CN203376301U - Target board device - Google Patents

Target board device Download PDF

Info

Publication number
CN203376301U
CN203376301U CN201320443342.1U CN201320443342U CN203376301U CN 203376301 U CN203376301 U CN 203376301U CN 201320443342 U CN201320443342 U CN 201320443342U CN 203376301 U CN203376301 U CN 203376301U
Authority
CN
China
Prior art keywords
target
axle
target shaft
target plate
shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320443342.1U
Other languages
Chinese (zh)
Inventor
刘爱民
阮坚强
周德纯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chinese energy construction group Jiangsu Province's power construction first Engineering Co., Ltd
Original Assignee
ENERGY CHINA JEPPC1
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ENERGY CHINA JEPPC1 filed Critical ENERGY CHINA JEPPC1
Priority to CN201320443342.1U priority Critical patent/CN203376301U/en
Application granted granted Critical
Publication of CN203376301U publication Critical patent/CN203376301U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Pressure Vessels And Lids Thereof (AREA)

Abstract

The utility model discloses a target board device which comprises a target shaft handle, a target shaft, a target shaft tray, sealing packing, a target shaft gland, a target shaft sealing stuffing box and target boards, wherein the target shaft is a cylinder and consists of a top target shaft, a middle target shaft and a bottom target shaft; the target shaft handle is fixed at the end part of the top target shaft; the lower half part of the top target shaft is arranged in the target shaft sealing stuffing box; the sealing packing is arranged between the top target shaft and the target shaft sealing stuffing box; the target shaft gland is positioned above the target shaft sealing stuffing box; the bottom target shaft is fixed in the target shaft tray; the middle target shaft is positioned in a main pipeline; three completely same grooves are formed in the outer wall of the middle target shaft along the axial direction of the middle target shaft; distances from the centers of the groove surfaces of the three grooves to the axis of the middle target shaft are equal; the target boards are embedded into the grooves; a circle of bosses are arranged on the top target shaft and are positioned in the target shaft sealing stuffing box. The target board device can continuously replace the target boards twice for inspection during steam sweeping; a self-sealing structure of the target board device can well prevent steam from leaking and ensure the safety of operation.

Description

Target plate device
Technical field
The utility model belongs to mechanical hook-up, is specifically related to a kind of target plate device, can be used for the check of voltage stabilizing washing pipe.
Background technology
Existing widely used target plate device is to excavate in the same way two target plate grooves a target axle side, and two target plate grooves adopt arranged in series, and to reach a target plate groove in main pipeline, and another target plate groove is outside main pipeline.When target plate device is used, with external force, the target plate groove in main pipeline is released together with target plate, by main pipeline, outer target plate groove pushes main pipeline together with target plate simultaneously.The target axle is under the alternating action of two ends external force, and two target plate grooves alternately pass in and out main pipeline together with target plate, to reach continuous replacing target plate, carries out the washing pipe check.But, while because of the target axle, moving to the target plate groove by the main pipeline tube wall, due to the target plate groove, there is gap in place, will make a large amount of steam spray thus, very easily injures operating personnel, therefore, this target plate device must just can carry out above-mentioned replacing target plate operation when steam stops flowing.
Summary of the invention
The purpose of this utility model is to provide a kind of target plate device, can be used for the check of voltage stabilizing washing pipe, for the voltage stabilizing of station boiler vapour system purges to check and accept, provides a kind of new way.
The technical solution that realizes the utility model purpose is: a kind of target plate device, comprise target axle handle, the target axle, target axle pallet, sealed packing, target axial compression lid, target shaft packing letter and target plate, the target axle is right cylinder, by top target axle, middle part target axle and bottom target axle form, target axle handle is fixed on Ba Zhou end, top, top target axle the latter half is placed in target shaft packing letter, sealed packing is placed between top target axle and target shaft packing letter, target axial compression lid is positioned at target shaft packing letter top, by bolt and target shaft packing letter, fix, bottom target axle is fixed in target axle pallet, middle part target axle is arranged in main pipeline, at middle part, target axle outer wall is axially offered three identical grooves along it, three groove groove face centers are equal to the distance in target axle axle center, middle part, target plate is embedded in groove, be provided with a circle boss on the target axle of top, boss is positioned at target shaft packing letter.
Groove on the target axle of above-mentioned middle part, its groove depth is not less than target plate thickness, the groove on the target axle of middle part, and its groove depth is not less than target plate thickness, the length of groove identical with middle part target axle axial length (be between its length between main pipeline internal diameter and external diameter), the 7%-9% that width is the main pipeline diameter.
Above-mentioned target plate is two, is embedded in respectively in groove, and sealed packing is between target axial compression lid and boss, and target axle pallet is fixed on main pipeline, and target shaft packing letter is fixed on main pipeline.
When the main pipeline diameter is greater than 600mm, target plate adopts fix at 3, and two ends adopt strip hole, and centre is circular hole.
When the vapor (steam) temperature by main pipeline likely is greater than 450 while spending, this target plate device adopts alloy steel to manufacture target plate device; When the vapor (steam) temperature by main pipeline is not more than 450 while spending, this target plate device can adopt No. 20 carbon steel to manufacture target plate device.
The utility model compared with prior art, its remarkable advantage: can realize can testing by double replacing target plate when steam blowing by the utility model; Its self sealing structure prevents steam leakage better, guarantees handling safety.
The accompanying drawing explanation
The overall schematic that Fig. 1 is the utility model target plate device.
The B-B sectional view that Fig. 2 is the utility model target plate device.
The top that Fig. 3 is the utility model target plate device is the axle schematic diagram.
When the target plate that Fig. 4 is the utility model target plate device is checked, be unkitted the groove face of target plate in the face of the steam flow schematic diagram.
When the target plate that Fig. 5 is the utility model target plate device is checked, the groove face of the first target plate is in the face of the steam flow schematic diagram.
When the target plate that Fig. 6 is the utility model target plate device is checked, the groove face of the second target plate is in the face of the steam flow schematic diagram.
The target plate that Fig. 7 is the utility model target plate device is schematic diagram fixedly.
Embodiment
Below in conjunction with accompanying drawing, the utility model is described in further detail.
The utility model utilizes triangular prism back near the steam flow stagnant area two groove face groove faces in flow field, makes this faceted pebble avoid steam flow not over against the steam flow direction time and washes away, can be correctly for check with the target plate that guarantees to be loaded on two groove surfaces; In its self sealing structure, encapsulant can be more closely knit under the effect of pressure, and the highly denser solidity of pressure is better, to reach the purpose that effectively prevents steam leakage.
In conjunction with Fig. 1, Fig. 2 and Fig. 3, a kind of target plate device, comprise target axle handle 1, target axle 2, target axle pallet 3, sealed packing 4, target axial compression lid 5, target shaft packing letter 6 and target plate 7, target axle 2 is right cylinder, by top target axle, middle part target axle and bottom target axle form, target axle handle 1 is fixed on Ba Zhou end, top, top target axle the latter half is placed in target shaft packing letter 6, sealed packing 4 is placed between top target axle and target shaft packing letter 6, target axial compression lid 5 is positioned at target shaft packing letter 6 tops, fixing by four bolts and target shaft packing letter 6, bottom target axle is fixed in target axle pallet 3, middle part target axle is arranged in main pipeline, at middle part, target axle outer wall is axially offered three identical grooves along it, three groove groove face centers are equal to the distance in target axle axle center, middle part, two target plates 7 are embedded in respectively in groove, be provided with a circle boss 8 on the target axle of top, boss 8 is positioned at target shaft packing letter 6.The axial groove of middle part target axle, its groove depth is greater than target plate 7 thickness.The length of groove identical with middle part target axle axial length (be between its length between main pipeline internal diameter and external diameter), width is 8% of main pipeline diameter.Sealed packing 4 is between target axial compression lid 5 and boss 8.Under the effect of vapor pressure, boss 8 is compression seal packing 4 upwards, forms self sealss, has greatly improved the sealing effectiveness of whole device.
Target axle pallet 3 is welded on main pipeline; Target shaft packing letter 6 is welded on main pipeline.
The principle that realizes a double target plate check of voltage stabilizing washing pipe is as follows:
In conjunction with Fig. 4 to Fig. 6, the stage 1: before boiler startup, target plate device is installed, the groove face that is unkitted target plate is faced to steam flow, then start boiler voltage stabilizing washing pipe;
Stage 2: the bobbing target axle, in the face of steam flow, carry out target plate check for the first time by the first target plate 7-1;
Stage 3: bobbing target axle again, in the face of steam flow, carry out target plate check for the second time by target plate 7-2;
Stage 4: target plate test ending for the second time, the bobbing target axle, be unkitted the target plate groove face to steam flow again, and the boiler of then stopping transport takes out target plate.
In conjunction with Fig. 7, when the main pipeline diameter is not more than 600mm, target plate adopts fixing (being that two ends are fixed), target plate making circular hole at 2; When the main pipeline diameter is greater than 600mm, target plate adopts fixing (being that two ends add center) at 3, and target plate two ends employing strip hole, is beneficial to target plate and expands to two ends, to eliminate the target plate distortion.Target plate is bolted together on the faceted pebble (being target axle groove floor) of middle part target axle.In three grooves of middle part target axle, two groove groove faces putting target plate must be opened the fixedly bolt hole of target plate; And the groove groove face of not putting target plate both can have been opened the fixedly bolt hole of target plate, also can not open the fixedly bolt hole of target plate.But it should be noted: the faceted pebble do not put target plate if select is not opened the fixedly bolt hole of target plate yet, and its bolt hole is also applied in use identical bolt and sealed, in case steam flow is from the bolt hole importing and target plate is blown off.

Claims (7)

1. a target plate device, comprise target axle handle (1), target axle (2), target axle pallet (3), sealed packing (4), target axial compression lid (5), target shaft packing letter (6) and target plate (7); Target axle (2) is right cylinder, by top target axle, middle part target axle and bottom target axle, formed, target axle handle (1) is fixed on Ba Zhou end, top, top target axle the latter half is placed in target shaft packing letter (6), sealed packing (4) is placed between top target axle and target shaft packing letter (6), target axial compression lid (5) is positioned at target shaft packing letter (6) top, and fixing by bolt and target shaft packing letter (6), bottom target axle is fixed in target axle pallet (3); It is characterized in that: middle part target axle is arranged in main pipeline, and at middle part, target axle outer wall is axially offered three identical grooves along it, and three groove groove face centers are equal to the distance in target axle axle center, middle part; Target plate (7) is embedded in groove; Top target axle is provided with a circle boss (8), and boss (8) is positioned at target shaft packing letter (6).
2. target plate device according to claim 1 is characterized in that: the groove on the target axle of middle part, and its groove depth is not less than target plate (7) thickness, and the length of groove is identical with middle part target axle axial length, the 7%-9% that width is the main pipeline diameter.
3. target plate device according to claim 1, it is characterized in that: target plate (7) is two, is embedded in groove respectively.
4. target plate device according to claim 1 is characterized in that: sealed packing (4) is positioned between target axial compression lid (5) and boss (8).
5. target plate device according to claim 1, it is characterized in that: target axle pallet (3) is fixed on main pipeline.
6. target plate device according to claim 1, it is characterized in that: target shaft packing letter (6) is fixed on main pipeline.
7. target plate device according to claim 1 is characterized in that: when the main pipeline diameter is not more than 600mm, target plate (7) adopt 2 fixing, be circular hole; When the main pipeline diameter is greater than 600mm, target plate (7) adopts fix at 3, and two ends adopt strip hole, and centre is circular hole.
CN201320443342.1U 2013-07-24 2013-07-24 Target board device Expired - Fee Related CN203376301U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320443342.1U CN203376301U (en) 2013-07-24 2013-07-24 Target board device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320443342.1U CN203376301U (en) 2013-07-24 2013-07-24 Target board device

Publications (1)

Publication Number Publication Date
CN203376301U true CN203376301U (en) 2014-01-01

Family

ID=49838824

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320443342.1U Expired - Fee Related CN203376301U (en) 2013-07-24 2013-07-24 Target board device

Country Status (1)

Country Link
CN (1) CN203376301U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103344744A (en) * 2013-07-24 2013-10-09 中国能源建设集团江苏省电力建设第一工程公司 Target plate device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103344744A (en) * 2013-07-24 2013-10-09 中国能源建设集团江苏省电力建设第一工程公司 Target plate device
CN103344744B (en) * 2013-07-24 2015-02-18 中国能源建设集团江苏省电力建设第一工程公司 Target plate device

Similar Documents

Publication Publication Date Title
CN103344744B (en) Target plate device
WO2015184716A1 (en) High-pressure-resistant integrated leakage-free rotating compensator
CN207421629U (en) A kind of flange pressurized leak stoppage frock
CN203376301U (en) Target board device
CN203929520U (en) A kind of heat exchanger tube pass pressure testing device
CN202901675U (en) Maintenance-free external pressure directly-buried expansion joint
CN210484998U (en) Natural gas line salvagees plugboard
WO2015184718A1 (en) Wear-resistant anti-impact spherical compensator
CN206988623U (en) A kind of deep basal pit ditch underground pipelines connect head
CN103836218B (en) A kind of coking tower valve
CN202834497U (en) Unthreaded sealing flange
CN103364280A (en) Method for testing mechanical strength of transformer fuel tank
CN102878381A (en) Maintenance-free external-pressing direct buried expansion joint
CN209671873U (en) A kind of wear-resisting pump line of segmented
CN203948678U (en) The box-like sealing configuration of a kind of valve sets
CN209587143U (en) A kind of pressurized type gasket
CN202954703U (en) Elastic connecting structure, between double-layer containment, of large-scale nuclear power station equipment gate
CN207034375U (en) The online device for plugging of HTHP steam system valve gate valve bar
CN204101250U (en) A kind of double mechanical seal stationary state pressure testing device
CN204421461U (en) A kind of cooling circulating water system
CN103423534B (en) Leakage control device for ball valve telescopic joint of pump storage group
CN203023735U (en) Arc-plate-type sealing and plugging clamp
CN203572147U (en) Novel drying box conduction oil header sealing structure
CN203463831U (en) Telescopic joint anti-leaking device of water pumping energy-accumulating unit ball valve
CN210598742U (en) Sealed cooling device of proof box door

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Aimin

Inventor after: Xu Xianjing

Inventor after: Chen Geshun

Inventor after: Wang Binqi

Inventor after: Zhou Dechun

Inventor before: Liu Aimin

Inventor before: Ruan Jianqiang

Inventor before: Zhou Dechun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU AIMIN RUAN JIANQIANG ZHOU DECHUN TO: LIU AIMIN XU XIANJING CHEN GESHUNWANG BINQI ZHOU DECHUN

C56 Change in the name or address of the patentee

Owner name: CEEC JIANGSU ELECTRIC POWER CONSTRUCTION FIRST ENG

Free format text: FORMER NAME: CEEC JIANGSU ELECTRIC POWER CONSTRUCTION FIRST ENGINEERING COMPANY

CP01 Change in the name or title of a patent holder

Address after: Nanjing City, Jiangsu province Longpan road 210001 No. 459 Hongyi estate building block B

Patentee after: Chinese energy construction group Jiangsu Province's power construction first Engineering Co., Ltd

Address before: Nanjing City, Jiangsu province Longpan road 210001 No. 459 Hongyi estate building block B

Patentee before: Energy China JEPPC1

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140101

Termination date: 20150724

EXPY Termination of patent right or utility model