CN204899246U - Scalable operation platform is used in precast floor plank installation - Google Patents
Scalable operation platform is used in precast floor plank installation Download PDFInfo
- Publication number
- CN204899246U CN204899246U CN201520615581.XU CN201520615581U CN204899246U CN 204899246 U CN204899246 U CN 204899246U CN 201520615581 U CN201520615581 U CN 201520615581U CN 204899246 U CN204899246 U CN 204899246U
- Authority
- CN
- China
- Prior art keywords
- sub
- steel
- pipe beam
- fixed
- main pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型公开了一种预制楼板安装用可伸缩操作平台,包括母管梁和子管梁,子管梁插套在母管梁中,母管梁远离子管梁的一端插套有第一钢吊环卡墙件,第一钢吊环卡墙件焊接固定在母管梁上,子管梁远离母管梁的一端插套有第二钢吊环卡墙件,第二钢吊环卡墙件焊接固定在子管梁上,固定式钢网脚手片焊接固定在两个母管梁上,活动式钢网脚手片设置在从母管梁中伸出的子管梁的部分上,母管梁压靠在一侧的支承构件上,子管梁压靠在另一侧的支承构件上,两侧的支承构件处于第一钢吊环卡墙件和第二钢吊环卡墙件之间。本平台放置在支承构件上,从而使得施工人员可以站在上面指导塔吊操作人员和对吊着的楼板进行推动,使其安装定位准确,其安全性高。
The utility model discloses a telescopic operating platform for prefabricated floor slab installation, which comprises a main pipe beam and a sub-pipe beam. Hanging ring clamping wall fittings, the first steel lifting ring clamping wall fittings are welded and fixed on the parent pipe beam, the end of the sub-tube beam far away from the mother pipe beam is inserted into a second steel lifting ring clamping wall fittings, the second steel lifting ring clamping wall fittings are welded and fixed on the On the sub-pipe beam, the fixed steel mesh scaffolding piece is welded and fixed on the two main pipe beams, and the movable steel mesh scaffolding piece is set on the part of the sub-pipe beam protruding from the main pipe beam, and the main pipe beam is pressed against the On the support member on one side, the sub-pipe girder is pressed against the support member on the other side, and the support members on both sides are between the first steel ring clip wall part and the second steel ring clip wall part. The platform is placed on the supporting components, so that construction personnel can stand on it to guide tower crane operators and push the suspended floor, so that the installation and positioning are accurate and the safety is high.
Description
技术领域:Technical field:
本实用新型涉及建筑建造技术领域,更具体的说涉及一种预制楼板安装用可伸缩操作平台。The utility model relates to the technical field of building construction, in particular to a telescopic operating platform for prefabricated floor slab installation.
背景技术:Background technique:
现有的房屋建造中,其首先是将房屋支承梁或支撑墙先制成,然后再在相邻两个房屋支承梁或支撑墙上搭建楼板,然而现有的楼板搭建时先是通过塔吊将楼板起吊并放置在两个支承梁或支撑墙之间,在进行放置时需要施工人员站在支承梁或支撑墙上,并与塔吊操作人员进行沟通,从而使塔吊操作人员能够了解具体的移动位置,同时,在放置楼板时,站在支承梁或支撑墙上的施工人员还要对吊着的楼板进行一定的左右推动,从而使得安装时定位更加准确,然而施工人员是处于支承梁或支撑墙上的,其具有一定的安全隐患。In the construction of existing houses, the supporting beams or supporting walls of the houses are firstly made, and then the floor slabs are built on the supporting beams or supporting walls of two adjacent houses. Lifting and placing between two supporting beams or supporting walls, construction personnel need to stand on the supporting beams or supporting walls during placement, and communicate with the tower crane operator, so that the tower crane operator can understand the specific moving position, At the same time, when placing the floor slab, the construction personnel standing on the supporting beam or the supporting wall also need to push the hanging floor to a certain extent, so that the positioning during installation is more accurate, but the construction personnel are on the supporting beam or supporting wall. Yes, it has certain security risks.
实用新型内容:Utility model content:
本实用新型的目的是克服现有技术的不足,提供一种预制楼板安装用可伸缩操作平台,它可以放置在支承构件上,从而使得施工人员可以站在本平台上指导塔吊操作人员和对吊着的楼板进行推动使其安装定位准确,其安全性高,而且本平台的长度可调,可以放置在不同间距的两个支承构件上。The purpose of this utility model is to overcome the deficiencies of the prior art, to provide a telescopic operating platform for prefabricated floor slab installation, which can be placed on the supporting components, so that construction personnel can stand on this platform to guide tower crane operators and counter cranes The floor slab that is on the ground can be pushed to make the installation and positioning accurate, and its safety is high. Moreover, the length of the platform is adjustable, and it can be placed on two supporting components with different distances.
本实用新型解决所述技术问题的方案是:The scheme that the utility model solves described technical problem is:
一种预制楼板安装用可伸缩操作平台,包括母管梁和子管梁,子管梁插套在母管梁中,母管梁远离子管梁的一端插套有第一钢吊环卡墙件,第一钢吊环卡墙件焊接固定在母管梁上,子管梁远离母管梁的一端插套有第二钢吊环卡墙件,第二钢吊环卡墙件焊接固定在子管梁上,固定式钢网脚手片焊接固定在两个母管梁上,活动式钢网脚手片设置在从母管梁中伸出的子管梁的部分上,母管梁压靠在一侧的支承构件上,子管梁压靠在另一侧的支承构件上,两侧的支承构件处于第一钢吊环卡墙件和第二钢吊环卡墙件之间。A telescopic operating platform for prefabricated floor slab installation, including a main pipe beam and a sub-pipe beam, the sub-pipe beam is inserted into the main pipe beam, and the end of the main pipe beam far away from the sub-pipe beam is inserted into a first steel ring clamping wall piece, The first steel lifting ring clamping wall piece is welded and fixed on the parent pipe beam, and the end of the sub-tube beam far away from the mother tube beam is inserted into the second steel lifting ring clamping wall piece, and the second steel lifting ring clamping wall piece is welded and fixed on the sub-tube beam. The fixed steel mesh scaffold is welded and fixed on the two main pipe beams, the movable steel mesh scaffold is set on the part of the sub pipe beam protruding from the mother pipe beam, and the mother pipe beam is pressed against the support member on one side On the top, the sub-pipe beam is pressed against the support member on the other side, and the support members on both sides are between the first steel ring clamping wall piece and the second steel lifting ring clamping wall piece.
所述两侧的支承构件夹持在第一钢吊环卡墙件和第二钢吊环卡墙件之间。The support members on both sides are clamped between the first steel ring clip wall part and the second steel ring clip wall part.
所述第一钢吊环卡墙件和第二钢吊环卡墙件均为椭圆形环体。Both the first steel hanging ring clamping wall piece and the second steel lifting ring clamping wall piece are oval rings.
所述母管梁远离第一钢吊环卡墙件的一端固定有橡胶耐磨套,子管梁插套在橡胶耐磨套中。A rubber wear-resistant sleeve is fixed on the end of the main pipe beam far away from the first steel suspension ring clamping wall, and the sub-pipe beam is inserted into the rubber wear-resistant sleeve.
活动式钢网脚手片的两侧壁固定有多个卡置块,活动式钢网脚手片的底面的两侧固定有多个内卡置块,内卡置块与卡置块之间成型插槽,两个子管梁插套在插槽中并夹持在两侧的内卡置块与卡置块之间,活动式钢网脚手片压靠在子管梁上。The two side walls of the movable steel mesh scaffold are fixed with a plurality of clamping blocks, and the two sides of the bottom surface of the movable steel mesh scaffold are fixed with a plurality of internal clamping blocks, between the internal clamping block and the clamping block Forming slots, two sub-tube beams are inserted into the slots and clamped between the inner clamping blocks on both sides and the clamping blocks, and the movable steel mesh scaffolding piece is pressed against the sub-tube beams.
所述内卡置块与卡置块一一对应。There is a one-to-one correspondence between the inner clamping blocks and the clamping blocks.
所述支承构件为建筑梁或建筑墙体。The supporting member is a building beam or a building wall.
本实用新型的突出效果是:The outstanding effect of the present utility model is:
与现有技术相比,它可以放置在支承构件上,从而使得施工人员可以站在本平台上指导塔吊操作人员和对吊着的楼板进行推动使其安装定位准确,其安全性高,而且本平台的长度可调,可以放置在不同间距的两个支承构件上。Compared with the existing technology, it can be placed on the supporting member, so that the construction personnel can stand on this platform to guide the tower crane operator and push the hanging floor to make the installation and positioning accurate, and its safety is high. The platform is adjustable in length and can be placed on two support members at different distances.
附图说明:Description of drawings:
图1是本实用新型放置在两个间距较小的支承构件上的结构示意图;Fig. 1 is a schematic structural view of the utility model placed on two supporting members with smaller spacing;
图2是本实用新型放置在两个间距较大的支承构件上的结构示意图;Fig. 2 is a schematic structural view of the utility model placed on two supporting members with relatively large spacing;
图3是本实用新型的母管梁和子管梁及其上的活动式钢网脚手片和固定式钢网脚手片之间的局部剖视图;Fig. 3 is a partial cross-sectional view between the parent pipe beam and the sub-pipe beam of the present invention and the movable steel mesh scaffolding piece and the fixed steel mesh scaffolding piece;
图4是图2的局部俯视图;Fig. 4 is a partial top view of Fig. 2;
图5是母管梁与第一钢吊环卡墙件之间的局部结构示意图;Fig. 5 is a schematic diagram of the local structure between the main pipe beam and the first steel ring clamping wall;
图6是母管梁和子管梁之间的局部结构示意图。Fig. 6 is a schematic diagram of the local structure between the parent tube beam and the sub-tube beam.
具体实施方式:Detailed ways:
实施例,见如图1至图6所示,一种预制楼板安装用可伸缩操作平台,包括母管梁10和子管梁20,子管梁20插套在母管梁10中,母管梁10远离子管梁20的一端插套有第一钢吊环卡墙件1,第一钢吊环卡墙件1焊接固定在母管梁10上,子管梁20远离母管梁10的一端插套有第二钢吊环卡墙件2,第二钢吊环卡墙件2焊接固定在子管梁20上,固定式钢网脚手片30焊接固定在两个母管梁10上,活动式钢网脚手片40设置在从母管梁10中伸出的子管梁20的部分上,母管梁10压靠在一侧的支承构件100上,子管梁20压靠在另一侧的支承构件100上,两侧的支承构件100处于第一钢吊环卡墙件1和第二钢吊环卡墙件2之间。For the embodiment, as shown in Figures 1 to 6, a telescopic operating platform for prefabricated floor slab installation includes a main pipe beam 10 and a sub-pipe beam 20, the sub-pipe beam 20 is inserted and sleeved in the main pipe beam 10, and the main pipe beam 10 The end far away from the sub-pipe beam 20 is plugged with a first steel lifting ring clamping wall piece 1, the first steel lifting ring clamping wall piece 1 is welded and fixed on the mother pipe beam 10, and the end of the sub-pipe beam 20 far away from the main pipe beam 10 is inserted into a sleeve There is a second steel lifting ring clamping wall piece 2, the second steel lifting ring clamping wall piece 2 is welded and fixed on the sub-tube beam 20, the fixed steel mesh scaffold piece 30 is welded and fixed on the two main tube beams 10, and the movable steel mesh The scaffold piece 40 is arranged on the part of the sub-pipe beam 20 protruding from the main pipe beam 10, the main pipe beam 10 is pressed against the support member 100 on one side, and the sub-pipe beam 20 is pressed against the support on the other side On the component 100 , the supporting components 100 on both sides are located between the first steel ring clip wall part 1 and the second steel ring clip wall part 2 .
进一步的说,所述两侧的支承构件100夹持在第一钢吊环卡墙件1和第二钢吊环卡墙件2之间。Further speaking, the support members 100 on both sides are clamped between the first steel ring clip wall part 1 and the second steel ring clip wall part 2 .
进一步的说,所述第一钢吊环卡墙件1和第二钢吊环卡墙件2均为椭圆形环体。Further speaking, the first steel ring clamping wall piece 1 and the second steel lifting ring clamping wall piece 2 are both elliptical rings.
进一步的说,所述母管梁10远离第一钢吊环卡墙件1的一端固定有橡胶耐磨套3,子管梁20插套在橡胶耐磨套3中。Furthermore, a rubber wear-resistant sleeve 3 is fixed on the end of the main pipe beam 10 far away from the first steel ring clamping wall part 1 , and the sub-pipe beam 20 is inserted into the rubber wear-resistant sleeve 3 .
进一步的说,活动式钢网脚手片40的两侧壁固定有多个卡置块4,活动式钢网脚手片40的底面的两侧固定有多个内卡置块5,内卡置块5与卡置块4之间成型插槽6,两个子管梁20插套在插槽6中并夹持在两侧的内卡置块5与卡置块4之间,活动式钢网脚手片40压靠在子管梁20上。Further, a plurality of clamping blocks 4 are fixed on both side walls of the movable steel mesh scaffold piece 40, and a plurality of internal clamping pieces 5 are fixed on both sides of the bottom surface of the movable steel mesh scaffold piece 40. A slot 6 is formed between the block 5 and the block 4, and the two sub-tube beams 20 are inserted into the slot 6 and clamped between the inner block 5 and the block 4 on both sides. The net scaffold piece 40 is pressed against the sub-tube beam 20 .
进一步的说,所述内卡置块5与卡置块4一一对应。Further speaking, the inner clamping blocks 5 correspond to the clamping blocks 4 one-to-one.
进一步的说,所述支承构件100为建筑梁或建筑墙体。Furthermore, the supporting member 100 is a building beam or a building wall.
在使用时,当两个支承构件100之间的间距较小,可以将子管梁20伸入母管梁10中,并将活动式钢网脚手片40卸下,然后放置在两个支承构件100上,如图1所示;When in use, when the distance between the two supporting members 100 is small, the sub-pipe beam 20 can be extended into the main pipe beam 10, and the movable steel mesh scaffold piece 40 can be removed, and then placed on the two supporting members. On the member 100, as shown in Figure 1;
而当两个支承构件100之间的间距较大时,可以将子管梁20伸出母管梁10,从而将活动式钢网脚手片40固定在子管梁20上,然后搭建在两个支承构件100上,如图2和图4所示。And when the distance between the two support members 100 is large, the sub-tube beam 20 can be stretched out from the main tube beam 10, so that the movable steel mesh scaffold piece 40 is fixed on the sub-tube beam 20, and then built on the two On a supporting member 100, as shown in Fig. 2 and Fig. 4 .
橡胶耐磨套3是使母管梁10和子管梁20之间不容易产生移动,保证两者的位置基本固定,使得在起吊本平台时,第一钢吊环卡墙件1和第二钢吊环卡墙件2之间的距离不会改变。The rubber wear-resistant sleeve 3 is to make it difficult to move between the main pipe beam 10 and the sub-pipe beam 20, and to ensure that the positions of the two are basically fixed, so that when the platform is lifted, the first steel ring clamps the wall part 1 and the second steel ring. The distance between the clamping wall elements 2 will not change.
而内卡置块5与卡置块4之间成型插槽6,两个子管梁20插套在插槽6中并夹持在两侧的内卡置块5与卡置块4之间,是为了保证活动式钢网脚手片40搭建在子管梁20上更加牢固的同时保证两个子管梁20之间不会相对位移。And the slot 6 is formed between the inner clamping block 5 and the clamping block 4, and the two sub-pipe beams 20 are inserted in the slot 6 and clamped between the inner clamping block 5 and the clamping block 4 on both sides. It is to ensure that the movable steel mesh scaffold piece 40 is built more firmly on the sub-tube beam 20 and at the same time ensure that there will be no relative displacement between the two sub-tube beams 20 .
最后,以上实施方式仅用于说明本实用新型,而并非对本实用新型的限制,有关技术领域的普通技术人员,在不脱离本实用新型的精神和范围的情况下,还可以做出各种变化和变型,因此所有等同的技术方案也属于本实用新型的范畴,本实用新型的专利保护范围应由权利要求限定。Finally, the above embodiments are only used to illustrate the utility model, but not to limit the utility model. Those of ordinary skill in the relevant technical fields can also make various changes without departing from the spirit and scope of the utility model. and modifications, so all equivalent technical solutions also belong to the category of the utility model, and the patent protection scope of the utility model should be defined by the claims.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520615581.XU CN204899246U (en) | 2015-08-14 | 2015-08-14 | Scalable operation platform is used in precast floor plank installation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201520615581.XU CN204899246U (en) | 2015-08-14 | 2015-08-14 | Scalable operation platform is used in precast floor plank installation |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN204899246U true CN204899246U (en) | 2015-12-23 |
Family
ID=54921433
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201520615581.XU Expired - Lifetime CN204899246U (en) | 2015-08-14 | 2015-08-14 | Scalable operation platform is used in precast floor plank installation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN204899246U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106499196A (en) * | 2016-10-31 | 2017-03-15 | 中国冶集团有限公司 | High building material transfer device |
| CN115506246A (en) * | 2022-09-09 | 2022-12-23 | 中交二航局第四工程有限公司 | A protection canopy for steel box girder construction |
-
2015
- 2015-08-14 CN CN201520615581.XU patent/CN204899246U/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106499196A (en) * | 2016-10-31 | 2017-03-15 | 中国冶集团有限公司 | High building material transfer device |
| CN115506246A (en) * | 2022-09-09 | 2022-12-23 | 中交二航局第四工程有限公司 | A protection canopy for steel box girder construction |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104314305A (en) | Integral mobile formwork for straight wall concrete pouring and its application | |
| CN203654692U (en) | Overhanging type mobile scaffold | |
| CN205476563U (en) | Elevartor shaft design operation platform | |
| CN103321405B (en) | Large formwork lifting construction method for shear wall and cylinder concrete structure | |
| CN204899246U (en) | Scalable operation platform is used in precast floor plank installation | |
| CN104179342A (en) | Hanging cage and construction method thereof for mounting profiled steel sheets on steel structural workshop wall surface | |
| CN204280974U (en) | A kind of template hoisting device | |
| CN204199667U (en) | Detachable builder's jack corner tripod | |
| CN203961258U (en) | Builder's jack foot guard structure | |
| CN204126257U (en) | Integral mobile formwork for straight wall concrete pouring | |
| CN204024673U (en) | A kind of simple and easy culvert body construction feasible walk stand | |
| CN203080934U (en) | Overhanging type discharging platform | |
| CN105756067B (en) | A kind of method of horizontal temporary support support replacement in deep basal pit | |
| CN203022327U (en) | Elevator shaft high-altitude construction platform device | |
| CN204435856U (en) | A kind of special steel concrete sliding formwork | |
| CN205116854U (en) | Coal scuttle is portable platform for aggregate erection | |
| CN203755682U (en) | Secondary pouring form board constructing structure for small opening of concrete structure floor slab | |
| CN204384005U (en) | The special laying rack of a kind of civil engineering | |
| CN203795845U (en) | Portable support for hoisting form board for pipeline blocking | |
| CN203487793U (en) | Unloading device which is convenient and rapid to use and is used for high-rise building construction | |
| CN204256258U (en) | Roof separation indicator observation device | |
| CN206000188U (en) | Rim of a cup basis steel column installs perpendicularity adjustment holding device | |
| CN217326529U (en) | A mobile platform for precise positioning of openings that can realize simultaneous masonry and lintel construction | |
| CN204418696U (en) | Vertical reinforcement spreading lifting assistor | |
| CN202467138U (en) | Mobile scaffold for building construction |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20151223 |