languages
Chinese (zh)
Inventor
翁端文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INA Intelligent Technology Zhejiang Co Ltd
Original Assignee
TAIZHOU FEIYUE SHUANGXING READYMADE GARMENTS MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIZHOU FEIYUE SHUANGXING READYMADE GARMENTS MACHINERY CO Ltd filed Critical TAIZHOU FEIYUE SHUANGXING READYMADE GARMENTS MACHINERY CO Ltd
Priority to CN201320511199.5U priority Critical patent/CN203410984U/en
Application granted granted Critical
Publication of CN203410984U publication Critical patent/CN203410984U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Intermediate Stations On Conveyors (AREA)

Abstract

The utility model discloses an obstacle passing station of a tailoring system, and belongs to the field clothing industry tools. The problems that an existing tailoring system can not well adapt to supporting columns in a factory building, and as a result, the space utilization rate of the factory building is low are solved. According to the technical scheme, the obstacle passing station comprises a guide rail which is provided with a get-in end and a get-out end, the tailoring system comprises an annular rail which is arranged on a support, the guide rail is arranged on the outer side of the annular rail in the horizontal direction, the guide rail is curved in direction, and the get-in end of the guide rail extends towards the annular rail, so that a hanger on the annular rail can be transferred to the guide rail to avoid the annular rail when the hanger reaches the get-in end, and the hanger can be transferred to the annular rail at the get-out end under the effect of a drive device.

Description

Ready-made clothes system obstacle-overpass station
Technical field
The utility model relates to a kind of ready-made clothes system, relates in particular in a kind of ready-made clothes system for avoiding the obstacle-overpass station of factory building inner support post.
Background technology
Ready-made clothes system loop wire need to be arranged in factory building, because modern clothes making process is tending towards complicated, therefore on loop wire, needs to be arranged on more workstation, and this can cause the whole institute of loop wire to take up space large.For improving the degree of utilization of factory building, existing most factory building is all tower structure, needs to arrange many load-bearing pillar stiffeners in factory building.Owing to being subject to the restriction of many factors, there is larger otherness in the structure of different factory buildings inside, therefore the size of ready-made clothes system itself can not adapt to the inner structure of whole factory buildings, when carrying out ready-made clothes system layout, if the interval between each adjacent ready-made clothes system is equal to each other, likely cause the position of the pillar stiffener in ready-made clothes system and factory building to overlap, and the ready-made clothes system of existing structure be not suitable for getting around pillar stiffener.Therefore, can only take the mode of dodging to arrange ready-made clothes system, this can reduce the space availability ratio in factory building.
Chinese utility model patent (the patent No.: disclose a kind of straight-though arrangement formula ready-made clothes system loop wire 201220473751.1), solved the inner factory building with support post when straight-though arrangement formula ready-made clothes system loop wire is set, the impact that pillar stiffener arranges loop wire is large, the problem low to the space availability ratio of this factory building, the technical scheme of taking: a kind of straight-though arrangement formula ready-made clothes system loop wire, comprise the chain and the ring rail that are circular layout, on chain, be fixed with drive configuration, roller in drive configuration is rollably located on annular guide rail, it is characterized in that, the place, at least one end of this loop wire length direction is provided with at least two sprocket wheels, this distolateral sprocket wheel of loop wire has interval on loop wire Width, these sprocket wheels and chain are connected.
Although this ready-made clothes system loop wire can hold pillar stiffener, realize the holding of pillar stiffener, the size of loop wire Width is relatively large, equally also can take too much space in factory building.Particularly pillar stiffener, not when the midway location place of loop wire Width, generally can only adopt two kinds of remedial measuress, and the one, further strengthen the width of loop wire, the 2nd, make loop wire avoid pillar stiffener and arrange.If pillar stiffener when inappropriate position, likely can have influence on the normal construction of two workstations on loop wire on loop wire length direction, therefore, also can bring the defect at few station on loop wire.
Summary of the invention
For overcoming above-mentioned defect, the utility model technical issues that need to address: a kind of ready-made clothes system obstacle-overpass station is provided, and it can effectively improve the space availability ratio in factory building.
For solveing the technical problem, the technical solution of the utility model: a kind of ready-made clothes system obstacle-overpass station, comprise guide rail, have enter the station end and departures end on guide rail, ready-made clothes system comprises ring rail, ring rail is arranged on support, guide rail reaches the outside of ring rail horizontal direction, and guide rail is curved trend, and the end that enters the station of guide rail stretches to ring rail, to move to this clothes hanger that enters the station end place on ring rail, avoid encircling rail and become rail to guide rail, and from this departures end place, become rail to ring rail under the effect of actuating device.Utilize guide rail stretch out and avoid the pillar stiffener in factory building to ring rail horizontal direction, when making to encircle clothes hanger on rail and advancing to pillar stiffener position, clothes hanger becomes rail to guide rail, and the dagger of more paying wages.Ring rail can disconnect in the position of pillar stiffener, if pillar stiffener and encircle between rail and have position, to encircle rail can be also continuous structure and press close to pillar stiffener.
As preferably, the orthogonal projection shape of described guide rail is " Qian " shape.This has adapted to the requirement that guide rail is avoided four prisms cylinder pillar stiffener well, can reduce the shared space of guide rail.
As preferably, described guide rail comprises descent stage, linkage section and the ascent stage linking together, the described end that enters the station is positioned in descent stage, departures end was positioned on the ascent stage, linkage section is in descent stage with between the ascent stage, descent stage and ascent stage are and are obliquely installed, and linkage section is positioned at the below of ring rail, the end position that the end position that linkage section is connected with descent stage will be connected with the ascent stage higher than linkage section.The described structure of guide rail facilitates clothes hanger under the effect of gravity, to pass through smoothly the lower end position place to the ascent stage, only need to be provided for the actuating device of lifting clothes hanger height at ascent stage place, be conducive to simplify the structure of actuating device, reduce the difficulty that arranges of actuating device.
As preferably, described actuating device is actuating arm or chain conveyor system, and actuating arm and described ascent stage parallel interval arrange.Actuating arm is set can carry out lifting to clothes hanger height easily, actuating arm simple in structure.
As preferably, on support, there is the cross bar of two along continuous straight runs settings that extend into guide rail top, in the inner side that entering the station of guide rail held and departures are held, be respectively arranged with a vertical rod, between two vertical rods, there is interval, a cross bar is supported in a vertical rod; On the external part of cross bar, be fixed with the column that stretches to guide rail, between the bottom of column and vertical rod, be provided with the spreader that is connected both; At column and spreader intersection location place, be provided with the supporting construction for supporting guide.By means of the support in ready-made clothes system, realize the support to guide rail, can effectively simplify the structure that guide rail is supported, conveniently to guide rail, provide stable support.
As preferably, described supporting construction comprises that one end is fixed on the hold-down arm on column and is fixed on the adapter plate of the hold-down arm other end, and the truncation surface of adapter plate is " Contraband " shape, and described guide rail is through the inside of adapter plate.By hold-down arm is set, on the one hand guide rail is supported, also can make on the other hand to form interval between guide rail and column, for clamping, have the clothes hanger of cloth to pass through smoothly.
As preferably, in each supporting construction, there are two hold-down arms, between these two hold-down arms, there is the angle of 90 degree.This has adapted to support requirement when guide rail has bending well, and these two hold-down arms can provide stable support for guide rail.
As preferably, described guide rail connects as one with ring rail.Guide rail can be to form after one whole tubular body is bent and deformed with ring rail, can be also that both are segmentation structure, but they is directly connected together.In the situation that be the structure of sectional type, can cross-under be set by the position being connected at both and realize connection at the pipe link of both inner end portion, the connecting cylinder that also can be socketed in by the position setting being connected at both both ends is realized connection.Guide rail with ring rail connect as one, can not need to guide rail enter the station end and departures end place the change rail that swinging gear is realized clothes hanger is set, can effectively simplify the structure of ready-made clothes system, facilitate clothes hanger to pass in and out swimmingly.
Compared with prior art, the beneficial effect that this obstacle-overpass station has: while arranging ready-made clothes system in factory building, if there is the location overlap that pillar stiffener position and ready-made clothes system will be arranged, and when pillar stiffener is partial to a side of loop wire Width, by this obstacle-overpass station is set, can effectively avoid pillar stiffener, realize clothes hanger smooth and easy advancing on loop wire.Do not need deliberately to get out of the way pillar stiffener and ready-made clothes system is arranged in factory building, also not needing increases the width of loop wire, facilitated in factory building ready-made clothes system has been arranged, many the ready-made clothes systems of being convenient in factory building are carried out standard arrangement, can effectively improve the space availability ratio in factory building.Even in the irrational situation in the position of pillar stiffener on loop wire length direction, when this obstacle-overpass station is set, also can makes pillar stiffener be unlikely to have influence on the construction of two workstations, thereby also can effectively guarantee the quantity of workstation on loop wire.
Accompanying drawing explanation
Fig. 1 is the three-dimensional structure diagram at this ready-made clothes system obstacle-overpass station.
Fig. 2 is the Facad structure figure at this ready-made clothes system obstacle-overpass station.
Fig. 3 is the construction profile at this ready-made clothes system obstacle-overpass station.
The specific embodiment
The structure of ready-made clothes system comprises ring rail and support, and support is for supporting ring rail.See in figure, the agent structure at the utility model ready-made clothes system obstacle-overpass station is a guide rail 2, and this guide rail 2 has enter the station end and departures end.Guide rail 2 is spatially curved trend, and the base portion of guide rail 2 is positioned at the outside of ring rail horizontal direction, and entering the station on guide rail 2 held and departures end all stretches to ring rail.Guide rail 2 is generally to connect as one with ring rail, and ring rail is now off-state in the position of factory building inner support post 5.
The orthogonal projection of guide rail 2 is shaped as " Qian " shape, and the guide rail 2 of this structure is the distortion of making for adapting to the pillar stiffener 5 of four prisms cylinder.Guide rail 2 is to consist of the descent stage 21 being connected as a single entity, linkage section 22 and ascent stage 23, and linkage section 22 is in descent stage 21 with between the ascent stage 23, and on the direct of travel of clothes hanger 3, linkage section 22 and ascent stage 23 are positioned at the downstream of descent stage 21 successively.Wherein, descent stage 21, ascent stage 23 are and are obliquely installed, and linkage section 22 is connected to the bottom of descent stage 21 and ascent stage 23, and described entering the station held and departures end is respectively formed at descent stage 21 and the upper end of ascent stage 23.Linkage section 22 is positioned at the below of ring rail, and the end position that is connected with descent stage 21 of linkage section 22 end position that will be connected with the ascent stage 23 higher than linkage section 22.Ascent stages 23 place's parallel interval be provided with actuating arm 10, the structure of actuating arm 10 comprises housing, be located at rotating band in housing and with the joining motor of rotating band, on rotating band, be fixed with the drive configuration that stretches out hull outside.Drive configuration on actuating arm 10 can extend in actuating arm 10 and the interval between the ascent stage 23, for the clothes hanger 3 in ascent stages 23 lower end being risen to ring rail position.Certainly, actuating device can be also chain conveyor system, and now guide rail 2 ends in the end of linkage section 22, and chain conveyor system is transported to the clothes hanger 3 that marches to linkage section 22 ends on ring rail.
The cross bar 1 of two horizontal arrangement on support extend into the top of guide rail 2, and two cross bars 1 are separately positioned in two vertical rods 4 that vertically arrange, and between these two vertical rods 4, have interval, and they lay respectively at the inner side of entering the station end and setting off and hold on guide rail 2.External part place at cross bar 1 is fixed with column 6, and column 6 stretches to guide rail 2, is provided with the spreader 9 that is connected both, thereby above guide rail 2, has formed stable quadrangle supporting construction in the outside of support between column 6 bottoms and vertical rod 4.
At column 6 and the crossing position of spreader 9, be provided with supporting construction, supporting construction is for supporting guide rail 2.Supporting construction comprises hold-down arm 8 and adapter plate 7, hold-down arm 8 along continuous straight runs settings, and one end of hold-down arm 8 is fixed on column 6.The truncation surface of adapter plate 7 is " Contraband " shape, and adapter plate 7 is fixed on the other end of hold-down arm 8, and guide rail 2 is through adapter plate 7, and and adapter plate 7 between realize fixing.In each supporting construction, there is the hold-down arm 8 described in two, between these two hold-down arms 8, there is the angle of 90 degree.
After this ready-made clothes system obstacle-overpass stands in and arranged, between guide rail 2 and pillar stiffener 5, require to there is enough intervals, for clothes hanger 3, pass through.This can do suitable flexural deformation to guide rail 2 and achieve the goal according to the factors such as actual clamping amount of the size of the relative position between pillar stiffener 5 and loop wire, pillar stiffener 5 truncation surfaces, 3 pairs of clothes of clothes hanger.
In the course of the work, when clothes hanger 3 advances to pillar stiffener 5 position, clothes hanger 3 becomes rail to guide rail 2 on encircling rail, under the effect of gravity, clothes hanger 3 freely slides into the bottom of the ascent stage 23 of guide rail 2, and under the effect of actuating arm 10, clothes hanger 3 is thus lifted to the height of ring rail, and become rail to ring rail, thereby complete dodging of 3 pairs of pillar stiffeners 5 of clothes hanger.

Claims (8)

1. a ready-made clothes system obstacle-overpass station, comprise guide rail, on guide rail, have enter the station end and departures end, ready-made clothes system comprises ring rail, and ring rail is arranged on support, it is characterized in that, guide rail reaches the outside of ring rail horizontal direction, and guide rail is curved trend, and the end that enters the station of guide rail stretches to ring rail, to move to this clothes hanger that enters the station end place on ring rail, avoid encircling rail and become rail to guide rail, and from this departures end place, become rail to ring rail under the effect of actuating device.
2. obstacle-overpass according to claim 1 station, is characterized in that, the orthogonal projection shape of described guide rail is " Qian " shape.
3. obstacle-overpass according to claim 1 station, it is characterized in that, described guide rail comprises descent stage, linkage section and the ascent stage linking together, the described end that enters the station is positioned in descent stage, it is upper that departures end is positioned at the ascent stage, and linkage section is in descent stage with between the ascent stage, and descent stage and ascent stage are and are obliquely installed, linkage section is positioned at the below of ring rail, the end position that the end position that linkage section is connected with descent stage will be connected with the ascent stage higher than linkage section.
4. obstacle-overpass according to claim 1 station, is characterized in that, described actuating device is actuating arm or chain conveyor system.
5. according to the obstacle-overpass station described in claim 1,2,3 or 4, it is characterized in that, the cross bar on support with two along continuous straight runs settings that extend into guide rail top, in the inner side that entering the station of guide rail held and departures are held, be respectively arranged with a vertical rod, between two vertical rods, have interval, a cross bar is supported in a vertical rod; On the external part of cross bar, be fixed with the column that stretches to guide rail, between the bottom of column and vertical rod, be provided with the spreader that is connected both; At column and spreader intersection location place, be provided with the supporting construction for supporting guide.
6. obstacle-overpass according to claim 5 station, it is characterized in that, described supporting construction comprises that one end is fixed on the hold-down arm and the adapter plate that is fixed on the hold-down arm other end on column, and the truncation surface of adapter plate is " Contraband " shape, and described guide rail is through the inside of adapter plate.
7. obstacle-overpass according to claim 6 station, is characterized in that, has two hold-down arms in each supporting construction, has the angle of 90 degree between these two hold-down arms.
8. according to the obstacle-overpass station described in claim 1,2,3 or 4, it is characterized in that, described guide rail links into an integrated entity with ring rail.
CN201320511199.5U 2013-08-21 2013-08-21 Obstacle passing station of tailoring system Expired - Lifetime CN203410984U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320511199.5U CN203410984U (en) 2013-08-21 2013-08-21 Obstacle passing station of tailoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320511199.5U CN203410984U (en) 2013-08-21 2013-08-21 Obstacle passing station of tailoring system

Publications (1)

Publication Number Publication Date
CN203410984U true CN203410984U (en) 2014-01-29

Family

ID=49973892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320511199.5U Expired - Lifetime CN203410984U (en) 2013-08-21 2013-08-21 Obstacle passing station of tailoring system

Country Status (1)

Country Link
CN (1) CN203410984U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107898037A (en) * 2018-01-01 2018-04-13 浙江衣拿智能科技有限公司 Work station position adjustable clothing system
CN109080729A (en) * 2018-06-20 2018-12-25 中国矿业大学 A kind of underground obstacle detouring mobile robot
WO2019085717A1 (en) * 2017-11-03 2019-05-09 浙江衣拿智能科技有限公司 Goods overhead load carrier driving device for conveyor system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019085717A1 (en) * 2017-11-03 2019-05-09 浙江衣拿智能科技有限公司 Goods overhead load carrier driving device for conveyor system
CN107898037A (en) * 2018-01-01 2018-04-13 浙江衣拿智能科技有限公司 Work station position adjustable clothing system
CN107898037B (en) * 2018-01-01 2023-07-28 浙江衣拿智能科技股份有限公司 Workstation position-adjustable clothing system
CN109080729A (en) * 2018-06-20 2018-12-25 中国矿业大学 A kind of underground obstacle detouring mobile robot
CN109080729B (en) * 2018-06-20 2021-01-15 中国矿业大学 Obstacle-surmounting mobile robot in pit

Similar Documents

Publication Publication Date Title
CN203410984U (en) Obstacle passing station of tailoring system
CN202697840U (en) Workstation of clothing hanging system
CN103948357B (en) External wall cleaning equipment
CN203991789U (en) The special equipment for straightening of semi-automatic steel tubes
CN106241326B (en) Automate streamline transmission method
CN202715504U (en) Pipe inside and outside simultaneous-spraying device
CN205950596U (en) Triangle -shaped circle pipe truss preparation frock bed -jig
CN205113373U (en) Conveying trolley
CN204822969U (en) Crane end beam transports workstation
CN105268869A (en) 1500T expanding machine
CN205282953U (en) Assembled goods shelves of spatial structure of transformer substation
CN204052653U (en) A kind of steel pipe linking machine governor motion
CN208249770U (en) A kind of open cut culvert, tunnel tube wall bar frame translate assembly system trolley
CN203904452U (en) Rotating stand for solar film plating machine
CN203512717U (en) High-speed tank erecting machine
CN208746917U (en) Hangar system loop wire
CN208120404U (en) The fixation of yarn bucket and wire installation
CN203592082U (en) Conveying frame
CN205274537U (en) Automatic rackwork of workpiece box
CN104085097A (en) Roller-type plastic pipe traction machine
CN106313302B (en) A kind of hanging tube device of lightweight wall producing equipment
CN205817644U (en) A kind of metal shell ring docking facilities
CN205990128U (en) Guide rail mechanism
CN220313903U (en) Horizontal traction device for steel core hydraulic rubber pipe
CN204675653U (en) A kind of adjustable transfer crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: Taizhou City, Zhejiang province Jiaojiang District 318000 leap Branch Park building 32

Patentee after: INA INTELLIGENT TECHNOLOGY (ZHEJIANG) Co.,Ltd.

Address before: 318000 Zhejiang Taizhou Jiaojiang district airport Middle Road No. 10-9 flying Double Star Garment Machinery Co., Ltd.

Patentee before: TAIZHOU FEIYUE SHUANGXING READYMADE GARMENT MACHINERY Co.,Ltd.

CP03 Change of name, title or address
CP01 Change in the name or title of a patent holder

Address after: Taizhou City, Zhejiang province Jiaojiang District 318000 leap Branch Park building 32

Patentee after: Zhejiang Yina Intelligent Technology Co.,Ltd.

Address before: Taizhou City, Zhejiang province Jiaojiang District 318000 leap Branch Park building 32

Patentee before: INA INTELLIGENT TECHNOLOGY (ZHEJIANG) Co.,Ltd.

CP01 Change in the name or title of a patent holder
CX01 Expiry of patent term

Granted publication date: 20140129

CX01 Expiry of patent term