CN203383826U - Movable soil moving device - Google Patents
Movable soil moving device Download PDFInfo
- Publication number
- CN203383826U CN203383826U CN201320420357.6U CN201320420357U CN203383826U CN 203383826 U CN203383826 U CN 203383826U CN 201320420357 U CN201320420357 U CN 201320420357U CN 203383826 U CN203383826 U CN 203383826U
- Authority
- CN
- China
- Prior art keywords
- shaped steel
- soil
- steel plate
- native
- sleeping platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
A movable soil moving device comprises a soil moving frame and soil collecting pit side walls, wherein U-shaped steel plates are arranged on the two parallel soil collecting pit side walls, fixing steel plates are arranged on the U-shaped steel plates, steel tracks are paved on the fixing steel plates, wheels are arranged at the bottom of the soil moving frame, one piece of profile steel is fixed on each of two sides of each wheel, and screw rods are arranged between the profile steel and the U-shaped steel plates. The movable soil moving device has the characteristics of simple structure and good flexibility, and an operator can move soil by moving the soil moving frame according to the storage condition of soil in a soil collecting pit, so that the space of the soil collecting pit can be effectively utilized to the maximum.
Description
Technical field
The utility model relates to a kind of portable native device that falls.
Background technology
Adopt the common native frame that falls in the subway work of some areas, while adopting shield machine to carry out the tunneling shield construction, commonly fall native chord position and put irremovablely, the soil that falls frequently easily causes the local collection of collection heatable adobe sleeping platform mound long-pending, in construction, need many places to set up down native frame, increased many materials and manpower consumption.
Too much for the local collection soil of collection heatable adobe sleeping platform in work progress, in prior art, often take to make the larger area volume the collection heatable adobe sleeping platform, use digging machine to be turned over fortune to too much collection soil or many places be set to fall the method such as native frame and solve, but so not only increased construction cost but also affected construction speed.For the situation of the nervous construction of metro shield, simultaneously based on many factors such as economy and durations, the common fixed native frame that falls can not engineering demands.
The utility model content
Its purpose of the utility model just is to provide a kind of portable native device that falls, there are the good characteristics of simple in structure, flexible performance, operating personnel can move down native chord position according to collection heatable adobe sleeping platform internal memory soil situation and put down soil, effectively utilize substantially the space of collection heatable adobe sleeping platform.
The technical scheme that realizes above-mentioned purpose and take, comprise down native frame, collection heatable adobe sleeping platform side wall, described two parallel set heatable adobe sleeping platform side walls are provided with U-shaped steel plate, U-shaped steel plate is provided with fixation steel plate, steel rail laying on fixation steel plate, and the described native frame bottom of falling is provided with roller, each fixes a shaped steel roller both sides, between shaped steel and U-shaped steel plate, is provided with screw rod.
Compared with prior art the utlity model has following advantage.
1, this device in the subway shield tunnel construction process visual field condition at any time effectively shift position fallen native operation, greatly improved operating efficiency;
2, this device is not subject to the construction plant environmental constraints, the less investments such as its manpower, financial resources, material resources and equipment;
3, put through repeatedly moving native chord position, can effectively utilize the memory space of collection heatable adobe sleeping platform;
4, can effective guarantee operating personnel safety.
The accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Fig. 1 is this apparatus structure schematic front view.
Fig. 2 is moving structure schematic front view in this device.
The specific embodiment
This device comprises down native frame 7, collection heatable adobe sleeping platform side wall 8, as shown in Figure 1, 2, described two parallel set heatable adobe sleeping platform side walls 8 are provided with U-shaped steel plate 3, U-shaped steel plate 3 is provided with fixation steel plate, and on fixation steel plate, steel rail laying 2, and described native frame 7 bottoms of falling are provided with roller 1, each fixes a shaped steel 4 roller 1 both sides, between shaped steel 4 and U-shaped steel plate 3, is provided with screw rod 5.
Be provided with round steel pipe 6 between described U-shaped steel plate 3 and collection heatable adobe sleeping platform side wall 8.
Described U-shaped steel plate 3 is arranged at interval on collection heatable adobe sleeping platform side wall 8.
This device be on original fixed basis of falling native frame in addition innovation transformation become a kind of portable native frame that falls, be to fall native frame base support zone tourelle respectively is set one common, totally 4 roads.At collection heatable adobe sleeping platform side wall top embedded U-shaped steel plate with for fixation steel plate that fixedly rail is used, weld 4 Φ 30 round steel pipe in middle assigned address by-level before U-shaped steel plate is pre-buried, and in side edge of steel plate boring, the round steel pipe mouth of pipe is exposed as preformed hole, U-shaped steel plate is symmetrical the laying on two parallel side walls, and push down the spacing setting of native frame bottom two horizontal shaped steel, fixation steel plate each meter distance between U-shaped steel plate buried underground, the absolute altitude of all pre-embedded steel slab end faces should equate as far as possible, steel rail laying on two parallel side wall pre-embedded steel slabs, use pressing plate to fix rail, the soil that falls that is equipped with tourelle is placed on track, be welded and fixed shaped steel falling native frame bottom roller both sides, drill through equal bore hole in the corresponding U-shaped steel plate preformed hole of shaped steel position, use screw rod to insert preformed hole fixedly to fall native frame.The native frame that falls can move around on the collection heatable adobe sleeping platform, and fixes in the spacing every two soil bucket length.
Rail is 30 rail, and shaped steel is 150 * 150 shaped steel, and falls contact position, native frame bottom and is welded with right-angle side 150 isosceles triangle steel plates and fixes, and the native frame primary structure that falls is 200 * 200 shaped steel, and pre-embedded steel slab is the 1cm steel plate.
Operating principle:
A, according to actual collection heatable adobe sleeping platform size situation, install down all structures of native frame, comprise built-in fitting and fastening devices, check and guarantee to reinforce firmly;
In b, shield-tunneling construction process, fix down native frame at assigned address, fall native;
C, when falling native frame collection heatable adobe sleeping platform of living in position, to deposit soil full, and operating personnel remove set bolt, by falling native frame, slowly is pushed to and can deposits native position, and first-class bolt fixation, proceed down native operation;
D, according to field condition, repeat above-mentioned b, c work.
Claims (3)
1. one kind is portablely fallen native device, comprise down native frame (7), collection heatable adobe sleeping platform side wall (8), it is characterized in that, described two parallel set heatable adobe sleeping platform side walls (8) are provided with U-shaped steel plate (3), and U-shaped steel plate (3) is provided with fixation steel plate, steel rail laying on fixation steel plate (2), described native frame (7) bottom of falling is provided with roller (1), and each fixes a shaped steel (4) roller (1) both sides, between shaped steel (4) and U-shaped steel plate (3), is provided with screw rod (5).
2. a kind of portable native device that falls according to claim 1, is characterized in that, between described U-shaped steel plate (3) and collection heatable adobe sleeping platform side wall (8), is provided with round steel pipe (6).
3. a kind of portable native device that falls according to claim 1 and 2, is characterized in that, described U-shaped steel plate (3) is arranged at the upper interval of collection heatable adobe sleeping platform side wall (8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320420357.6U CN203383826U (en) | 2013-07-16 | 2013-07-16 | Movable soil moving device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320420357.6U CN203383826U (en) | 2013-07-16 | 2013-07-16 | Movable soil moving device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203383826U true CN203383826U (en) | 2014-01-08 |
Family
ID=49872335
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320420357.6U Expired - Fee Related CN203383826U (en) | 2013-07-16 | 2013-07-16 | Movable soil moving device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203383826U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105715280A (en) * | 2016-04-11 | 2016-06-29 | 中船重工(青岛)轨道交通装备有限公司 | Mucking and transporting method and device applied to double-shield tunnel boring machine |
-
2013
- 2013-07-16 CN CN201320420357.6U patent/CN203383826U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105715280A (en) * | 2016-04-11 | 2016-06-29 | 中船重工(青岛)轨道交通装备有限公司 | Mucking and transporting method and device applied to double-shield tunnel boring machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104390629B (en) | A kind of method determining metro operation Train induced load and tunnel long-term settlement | |
CN106542283B (en) | A kind of talus side slope construction material track conveying device and its installation and application method | |
CN204002794U (en) | The adjustable comprehensive chassis of a kind of rail formula tunnel cross-section | |
CN202595580U (en) | Subgrade box structure for gantry crane track | |
CN202273169U (en) | Trestle | |
CN102060199B (en) | Transportation method for constructing high mountain building | |
CN203383826U (en) | Movable soil moving device | |
CN207215815U (en) | A kind of analog simulation experiment shelf of unconsolidated formation traveling angle | |
CN206091872U (en) | Elevation keyhole equipment | |
CN102031757B (en) | Method for constructing bottom plate guide layer of jacked-in frame bridge | |
CN203795460U (en) | Basic structure of ballasting tower crane | |
CN101922296A (en) | Jacking iron and method for propelling box culvert by utilizing jacking iron | |
CN203716976U (en) | Track panel frame for backup of tunnel boring machine and transportation in tunnel | |
CN207130545U (en) | High-speed railway active breaking belt region road structure | |
CN202214664U (en) | Multifunctional special tool for maintaining underground rails of coal mine | |
CN206256462U (en) | A kind of conveyer belt for using ardealite as dam body | |
CN204199234U (en) | Portable flangeway sewage disposal apparatus | |
CN207582467U (en) | A kind of dam body material slope lying device | |
CN102587690B (en) | Rolling device for building translation engineering and using method thereof | |
CN203922510U (en) | A kind of simple and easy cable machine that is arranged in slope | |
CN204877488U (en) | A bracket device that can walk that is used for tunnel no. 2 lining side wall operations | |
CN202482727U (en) | Temporary road surface pavement structure for ultra-shallow burying excavation underground project | |
CN205175987U (en) | Tunnel mat stability simulation modeling experiment device | |
CN207215774U (en) | For permeable pavement to rainfall runoff and the device of Runoff contaminants Control experiment | |
CN205242203U (en) | Ware is laid to airport field way cement concrete pavement dowel steel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140108 Termination date: 20140716 |
|
EXPY | Termination of patent right or utility model |