CN203393662U - Road retaining wall - Google Patents

Road retaining wall Download PDF

Info

Publication number
CN203393662U
CN203393662U CN201320428944.XU CN201320428944U CN203393662U CN 203393662 U CN203393662 U CN 203393662U CN 201320428944 U CN201320428944 U CN 201320428944U CN 203393662 U CN203393662 U CN 203393662U
Authority
CN
China
Prior art keywords
frp
wall
wall body
spats
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201320428944.XU
Other languages
Chinese (zh)
Inventor
吴国松
胡嘉鸿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING GUOTONG CIVIL ENGINEERING TECHNOLOGY Co Ltd
Chongqing Jiaotong University
Original Assignee
CHONGQING GUOTONG CIVIL ENGINEERING TECHNOLOGY Co Ltd
Chongqing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING GUOTONG CIVIL ENGINEERING TECHNOLOGY Co Ltd, Chongqing Jiaotong University filed Critical CHONGQING GUOTONG CIVIL ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201320428944.XU priority Critical patent/CN203393662U/en
Application granted granted Critical
Publication of CN203393662U publication Critical patent/CN203393662U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Retaining Walls (AREA)

Abstract

The utility model discloses a road retaining wall disposed between a gutter and a side slope. The road retaining wall comprises a concrete foundation connected with a base and a retaining wall FRP overall structure fixed above the concrete foundation. The retaining wall FRP overall structure comprises an FRP wall body front panel. The FRP wall body front panel is disposed on one side, close to a road, above the concrete foundation. The FRP wall body front panel, the concrete foundation and the side slope form a filling groove for filling wall body filler. The road retaining wall has the advantages that the FRP wall body front panel and the wall body filler between the FRP wall body front panel and the side slope form a flexible impact energy dissipation structure, when the road retaining wall is impacted, elastic deformation of the FRP wall body front panel and the elastic buffer action of the wall body filler allows the road retaining wall to have better impact energy dissipation effect, damage to people in a car is lowered, and safety of vehicles, drivers and passengers is protected.

Description

Highway spats wall
Technical field
The utility model relates to civil engineering highway technology field, particularly a kind of highway spats wall.
Background technology
Spats wall is the retaining structure that the top side slope of current highway extensively adopts, and adopts cemented rock or concrete material to make, and often build by laying bricks or stones or the construction of cast in situs method at employing scene.
Please refer to Fig. 1, Fig. 2 and Fig. 3, Fig. 1 is the front view that dissects of a kind of highway spats wall of the prior art; Fig. 2 is the top view of a kind of highway spats wall of the prior art; Fig. 3 is the right view of a kind of highway spats wall of the prior art.
The spats of highway shown in Fig. 1 to Fig. 3 wall is arranged between the side slope 03 of both sides of highway and the cover plate for side ditch in highway lane outside, highway spats Qiang Yan highway bearing of trend is arranged, be arranged on the toe place of side slope 03 on highway, spats wall is the highway spats wall of cemented rock material, comprises spats wall wall body 01 and the landfill concrete foundation 02 below highway horizon.Spats wall wall body 01 is arranged on concrete foundation 02 top, forms overall structure.60 centimetres to 80 centimetres left and right of loose general employing, spats wall wall Shen01 top, highly generally adopt 60 centimetres to 200 centimetres left and right, 02 30 centimetres to 60 centimetres left and right of thick general employing, basis.
At present, whole cemented rock or the concrete material of adopting of highway spats wall made, and the rigidity of spats wall wall body 01 is larger, cannot carry out energy dissipating operation to automobile to time on spats wall wall body 01 there is traffic accident automobile impacting, effect of energy dissipation is poor, larger to vehicle and driver and crew's damage.
Therefore, how to improve the effect of energy dissipation of highway spats wall, reduce the damage to vehicle and driver and crew, become those skilled in the art's problem demanding prompt solution.
Utility model content
In view of this, the utility model provides a kind of highway spats wall, to improve the effect of energy dissipation of highway spats wall, reduces the damage to vehicle and driver and crew.
For achieving the above object, the utility model provides following technical scheme:
A kind of highway spats wall, for being arranged between the gutter and side slope of highway, comprise for being connected with ground and being arranged on concrete foundation between described gutter and described side slope and for being fixedly installed on the spats wall FRP overall structure above described concrete foundation;
Described spats wall FRP overall structure comprises: for being arranged on the top of described concrete foundation and near a side of described highway, be formed for the FRP wall body front panel of the packing groove of infilled wall body filler with described concrete foundation and described side slope.
Preferably, described spats wall FRP overall structure also comprises for being arranged on the FRP greening retaining casing between described FRP wall body front panel and described side slope;
Described FRP greening retaining casing is arranged at described concrete foundation upper surface for being close to a side of described side slope;
The top of described FRP greening retaining casing is provided with a plurality of openings that supply water to described wall body filler; Described FRP greening retaining casing has water inlet.
Preferably, between described FRP greening retaining casing and described FRP wall body front panel, be provided with FRP opening casing; Described FRP opening casing is fixedly installed on the upper surface of described concrete foundation;
Described FRP opening casing opening up.
Preferably, in described FRP opening casing, distributing bar is set, fill concrete in described FRP opening casing.
Preferably, described FRP opening casing is near the first side of described FRP greening retaining casing and side laminating, the second side that described FRP opening casing is relative with described the first side and the laminating of described FRP wall body front panel of described FRP greening retaining casing.
Preferably, described spats wall FRP overall structure also comprises perpendicular to described FRP wall body front panel and the FRP diaphragm for arranging along highway bearing of trend, the base of described FRP diaphragm is connected with the end face of described FRP greening retaining casing, and the side of described FRP diaphragm is connected with described FRP wall body front panel.
Preferably, the integrally-built quantity of described spats wall FRP is multistage, between adjacent two sections of described spats wall FRP overall structures, connection seam is set;
Between the integrally-built casing composition of adjacent two sections of described spats wall FRP plate, the FRP plate that connects both is set, described casing forms web, top board, base plate and the described FRP wall body front panel that plate comprises the base plate of described FRP opening casing, described FRP greening retaining casing;
Between the integrally-built described FRP diaphragm closing on of adjacent two described spats wall FRP, joint cast-in-situ concrete is set.
Preferably, also comprise for being arranged on the FRP grid at described wall body filler top;
Described FRP grid has first side for being connected with described FRP diaphragm and second side for being connected with described FRP wall body front panel.
Preferably, also comprise rubble french drain, described rubble french drain comprises for being arranged on the first rubble french drain portion of described wall body filler below and for being arranged on the second rubble french drain portion between described side slope and described wall body filler;
Described rubble french drain external surface is enclosed with geotextiles.
Preferably, the top side wall of described FRP greening retaining casing is provided with the tapping pipe of downward-sloping layout, and described tapping pipe passes described FRP wall body front panel away from one end of described FRP greening retaining casing;
In the opening supplying water to described wall body filler in the top of described FRP greening retaining casing, be provided with FRP muscle;
Described FRP muscle is wrapped with geotextiles, and described geotextiles is connected for the lower geotechnological layer of cloth of afforesting retaining casing near upper geotechnological layer of cloth and the described rubble french drain of described wall body filler near described FRP with described rubble french drain.
Preferably, described FRP wall body front panel is provided with the cultural pattern of background color layer or mould compacting for the external surface towards described highway one side.
From above-mentioned technical scheme, can find out, the highway spats wall that the utility model provides, arranges FRP wall body front panel in the side near highway, infilled wall body filler in the packing groove forming in FRP wall body front panel, concrete foundation and side slope.Because FRP is close with the concrete coefficient of expansion, the highway spats wall being comprised of FRP material and concrete can not be subject to extraneous variations in temperature and crack; And FRP is toughness material, intensity is close to the intensity of reinforcing bar material.FRP wall body front panel with and and side slope between wall body filler form flexible shock energy-dissipating structure; when highway spats wall is subject to clashing into; the elastic buffer effect of FRP wall body front panel elastic deformation and wall body filler; make the highway spats wall that the utility model provides can play good shock effect of energy dissipation; the damage of reduction to vehicle and driver and crew, protection vehicle and internal staff's safety.
And originally the experience thrust on slope, top of highway spats wall is less, its infilled wall body filler, can save a large amount of cemented rocks or concrete material, is applicable to the deficient area of stone material.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only embodiment more of the present utility model, for those of ordinary skills, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Fig. 1 is the front view that dissects of a kind of highway spats wall of the prior art;
Fig. 2 is the top view of a kind of highway spats wall of the prior art;
Fig. 3 is the right view of a kind of highway spats wall of the prior art;
A kind of highway spats wall that Fig. 4 provides for the utility model embodiment dissect front view;
The top view of a kind of highway spats wall that Fig. 5 provides for the utility model embodiment;
The right view of a kind of highway spats wall that Fig. 6 provides for the utility model embodiment;
Fig. 7 is the sectional view dissecing along A-A in Fig. 4;
Fig. 8 is the sectional view dissecing along C-C in Fig. 5;
Fig. 9 is the sectional view dissecing along B-B in Fig. 4;
The integrally-built front view that dissects of spats wall FRP that Figure 10 provides for the utility model embodiment;
The integrally-built top view of spats wall FRP that Figure 11 provides for the utility model embodiment;
The integrally-built left view of spats wall FRP that Figure 12 provides for the utility model embodiment;
The structural representation of the concrete foundation that Figure 13 provides for the utility model embodiment;
Figure 14 is the constructional drawing after the utility model spats wall FRP overall structure is installed;
Figure 15 is the constructional drawing after the utility model spats wall spats cast-in-situ concrete casing fill concrete.
In accompanying drawing, mark is as follows:
01-wall body, 02-basis, 03-side slope;
1-FRP wall body front panel, 2-FRP opening casing, 3-FRP greening retaining casing, 4-concrete foundation, 5-FRP diaphragm, 6-tapping pipe, the cast-in-situ concrete of 7-joint, 8-FRP muscle, 9-rubble french drain, 10-wall body filler, 11-FRP grid, 12-green plants, 13-side slope.
The specific embodiment
The utility model discloses a kind of highway spats wall, to improve the effect of energy dissipation of highway spats wall, reduce the damage to vehicle and driver and crew.
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is clearly and completely described, obviously, described embodiment is only the utility model part embodiment, rather than whole embodiment.Embodiment based in the utility model, those of ordinary skills are not making the every other embodiment obtaining under creative work prerequisite, all belong to the scope of the utility model protection.
Please refer to Fig. 4, Fig. 5 and Fig. 6, a kind of highway spats wall that Fig. 4 provides for the utility model embodiment dissect front view; The top view of a kind of highway spats wall that Fig. 5 provides for the utility model embodiment.The right view of a kind of highway spats wall that Fig. 6 provides for the utility model embodiment;
The utility model embodiment provides a kind of highway spats wall, for being arranged between the gutter and side slope of highway, comprise for be connected with ground and be arranged on concrete foundation 4 between described gutter and described side slope 13 and for being fixedly installed on the spats wall FRP(fibre reinforced composites of concrete foundation 4 tops, Fiber Reinforced Polymer) overall structure; Spats wall FRP overall structure comprises: for being arranged on the top of concrete foundation 4 and near a side of highway, and be formed for the FRP wall body front panel 1 of the packing groove of infilled wall body filler 10 with concrete foundation 4 and side slope 13.
The highway spats wall that the utility model embodiment provides, arranges FRP wall body front panel 1 in the side near highway, infilled wall body filler 10 in the packing groove forming in FRP wall body front panel 1, concrete foundation 4 and side slope 13.Because FRP is close with the concrete coefficient of expansion, the highway spats wall being comprised of FRP material and concrete can not be subject to extraneous variations in temperature and crack; And FRP is toughness material, intensity is close to the intensity of reinforcing bar material.FRP wall body front panel 1 and and wall body filler between the two of side slope 13 10 form flexible shock energy-dissipating structure; when highway spats wall is subject to clashing into; FRP wall body front panel 1 elastic deformation; the elastic buffer effect of wall body filler 10 can be offset impact force; make the highway spats wall that the utility model embodiment provides can play good shock effect of energy dissipation; the damage of reduction to vehicle and driver and crew, protection vehicle and internal staff's safety.
It should be noted that, FRP wall body front panel 1 can adopt 5 millimeters of FRP plates, and FRP wall body front panel 1 can adopt to side slope incline direction consistent, also can adopt 4:1 ratio of slope (being high 4 meters tilts 1 meter).The thickness of concrete foundation 4 can adopt thick 30 centimetres to 60 centimetres, certainly, also can adopt as required other sizes.
As shown in Figure 7, Figure 8 and Figure 9, in work progress, adjacent two integrally-built seams of spats wall FRP, connect by joint cast-in-situ concrete 7.
Further, in order to increase greenbelt on highway, improve the using value of the highway spats wall that the present embodiment provides, preferably wall body filler 10 is elected as can planting plants soil.For suitable moisture is provided to green plants, preferably, spats wall FRP overall structure also comprises for being arranged on the FRP greening retaining casing 3 between FRP wall body front panel 1 and side slope 13; The upper surface that FRP greening retaining casing 3 is arranged at concrete foundation 4 is for being close to a side of side slope 13; The top of FRP greening retaining casing 3 is provided with the opening supplying water to wall body filler 10; The water inlet that FRP greening retaining casing 3 has for intaking.
Further, in order to improve the intensity of the highway spats wall that the utility model embodiment provides, preferably between FRP greening retaining casing 3 and FRP wall body front panel 1, be provided with FRP opening casing 2; FRP opening casing 2 is fixedly installed on the upper surface of concrete foundation 4; FRP opening casing 2 opening up.By at FRP opening casing 2 interior fill concretes, increase the intensity of highway spats wall.
It should be noted that, FRP greening retaining casing 3 can 5 millimeters of FRP casings of high 30 centimetres wide 30 centimetres wall thickness.Spats cast-in-situ concrete FRP opening casing 2 can adopt 5 millimeters of FRP casings of high 30 centimetres loose 30 centimetres wall thickness.Certainly, also can adopt as required other sizes.
Further, in FRP opening casing 2, be filled with distributing bar, then complete the inside of FRP opening casing 2 is filled by concreting.
It should be noted that, the distributing bar of FRP opening casing 2 interior fillings can adopt the reinforcement fabrication of 12 millimeters of diameters.Certainly, also can adopt as required different reinforcing bars.
For convenient fixing, by the interior side bonds of the side of FRP opening casing 2 and FRP wall body front panel 1.Be that FRP opening casing 2 is near the first side of FRP greening retaining casing 3 and side laminating, the second side that FRP opening casing 2 is relative with the first side and 1 laminating of FRP wall body front panel of FRP greening retaining casing 3.
The inner side of FRP wall body front panel 1 is that FRP wall body front panel 1 is away from a side of highway.
As shown in Figure 10, Figure 11 and Figure 12, for the ease of FRP wall body front panel 1, FRP opening casing 2, be connected with FRP greening retaining casing 3, facilitate the integrally-built carrying of spats wall FRP and guarantee to construct after the construction intensity of spats wall, spats wall FRP overall structure also comprises the FRP diaphragm 5 of arranging perpendicular to the bearing of trend of FRP wall body front panel 1, the base of FRP diaphragm 5 is connected with the end face of FRP greening retaining casing 3, and the side of FRP diaphragm 5 is connected with FRP wall body front panel 1.
The integrative-structure that FRP wall body front panel, FRP opening casing, FRP greening retaining casing are in turn connected to form and and FRP diaphragm be connected to form described spats wall FRP overall structure.
The integrally-built quantity of spats wall FRP is multistage, and after construction, the spats wall FRP overall structure of multistage distributes along highway bearing of trend, between adjacent two sections of described spats wall FRP overall structures, is provided with connection seam.Between the integrally-built casing composition of adjacent two sections of spats wall FRP plate, the FRP plate that connects both is set, casing composition plate comprises the base plate of FRP opening casing 2, web, top board, base plate and the FRP wall body front panel 1 of FRP greening retaining casing 3.The quantity of FRP plate is a plurality of, connects respectively corresponding casing and forms plate.The base plate of FRP opening casing 2 of take is example, adjacent two sections of spats wall FRP overall structures all have the base plate of FRP opening casing 2, the base plate of two FRP opening casings 2 connects by FRP plate close one end mutually, and the base plate that FRP plate is parallel to FRP opening casing 2 fits in seam crossing.Preferably, the laminating of the base plate of half and one of them FRP opening casing 2 of FRP plate, the base plate of second half and another FRP opening casing 2 is fitted.
Between the integrally-built FRP diaphragm closing on of adjacent two spats wall FRP, joint is set, connects seam and connect by joint cast-in-situ concrete 7.
It should be noted that, FRP diaphragm 5 can 5 millimeters thick adopt FRPBan,Yan highway bearing of trend spacing can adopt 100 centimetres.50 centimetres of joint concrete seven thickness.Described in joint, FRP diaphragm 5 is apart from 25 centimetres of ends.The FRP plate that joint arranges stickup can adopt the FRPBan,Yan highway bearing of trend seam both sides length of 5 millimeters thick to be 15 centimetres, and joint arranges 30 centimetres of the FRP plate overall lengths of stickup, certainly, also can adopt as required different sizes.
As shown in figure 13, preferably concrete foundation 4 is set to cuboid.
Spats wall FRP overall structure also comprises for being arranged on the FRP grid 11 at wall body filler 10 tops; FRP grid 11 has first side for being connected with FRP diaphragm 5 and second side for being connected with FRP wall body front panel 1.In order further to strengthen the integrally-built globality of described spats wall FRP and to avoid wall body filler 10 to leak, after infilled wall body filler 10 greening, Qi top covers FRP grid 11, FRP grid 11 first side is connected with FRP diaphragm 5, and FRP grid 11 second side is connected with FRP wall body front panel 1.
It should be noted that the grid that FRP grid 11 can 10 millimeters of spacing.Certainly, also can adopt as required different sizes.
In order evenly to supply water to wall body filler 10, the highway spats wall that the utility model embodiment provides also comprises for being arranged on the rubble french drain 9 between wall body filler 10 and FRP greening retaining casing 3 and being arranged at the FRP muscle 8 in the opening supplying water to wall body filler 10; Bottom in FRP muscle 8 lower ends next-door neighbours FRP greening retaining casing 3 casees, the bottom of FRP muscle 8 upper ends next-door neighbour's wall body fillers 10; FRP muscle 8 is wrapped with geotextiles, and geotextiles is connected for the lower geotechnological layer of cloth of afforesting retaining casing 3 near upper geotechnological layer of cloth and the rubble french drain 9 of wall body filler 10 near FRP with rubble french drain 9.The lower geotechnological layer of cloth of afforesting retaining casing 3 near upper geotechnological layer of cloth and the rubble french drain 9 of wall body filler 10 near FRP with rubble french drain 9 due to the geotextiles of FRP muscle 8 outer wrapping is connected, water in FRP greening retaining casing 3 is flowed, to supply water to wall body filler 10 slowly-releasings to wall body filler 10 slowly-releasings by geotextiles along FRP muscle 8.
Further, the lower end of FRP muscle 8 is arranged at the bottom in FRP greening retaining casing 3 casees, the situation that cannot supply water when avoiding FRP greening retaining casing 3 water capacities not enough.
In work progress, the rubble french drain 9 of wall body filler 10 and its below covers with FRP afforests on the concrete surface of retaining casing 3 and the 2 interior fillings of FRP opening casing.FRP greening retaining casing 3 has and supplies water and two kinds of effects of water storage: at wall body filler 10 interior moisture when less, moisture is supplied water to wall body filler 10 by the opening of the top setting of FRP greening retaining casing 3, keep it to there is certain humidity, to the plant being planted on wall body filler 10, supply water; At wall body filler 10 interior moisture when more (extraneous rainwater etc. enter wall body filler 10), the opening that moisture is arranged to the top of FRP greening retaining casing 3 by wall body filler 10 is carried water, stores moisture to supply water when less at wall body filler 10 interior moisture.
The top side wall of FRP greening retaining casing 3 is provided with the tapping pipe 6 of downward-sloping layout, and tapping pipe 6 passes the bottom of FRP wall body front panel 1 away from one end of FRP greening retaining casing 3.At FRP greening retaining casing 3 interior water capacities, when excessive, water leaks near a side of highway to FRP wall body front panel 1 by tapping pipe 6, and draining is to roadside ditch.
Preferably, tapping pipe 6 is FRP tapping pipe.Can use PVC tapping pipe, concrete tapping pipe material type does not limit yet.
As shown in Figure 14 and Figure 15, spats wall FRP overall structure is arranged in concrete foundation 4, because tapping pipe 6 passes FRP wall body front panel 1 away from one end of FRP greening retaining casing 3, and be provided with FRP opening casing 2 between FRP greening retaining casing 3 and FRP wall body front panel 1, tapping pipe 6 passes concrete and the FRP wall body front panel 1 of FRP opening casing 2, the 2 interior fillings of FRP opening casing successively.
Preferably, rubble french drain 9 is L-type rubble french drain, comprises for being arranged on the first rubble french drain portion of wall body filler 10 bottoms and for being arranged on the second rubble french drain portion between side slope 13 and wall body filler 10.The second rubble french drain portion is spaced apart by side slope 13 and wall body filler 10, and the first rubble french drain portion holds the retaining release structures of being carried the water in the FRP greening retaining casing 3 of coming by FRP muscle 8.
Further, the green plants 12 of planting on wall body filler 10 surfaces.
It should be noted that, rubble french drain 9 is thick can adopt 15 centimetres.The top top board of FRP greening retaining casing 3 arranges an open pore, 5 centimetres of orifice diameter every 25 centimetres.The FRP muscle 8 of outsourcing geotextiles arranges one every 50 centimetres, and it is 4 centimetres that the FRP muscle 8 of outsourcing geotextiles adopts diameter after 3 centimetres of FRP muscle outsourcing geotextiles of diameters.The upper opening hole, side of FRP greening retaining casing 3,5 centimetres of orifice diameter.Tapping pipe 6 arranges one, 4 centimetres of external diameters every 200 centimetres.Certainly, also can adopt as required different sizes.
FRP wall body front panel 1 is provided with the cultural pattern of background color layer or mould compacting for the external surface towards highway one side, so that provide information to the vehicle travelling on highway.
It should be noted that, cultural pattern can comprise territory, the road special culture factor, and the background color of FRP wall body front panel 1 can adopt grey black.Certainly, also can adopt as required different contents and color.
As shown in Fig. 4-Figure 15, the utility model embodiment also provides a kind of job practices of highway spats wall, comprises step:
S1: manufacture spats wall FRP overall structure, spats wall FRP overall structure comprises FRP wall body front panel 1;
Spats wall FRP overall structure is divided into multistage ,Yan highway bearing of trend section length along highway bearing of trend can adopt 4 meters one section, and between adjacent two sections of spats wall FRP overall structures, joint is provided with connection seam; Processing and manufacturing spats wall FRP overall structure, spats wall FRP overall structure all adopts FRP material to make, because the coefficient of expansion of FRP material and concrete material is close, the highway spats wall being comprised of FRP material and concrete can not be subject to extraneous variations in temperature and crack, and FRP is toughness material, intensity is close to the intensity of reinforcing bar material; Spats wall FRP overall structure comprises that it has higher toughness and intensity for being arranged at the FRP wall body front panel 1 near roadside, is directly arranged at both sides of highway side slope bottom.
S2: concreting basis 4;
Concreting basis 4, because the basis of highway spats wall is the bottom of highway spats wall, is arranged under highway horizontal plane and is close to roadside ditch, therefore, selects concrete foundation 4 as the bottom of highway spats wall.
S3: spats wall FRP overall structure is fixed in concrete foundation 4;
The concrete material of concrete foundation 4 reaches after intensity, paste spats wall FRP overall structure, at the integrally-built soffit of spats wall FRP and concrete foundation 4 upper surface brushwork epoxy resin bonding agents, reach the strong bond of spats wall FRP overall structure and concrete foundation 4.
S4: add wall body filler 10 between FRP wall body front panel 1 and side slope 13;
Infilled wall body filler 10 in the holding tank forming in the inner side of side slope 13, concrete foundation 4 and FRP wall body front panel 1.
Because FRP wall body front panel 1 has higher toughness and intensity; between FRP wall body front panel 1 and side slope 13, be provided with wall body filler 10; when FRP wall body front panel 1 elastic deformation; to the wall body filler 10 between itself and side slope 13, exert pressure; elastic buffer effect by wall body filler 10 can be offset impact force; there is good shock effect of energy dissipation, protection vehicle and internal staff's safety.
In order to increase greenbelt, improve the use value of highway spats wall, in step S1, be specially: manufacture spats wall FRP overall structure, spats wall FRP overall structure comprises FRP wall body front panel 1 and FRP greening retaining casing 3, and FRP greening retaining casing 3 tops are provided with opening; In step S3, also comprise: FRP greening retaining casing 3 is arranged between FRP wall body front panel 1 and side slope 13; Step S4 is specially: between FRP wall body front panel 1 and side slope 13, add wall body filler 10, wall body filler 10 is covered in the concrete top of FRP greening retaining casing 3 and the 2 interior fillings of FRP opening casing.FRP greening retaining casing 3 has and supplies water and two kinds of effects of water storage: at wall body filler 10 interior moisture when less, moisture is supplied water to wall body filler 10 by the opening of the top setting of FRP greening retaining casing 3, keep it to there is certain humidity, to the plant being planted on wall body filler 10, supply water; At wall body filler 10 interior moisture when more (extraneous rainwater etc. enter wall body filler 10), the opening that moisture is arranged to the top of FRP greening retaining casing 3 by wall body filler 10 is carried water, stores moisture to supply water when less at wall body filler 10 interior moisture.
Before step S4, also comprise: to the interior interpolation distributing bar of FRP opening casing 2, to FRP opening casing 2 interior concretings.By to the interior interpolation distributing bar of FRP opening casing 2 and concreting, effectively improved the intensity after FRP opening casing 2 concretings, because it is arranged between FRP greening retaining casing 3 and FRP wall body front panel 1, avoid the damage to FRP greening retaining casing 3 when FRP wall body front panel 1 is subject to clashing into, guaranteed the safety in utilization of FRP greening retaining casing 3; And, improved the intensity of the highway spats wall that the present embodiment provides.
Further, the concrete that FRP opening casing 2 is built reaches after intensity, and between adjacent two sections of described spats wall FRP overall structures, joint arranges and pastes FRP plate connection seam; Seam bonding agent reaches after intensity, by building the gap between bonding adjacent two the spats wall FRP overall structures of joint cast-in-situ concrete 7.Globality and the intensity of the highway spats wall that the present embodiment provides have been improved.
In step S1, be specially: manufacture spats wall FRP overall structure, spats wall FRP overall structure comprises FRP wall body front panel 1, FRP greening retaining casing 3, FRP opening casing 2 and FRP diaphragm 5, FRP greening retaining casing 3 tops are provided with opening, FRP opening casing 2 be arranged at FRP greening retaining casing 3 and FRP wall body front panel 1 between, FRP opening casing 2 opening up, the side of FRP diaphragm 5 is connected with FRP wall body front panel 1, and the base of FRP diaphragm 5 is connected with FRP greening retaining casing 3.Be after FRP wall body front panel 1, FRP opening casing 2, FRP greening retaining casing 3 are in turn connected into one and and FRP diaphragm 5 is bonding is connected, form spats wall FRP overall structure.
Further, in step S1, also comprise: manufacture FRP grid 11; After step S4, also comprise step: FRP grid 11 is arranged to wall body filler 10 tops, FRP grid 11 is connected with the top of FRP wall body front panel 1 and the top of FRP diaphragm 5.FRP grid 11 has first side for being connected with FRP diaphragm 5 and second side for being connected with FRP wall body front panel 1.At wall body filler 10, be filled between FRP wall body front panel 1 and side slope 13 and complete after greening, Qi top covers FRP grid 11, FRP grid 11 first side is connected with FRP diaphragm 5, FRP grid 11 second side is connected with FRP wall body front panel 1, covers the wall body filler 10 after filling.
Before step S4, also comprise step: in the opening of FRP greening retaining casing 3, add the FRP muscle 8 that is enclosed with geotextiles, and cover rubble french drain 9 on FRP greening retaining casing 3, make FRP muscle 8 be wrapped with the lower geotechnological layer of cloth that geotextiles afforests retaining casing 3 near upper geotechnological layer of cloth and the rubble french drain 9 of wall body filler 10 near FRP with rubble french drain 9 and be connected;
FRP greening retaining casing 3 has and supplies water and two kinds of effects of water storage: at wall body filler 10 interior moisture when less, moisture is supplied water to wall body filler 10 by the opening of the top setting of FRP greening retaining casing 3, keep it to there is certain humidity, to the plant being planted on wall body filler 10, supply water; At wall body filler 10 interior moisture when more (extraneous rainwater etc. enter wall body filler 10), the opening that moisture is arranged to the top of FRP greening retaining casing 3 by wall body filler 10 is carried water, stores moisture to supply water when less at wall body filler 10 interior moisture.The top side wall of FRP greening retaining casing 3 is provided with the tapping pipe 6 of downward-sloping layout, and tapping pipe 6 passes FRP wall body front panel 1 away from one end of FRP greening retaining casing 3.At FRP greening retaining casing 3 interior water capacities, when excessive, water leaks near a side of highway to FRP wall body front panel 1 by tapping pipe 6, and draining is to roadside ditch.
Because tapping pipe 6 passes FRP wall body front panel 1 away from one end of FRP greening retaining casing 3, and be provided with FRP opening casing 2 between FRP greening retaining casing 3 and FRP wall body front panel 1, tapping pipe 6 is successively through FRP opening casing 2 and FRP wall body front panel 1.When FRP opening casing 2 interior distributing bar, tapping pipe 6 is installed, is made tapping pipe 6 through FRP opening casing 2 and FRP wall body front panel 1, then to the 2 interior cast-in-situ concretes of FRP opening casing, complete construction.
Preferably, tapping pipe 6 is FRP tapping pipe.Can use PVC tapping pipe, concrete tapping pipe material type does not limit yet.
After step S4, also comprise step: the green plants 12 of planting on wall body filler 10 surfaces.
The main beneficial effect of highway pin wall construction job practices that the utility model embodiment provides is: spats wall adopts the method that factory manufactures and on-the-spot installation combines, and quick construction is convenient.
In the present embodiment, concrete job practices is as follows:
The first step: divide multistage to manufacture spats wall FRP overall structure in factory, FRP grid 11 is manufactured in segmentation, spats wall FRP overall structure is for as mentioned above.
Second step: concrete health on building-site formwork erection concreting basis 4.
The 3rd step: the concrete curing of above-mentioned second step concrete foundation 4 reaches after intensity, at spats wall FRP overall structure soffit and concrete foundation 4 upper surface brushing bonding agents, pastes spats wall FRP overall structure to be fixed in concrete foundation 4.
The 4th step: above-mentioned the 3rd step bonding agent reaches after intensity, between adjacent two spats wall FRP overall structures, joint adopts bonding agent to paste FRP plate connection seam.Be, between the integrally-built casing composition of adjacent two spats wall FRP plate, FRP plate is set, the one side of FRP plate forms plate with an integrally-built casing of spats wall FRP and is connected, another side forms plate with the integrally-built casing of another spats wall FRP and is connected, and casing forms plate and comprises FRP opening casing 2 and FRP greening retaining casing 3.
The 5th step: above-mentioned the 4th step bonding agent reaches after intensity, to the interior interpolation distributing bar of FRP opening casing 2, installs fixedly tapping pipe 6, to FRP opening casing 2 interior concretings.
The 6th step: the concrete curing in above-mentioned the 5th step FRP opening casing 2 casees reaches after intensity, the joint cast-in-situ concrete 7 between adjacent two integrally-built FRP diaphragms 5 of spats wall FRP.
The 7th step: above-mentioned Liu Bu joint cast-in-situ concrete 7 healths reach after intensity, to installation kit in the opening at FRP greening retaining casing 3 tops, be wrapped with the FRP muscle 8 of geotextiles, between FRP wall body front panel 1 and side slope 13, fill rubble french drain 9, make FRP muscle 8 be wrapped with geotextiles and be connected with the geotechnological layer of cloth of rubble french drain 9 external surfaces; To between FRP wall body front panel 1 and side slope 13, add wall body filler 10, be covered on rubble french drain 9.
The 8th step: after above-mentioned the 7th step interpolation wall body filler 10 completes, the green plants 12 of planting on wall body filler 10 surfaces.
The 9th step: above-mentioned the 8th step is planted after green plants 12 completes, and FRP grid 11 is arranged to wall body filler 10 tops, and FRP grid 11 is connected with the top of FRP wall body front panel 1 and the top of FRP diaphragm 5.
In this manual, each embodiment adopts the mode of going forward one by one to describe, and each embodiment stresses is the difference with other embodiment, between each embodiment identical similar part mutually referring to.
Above-mentioned explanation to the disclosed embodiments, makes professional and technical personnel in the field can realize or use the utility model.To the multiple modification of these embodiment, will be apparent for those skilled in the art, General Principle as defined herein can, in the situation that not departing from spirit or scope of the present utility model, realize in other embodiments.Therefore, the utility model will can not be restricted to these embodiment shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (11)

1.Yi Zhong highway spats wall, for being arranged between the gutter and side slope (13) of highway, it is characterized in that, comprise for being connected with ground and being arranged on concrete foundation (4) between described gutter and described side slope (13) and for being fixedly installed on the spats wall FRP overall structure of described concrete foundation (4) top;
Described spats wall FRP overall structure comprises: for being arranged on the top of described concrete foundation (4) and near a side of described highway, be formed for the FRP wall body front panel (1) of the packing groove of infilled wall body filler (10) with described concrete foundation (4) and described side slope (13).
2. highway spats wall as claimed in claim 1, is characterized in that, described spats wall FRP overall structure also comprises for being arranged on the FRP greening retaining casing (3) between described FRP wall body front panel (1) and described side slope (13);
Described FRP greening retaining casing (3) is arranged at the side that described concrete foundation (4) upper surface is used for being close to described side slope (13);
The top of described FRP greening retaining casing (3) is provided with a plurality of openings that supply water to described wall body filler (10); Described FRP greening retaining casing (3) has water inlet.
3. highway spats wall as claimed in claim 2, is characterized in that, between described FRP greening retaining casing (3) and described FRP wall body front panel (1), is provided with FRP opening casing (2); Described FRP opening casing (2) is fixedly installed on the upper surface of described concrete foundation (4);
Described FRP opening casing (2) opening up.
4. highway spats wall as claimed in claim 3, is characterized in that, in described FRP opening casing (2), distributing bar is set, the interior fill concrete of described FRP opening casing (2).
5. the highway spats wall as described in claim 3 or 4, it is characterized in that, described FRP opening casing (2) is near the first side of described FRP greening retaining casing (3) and the side laminating of described FRP greening retaining casing (3), the second side that described FRP opening casing (2) is relative with described the first side and described FRP wall body front panel (1) laminating.
6. highway spats wall as claimed in claim 5, it is characterized in that, described spats wall FRP overall structure also comprises perpendicular to described FRP wall body front panel (1) and the FRP diaphragm (5) for arranging along highway bearing of trend, the base of described FRP diaphragm (5) is connected with the end face of described FRP greening retaining casing (3), and the side of described FRP diaphragm (5) is connected with described FRP wall body front panel (1).
7. highway spats wall as claimed in claim 6, is characterized in that, the integrally-built quantity of described spats wall FRP is multistage, between adjacent two sections of described spats wall FRP overall structures, connection seam is set;
Between the integrally-built casing composition of adjacent two sections of described spats wall FRP plate, the FRP plate that connects both is set, described casing forms web, top board, base plate and the described FRP wall body front panel (1) that plate comprises the base plate of described FRP opening casing (2), described FRP greening retaining casing (3);
Between the integrally-built described FRP diaphragm (5) closing on of adjacent two described spats wall FRP, joint cast-in-situ concrete (7) is set.
8. highway spats wall as claimed in claim 1, is characterized in that, also comprises for being arranged on the FRP grid (11) at described wall body filler (10) top;
Described FRP grid (11) has first side for being connected with described FRP diaphragm (5) and second side for being connected with described FRP wall body front panel (1).
9. highway spats wall as claimed in claim 1, it is characterized in that, also comprise rubble french drain (9), described rubble french drain (9) comprises for being arranged on the first rubble french drain portion of described wall body filler (10) below and for being arranged on the second rubble french drain portion between described side slope (13) and described wall body filler (10);
Described rubble french drain (9) external surface is enclosed with geotextiles.
10. highway spats wall as claimed in claim 9, it is characterized in that, the top side wall of described FRP greening retaining casing (3) is provided with the tapping pipe (6) of downward-sloping layout, and described tapping pipe (6) passes described FRP wall body front panel (1) away from one end of described FRP greening retaining casing (3);
In the opening supplying water to described wall body filler (10) in the top of described FRP greening retaining casing (3), be provided with FRP muscle (8);
Described FRP muscle (8) is wrapped with geotextiles, and described geotextiles is connected for the lower geotechnological layer of cloth of afforesting retaining casing (3) near upper geotechnological layer of cloth and the described rubble french drain (9) of described wall body filler (10) near described FRP with described rubble french drain (9).
11. highway spats walls as described in claim 1-10 any one, is characterized in that, described FRP wall body front panel (1) is provided with the cultural pattern of background color layer or mould compacting for the external surface towards described highway one side.
CN201320428944.XU 2013-07-18 2013-07-18 Road retaining wall Withdrawn - After Issue CN203393662U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320428944.XU CN203393662U (en) 2013-07-18 2013-07-18 Road retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320428944.XU CN203393662U (en) 2013-07-18 2013-07-18 Road retaining wall

Publications (1)

Publication Number Publication Date
CN203393662U true CN203393662U (en) 2014-01-15

Family

ID=49905205

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320428944.XU Withdrawn - After Issue CN203393662U (en) 2013-07-18 2013-07-18 Road retaining wall

Country Status (1)

Country Link
CN (1) CN203393662U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334392A (en) * 2013-07-18 2013-10-02 重庆交通大学 Road toe wall and construction method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334392A (en) * 2013-07-18 2013-10-02 重庆交通大学 Road toe wall and construction method thereof
CN103334392B (en) * 2013-07-18 2016-05-04 重庆交通大学 Highway spats wall and construction method thereof

Similar Documents

Publication Publication Date Title
CN203394170U (en) Prefabricated enclosing wall
CN202787009U (en) Frost boiling damage treatment structure for bituminous concrete pavement
CN110284389B (en) Asphalt pavement and construction method thereof
CN102418319A (en) Prefabricated assembled box culvert and construction method thereof
CN103952986A (en) Load-shedding type rigid culvert structure
CN108118564B (en) Pressure type box type high-speed railway roadbed structure and construction method
CN202787055U (en) Pier fixed connection structure of steel structure overhead bridge
CN210216254U (en) Concrete guardrail structure
CN102888830A (en) Plastic water channel and construction method thereof
CN205444254U (en) Deformation joint structure
CN109236322A (en) It a kind of artificial bottom plate preventing soft-rock tunnel pucking and its constructs and method for maintaining
CN203487487U (en) Anti-collision guardrail structure
CN210262555U (en) Light soil road structure
CN211079875U (en) Soil covering corrugated steel plate bridge based on gravel grouting filling layer
CN203393662U (en) Road retaining wall
CN103334392B (en) Highway spats wall and construction method thereof
CN103334441B (en) Road slope protecting structure and construction method thereof
CN101892675B (en) Flexible retaining wall with rigid support
CN104594155A (en) Permeable pavement laying method
CN103306226B (en) A kind of anticollision guardrail structure and construction method thereof
CN112012762A (en) Construction method of double-layer secondary lining multi-arch tunnel structure
CN203284814U (en) Transformer substation prefabricated concrete water-scattering device
CN113183290B (en) Factory prefabricated outdoor power equipment foundation and manufacturing and installing method thereof
CN105839504B (en) Assembled cement pavement construction method
CN105544598B (en) Assembly concrete tubulose building block ecology retaining wall

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20140115

Effective date of abandoning: 20160504

C25 Abandonment of patent right or utility model to avoid double patenting