CN203392676U - Spring assembly for balance of elevator operation - Google Patents

Spring assembly for balance of elevator operation Download PDF

Info

Publication number
CN203392676U
CN203392676U CN201320272317.1U CN201320272317U CN203392676U CN 203392676 U CN203392676 U CN 203392676U CN 201320272317 U CN201320272317 U CN 201320272317U CN 203392676 U CN203392676 U CN 203392676U
Authority
CN
China
Prior art keywords
spring
balance
wall
elevator
guide track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320272317.1U
Other languages
Chinese (zh)
Inventor
姚长云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Tianyu Elevator Industry Ltd By Share Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201320272317.1U priority Critical patent/CN203392676U/en
Application granted granted Critical
Publication of CN203392676U publication Critical patent/CN203392676U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model provides a spring assembly for the balance of elevator operation. Two tension springs are installed on a wall between elevator counterweight rails, and the springs are stretched up and down by a counterweight frame during operation to offset the weight difference generated by hoist ropes due to the up-and-down movement of a lift car so that the balance of elevator operation is achieved, a balance chain can be replaced by the springs, and abnormal sounds generated by the balance chain during the elevator operation can be eliminated.

Description

A kind of spring assembly for elevator operation balance
One, technical field:
The utility model is a kind of spring assembly for elevator operation balance, and it relates to a kind of elevator of vertical lift.
Two, technical background:
Elevator is the vehicle that in modern society, people can not leave, national Specification: in the elevator more than eight floors, balancing chain must be installed, its effect is the weight difference bringing because car moves up and down for making up, but balancing chain in use exists several problems: the one, in cage operation process, due to the swing of chain, easily produce rocking of abnormal sound and car; The 2nd, chain during along with car movement, exists the danger being hung up.
Three, the content of utility model:
The utility model just can address the above problem, it is by two springs are installed on this face wall of counterweight in hoistway, by counterweight frame up-down stretch spring when moving, offset the weight difference being produced by hoist ropes because of car up-downgoing, thereby be used for reaching the effect of balance elevator operation.
Technical solutions of the utility model: a kind of spring assembly for elevator operation balance, it comprises the first spring, the second spring, it is characterized in that: the first spring and the second spring are all arranged on the wall between Elevator weight sensor guide rail, and the line of centers of two springs lays respectively at the both sides of counter weight guide track line of centers; One end of the first described spring is fixed on the wall between well headroom counter weight guide track by annex, and the other end is supported on the wall between the counter weight guide track of hoistway middle part by annex; The first spring only can be pulled down and extend hoistway bottom by counterweight frame; One end of the second described spring is fixed on the wall between the counter weight guide track of hoistway bottom by annex, and the other end is supported on the wall between the counter weight guide track of hoistway middle part by annex; The second spring only can be upwards stretched to well headroom by counterweight frame.
Four, accompanying drawing explanation:
Fig. 1 is the balancing chain installation site figure schematic diagram of existing elevator.
Fig. 2 is that balance spring is installed schematic diagram on the wall.
Fig. 3 is that balance is to focusing on the schematic diagram of pit position.
Fig. 4 is to focusing on the schematic diagram of well headroom position.
Five, the specific embodiment:
Below by embodiment also by reference to the accompanying drawings, principle of work of the present utility model is further described:
According to the principle of 11 semi-load of car and counterweight 14 balances, the load carrying ability of take is below analyzed its principle of work as the elevator of 1000 kilograms: see Fig. 1, (in figure, not drawing machine room main frame)
If: the weight of car 11 is M kilogram;
The weight of counterweight 14 is N kilogram;
The weight of hoist ropes 12 is 2m kilogram;
The weight of balancing chain 13 is 2n kilogram;
Pulling force during spring total length is F kilogram.
: 1, when car has during in intermediate floor and semi-load:
M+500+m+n=N+m+n (m≈n)
That is: M+500=N------------------------1. (load of main frame be about rated load 5%)
2, when car has when up at bottom and at full load:
M+1000+2m=N+2n
That is: M+1000=N-------------------2. (load of main frame is 500 kilograms)
3, when car has when top layer zero load is descending:
M+2n=N+2m
That is: M+0=N-------------------------3. (load of main frame is 500 kilograms)
If now balancing chain (3) is changed into two springs (1), (3).
: 1, when car has during in intermediate floor and semi-load: (seeing Fig. 2)
M+500+m=N+m
That is: M+500=N------------------------1. (load of main frame be about rated load 5%)
2, when car is at bottom and fully loaded have when up: (seeing Fig. 4)
M+1000+2m=N+F (making F=2m)
That is: M+1000=N------------------------2. (load of main frame is 500 kilograms)
3, when car has when top layer zero load is descending: (seeing Fig. 3)
M=N+2m-F (making F=2m)
That is: M+0=N--------------------------3. (load of main frame is 500 kilograms)
In brief: when the up counterweight of car is crossed intermediate floor, start the first spring 1 (seeing Fig. 3) always toward drop-down; When the descending counterweight of car, cross intermediate floor and start the second spring 3 (seeing Fig. 4) up to draw always, so just offset the weight difference that the operation because of car is produced by hoist ropes, thereby met three equatioies above.
As can be seen here, balancing chain change into two springs on the operation of main frame without any impact, but just can eliminate the deficiency that balancing chain brings like this, meanwhile, can also save a large amount of steel.
The fixing annex on the wall of counterweight snap hook of the present utility model and balance spring, does not all draw in figure.
Spring described in the utility model is extension spring, and its length can highly be made according to the operation of elevator, and also sectional is made, and can calculate by F=2m the design parameter of spring.During installation, one end of two springs need to be fixed on the bottom of counterweight one side and the wall at top, the other end of spring need to be done an arch brace at the middle part of hoistway, and with iron on counterweight hook corresponding, when stretching respectively that can be noiseless when focusing on operation with depart from two balance springs.
In addition, also must segmentation some rubber and plastic sleeve pipes be installed spring is fixed on the wall of hoistway, the generation abnormal sound in case spring is beated.

Claims (1)

1. the spring assembly for elevator operation balance, it comprises the first spring (1), the second spring (3), it is characterized in that: the first spring (1) and the second spring (3) are all arranged on the wall between Elevator weight sensor guide rail, and the line of centers of two springs lays respectively at the both sides of counter weight guide track line of centers; One end of described the first spring (1) is fixed on the wall between well headroom counter weight guide track (2) by annex, and the other end is supported on the wall between hoistway middle part counter weight guide track (2) by annex; The first spring (1) only can be pulled down and extend hoistway bottom by counterweight frame (4); One end of described the second spring (3) is fixed on the wall between hoistway bottom counter weight guide track (2) by annex, and the other end is supported on the wall between hoistway middle part counter weight guide track (2) by annex; The second spring (3) only can be upwards stretched to well headroom by counterweight frame (4).
CN201320272317.1U 2013-05-17 2013-05-17 Spring assembly for balance of elevator operation Expired - Lifetime CN203392676U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320272317.1U CN203392676U (en) 2013-05-17 2013-05-17 Spring assembly for balance of elevator operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320272317.1U CN203392676U (en) 2013-05-17 2013-05-17 Spring assembly for balance of elevator operation

Publications (1)

Publication Number Publication Date
CN203392676U true CN203392676U (en) 2014-01-15

Family

ID=49904223

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320272317.1U Expired - Lifetime CN203392676U (en) 2013-05-17 2013-05-17 Spring assembly for balance of elevator operation

Country Status (1)

Country Link
CN (1) CN203392676U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109179152A (en) * 2018-09-28 2019-01-11 江苏施塔德电梯有限公司 A kind of super high speed elevator compensation device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109179152A (en) * 2018-09-28 2019-01-11 江苏施塔德电梯有限公司 A kind of super high speed elevator compensation device

Similar Documents

Publication Publication Date Title
CN202251652U (en) Vibration isolation structure
CN210854899U (en) Right-angle door-opening home elevator
CN208732401U (en) A kind of integral type is without bracket steel band platform villa elevator
KR20100053420A (en) Renewal method of hydraulic elevator and rope type elevator renewed by said method
CN207226724U (en) It is a kind of that there is the elevator for subtracting fall device
CN202829219U (en) Lift car gravity center dynamic automatic balance device
CN205820646U (en) A kind of Long travel elevator
CN204607309U (en) A kind of compensating rope of elevator anti-bouncing device
CN203392676U (en) Spring assembly for balance of elevator operation
CN105692400A (en) Single-column cantilever type home elevator
JP2008290828A (en) Elevator device
CN205472123U (en) High -speed elevator tight pulley device that rises
CN208265562U (en) A kind of elevator buffer device
CN206069169U (en) A kind of counterweight installs the elevator used in small machine room of safety tongs additional
CN105236249A (en) Elevator without machine room
CN206069177U (en) A kind of dumb waiter safety landing door system
CN204643440U (en) A kind of Novel elevator compensation chain guide type counterweight
CN205602964U (en) Elevator car frame underbeam
CN208843522U (en) There is computer room directly to drag and changes list around elevator
CN204251135U (en) A kind of compensated chain guide piece of vertical lift elevator
CN204689325U (en) A kind of elevator traction driving system of constant pulling ability
CN208790983U (en) A kind of double counterweight frame elevators
CN204324652U (en) Machine-roomless lift
CN201713185U (en) Backpack-type car frame system for elevator
CN103508302B (en) Novel split counterweight structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: WUHAN TIANYU STAIRCASE INDUSTRY CO., LTD.

Free format text: FORMER OWNER: YAO CHANGYUN

Effective date: 20141117

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 430010 WUHAN, HUBEI PROVINCE TO: 430000 WUHAN, HUBEI PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20141117

Address after: 430000 room 1203, Wuhan SOHO international city, Huaihailu Road, Jianghan District, Hubei, China

Patentee after: Wuhan Tianyu ladder Co.

Address before: 430010. Landslide No. 23, Jiang'an District, Hubei, Wuhan 503

Patentee before: Yao Changyun

C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 430000, Dragon Road 77, Panlong Economic Development Zone, Huangpi District, Hubei, Wuhan

Patentee after: Wuhan Tianyu elevator industry Limited by Share Ltd.

Address before: 430000 room 1203, Wuhan SOHO international city, Huaihailu Road, Jianghan District, Hubei, China

Patentee before: Wuhan Tianyu ladder Co.

CX01 Expiry of patent term

Granted publication date: 20140115

CX01 Expiry of patent term