CN203392312U - Combined concrete test mould carrying tool - Google Patents

Combined concrete test mould carrying tool Download PDF

Info

Publication number
CN203392312U
CN203392312U CN201320516575.XU CN201320516575U CN203392312U CN 203392312 U CN203392312 U CN 203392312U CN 201320516575 U CN201320516575 U CN 201320516575U CN 203392312 U CN203392312 U CN 203392312U
Authority
CN
China
Prior art keywords
concrete test
combined concrete
carrying tool
test mould
mould carrying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320516575.XU
Other languages
Chinese (zh)
Inventor
郭帅
吕峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANXI BIGHTH CONSTRUCTION GROUP CO Ltd
Original Assignee
SHANXI BIGHTH CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANXI BIGHTH CONSTRUCTION GROUP CO Ltd filed Critical SHANXI BIGHTH CONSTRUCTION GROUP CO Ltd
Priority to CN201320516575.XU priority Critical patent/CN203392312U/en
Application granted granted Critical
Publication of CN203392312U publication Critical patent/CN203392312U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a carrying device for construction, in particular to a combined concrete test mould carrying tool for solving the problems that the carrying operation of a plurality of groups of existing concrete test moulds is easily influenced by environment, wastes time and energy, and has low efficiency and high cost. The combined concrete test mould carrying tool comprises two steel poles which are arranged vertically and parallel with each other, the upper end of each steel pole is articulated with a clamping rod in an integrated and crossed manner, a hanging ring is fixed at the upper end of the clamping rod, and a plurality of locking pins corresponding to each other in a left-right manner are fixed at the inner sides of the two steel poles. The combined concrete test mould carrying tool has reasonable and reliable structure design, low cost, convenience and rapidness for use and processing and convenience for processing, and saves working hours without influencing the forming effect of a concrete test block.

Description

Combined concrete die trial handbarrow
Technical field
The utility model relates to construction Handling device, is specially a kind of combined concrete die trial handbarrow.
Background technology
The concrete test die using on building site at present has adopted plastics die trial substantially, take 100 * 100 * 100 three multi packs as main.This die trial has lightweight, coats the advantage that is easy to remove test block under the condition of mold release at inside face.But in the middle of actual engineering is used, also expose some shortcomings part.
After carrying out test block, (do not reach initial set), die trial outside is around carried uncomfortable, inconvenient.And according to the standard of test, often build the cement concrete of 100 cubic meters and at least will make one group.This also not very with supporting, form removal and turn the foster test block of mark with supporting.And the geographic position in the place of building site casting concrete is also not quite similar.For example at the bottom of slope, the place of construction operation faciostenosis, be all not suitable for carrying with push trolley and other instrument.
Summary of the invention
The utility model existence affected by environment when solving existing many group concrete test die carryings is wasted time and energy, inefficiency and the higher problem of cost, and a kind of combined concrete die trial handbarrow is provided.
The utility model is to adopt following technical scheme to realize: combined concrete die trial handbarrow, comprise vertical setting and two steel poles that are parallel to each other, the upper end of two steel poles is all connected with the clamping bar with its one and cross-articulation, the upper end of clamping bar is all fixed with suspension ring, and the inner side of two steel poles is fixed with corresponding some to bayonet lock in position, left and right.
While carrying, the upper end outer rim of every group of concrete test die is placed on a pair of bayonet lock, portable suspension ring subsequently, under the effect of clamping bar, steel pole is auto lock to the inside automatically, realize a dead lift, while having overcome existing many group concrete test die carryings existence affected by environment waste time and energy, inefficiency and the higher problem of cost.
The utility model reasonable in design is reliable, when saving working time, do not affect the molding effect of concrete test block, and cost is lower, in use procedure, convenient and swift, has advantages of simple in structure, easy to process.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
In figure: 1-steel pole, 2-clamping bar, 3-suspension ring, 4-bayonet lock.
The specific embodiment
Combined concrete die trial handbarrow, comprise vertical setting and two steel poles 1 that are parallel to each other, the upper end of two steel poles 1 is all connected with the clamping bar 2 with its one and cross-articulation, the inner side that the upper end of clamping bar 2 is all fixed with 3, two steel poles 1 of suspension ring is fixed with corresponding some to bayonet lock 4 in position, left and right.
In specific implementation process, the quantity of bayonet lock 4 is three pairs, that is to say and take three groups of die trials as one group, the reasons are as follows: 1, by the concrete average weight 2400kg of a side, calculate, the volume of each test block is 100mm * 100mm * 100mm, is 0.001 side, weight 0.001 * 2400=2.4kg, nine altogether weight reach 21.6kg, be the weight that general personnel can bear.
The vertical distance of adjacent two pairs of bayonet locks 4 is greater than the height of every group of die trial, stacks going to the bottom of Shi,Bei top die trial adhere to for fear of the test block of keeping face well in die trial assembling, affects surperficial effect.

Claims (1)

1. a combined concrete die trial handbarrow, it is characterized in that: comprise vertical setting and two steel poles (1) that are parallel to each other, the upper end of two steel poles (1) is all connected with the clamping bar (2) with its one and cross-articulation, the upper end of clamping bar (2) is all fixed with suspension ring (3), and the inner side of two steel poles (1) is fixed with corresponding some to bayonet lock (4) in position, left and right.
CN201320516575.XU 2013-08-23 2013-08-23 Combined concrete test mould carrying tool Expired - Lifetime CN203392312U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320516575.XU CN203392312U (en) 2013-08-23 2013-08-23 Combined concrete test mould carrying tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320516575.XU CN203392312U (en) 2013-08-23 2013-08-23 Combined concrete test mould carrying tool

Publications (1)

Publication Number Publication Date
CN203392312U true CN203392312U (en) 2014-01-15

Family

ID=49903859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320516575.XU Expired - Lifetime CN203392312U (en) 2013-08-23 2013-08-23 Combined concrete test mould carrying tool

Country Status (1)

Country Link
CN (1) CN203392312U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105253515A (en) * 2015-10-16 2016-01-20 河北中建工程有限公司 Carrying tool

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105253515A (en) * 2015-10-16 2016-01-20 河北中建工程有限公司 Carrying tool

Similar Documents

Publication Publication Date Title
CN202265310U (en) Multipurpose combination suspender
CN203334680U (en) Upper reversed beam lifting mold for concrete pouring
CN203392312U (en) Combined concrete test mould carrying tool
CN103398881A (en) Columnar forming device for concrete materials
CN202910964U (en) Prefabricated box web adhering type concrete vibrorammer
CN201834656U (en) Cement pipe-prefabricating outer mold hoist
CN202742489U (en) Inner die of box girder
CN202364613U (en) Convenient flowerpot clip
CN203316532U (en) Straight pipe opening shaping die
CN103774844A (en) Concrete pre-reserved hole mold for building
CN203666706U (en) Simple two-wheel lever transportation tool
CN209869000U (en) Reinforcing steel bar cover die for concrete pouring
CN202572634U (en) Vertical forming die for glass fiber reinforced plastic composite pipes
CN203156929U (en) Hand-operated knockout device
CN202910972U (en) Prefabricated die for wall crown corner building block
CN209504423U (en) A kind of mold of lamppost fixing seat prefabricated component
CN203316533U (en) Straight pipe opening shaping die
CN204823896U (en) Four bars balance crane
CN204899246U (en) Scalable operation platform is used in precast floor plank installation
CN203983024U (en) High-voltage mutual inductor casting mold assembly bench
CN202826020U (en) Steel molding plate of novel special road surface precasting plate
CN202985769U (en) Pipeline mold with operating platform
CN203237909U (en) Cement board molding and lifting device
CN203636957U (en) Foam concrete block mold
CN203726594U (en) Vibrating table for prefabricating kerbs

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Song Lei

Inventor after: Guo Shuai

Inventor after: Lv Feng

Inventor before: Guo Shuai

Inventor before: Lv Feng

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: GUO SHUAI LV FENG TO: SONG LEI GUO SHUAI LV FENG

CX01 Expiry of patent term

Granted publication date: 20140115

CX01 Expiry of patent term