CN203373670U - Guide beam hanging device used for hanging basket - Google Patents
Guide beam hanging device used for hanging basket Download PDFInfo
- Publication number
- CN203373670U CN203373670U CN201320412090.6U CN201320412090U CN203373670U CN 203373670 U CN203373670 U CN 203373670U CN 201320412090 U CN201320412090 U CN 201320412090U CN 203373670 U CN203373670 U CN 203373670U
- Authority
- CN
- China
- Prior art keywords
- hanging
- hanging basket
- overhang
- erecting
- nose girder
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
A guide beam hanging device used for a hanging basket comprises a hanging bracket (2) put into a guide beam (1) in a sleeved mode and a hanging rod assembly (6) used for hanging the hanging bracket (2) onto a beam body (8). The guide beam hanging device used for the hanging basket is characterized in that the hanging end of the hanging bracket (2) is connected with a supporting body (3), a lug base (5) is hinged to the other end of the supporting body (3), and the lug base (5), the supporting body (3), the hanging bracket (2) and the beam body (8) can be fastened into an integral structure through the hanging rod assembly (6). The hanging device effectively relieves transverse deformation of a hanging rod, and the overall stability and the transverse bending resistance of the hanging device are obviously improved.
Description
Technical field
The utility model relates to a kind of bridge Construction of continuous beam Hanging Basket, is specifically related to a kind of erecting by overhang of the nose girder for Hanging Basket.
Background technology
Present stage, rapidly, bridge construction adopts the outstanding engineering method of filling with to be constructed to the development of Bridges in Our Country building cause.Outstanding capital equipment of filling with engineering method is Hanging Basket, flatly be connected with some groups of nose girders on Hanging Basket, generally be inserted in better simply erecting by overhang on nose girder, the some work load of Hanging Basket is delivered on erecting by overhang by nose girder, this erecting by overhang not only will bear the vertical quiet service load of part of Hanging Basket, the load of laterally starting building to do that also will bear hanging basket advancing.Existing Hanging Basket erecting by overhang is general to be adopted with the suspension bracket of roller and pricks the screw-thread steel suspension rod for the essence that hanger suspending is connected to Liang Tishang, in use, the essence hung is separately pricked the screw-thread steel suspension rod and easily when nose girder moves forward, is produced the transverse bending distortion, thereby cause hanging basket formwork reach difficulty, even cause Hangers failure and the security incident that causes hanging basket formwork to fall.
The utility model content
Technical problem to be solved in the utility model is to provide a kind of lateral deformation that effectively alleviates suspension rod, improves significantly the erecting by overhang of the nose girder for Hanging Basket of resistance to overturning and the horizontal anti-bending strength of erecting by overhang.
For solving the problems of the technologies described above, a kind of erecting by overhang of the nose girder for Hanging Basket of the present utility model, comprise the suspension bracket that is inserted in nose girder, for suspension bracket is hung to the hanger rod component at Liang Tishang, its design feature is, suspension bracket is hung end and is connected with supporter, at the other end of supporter, is hinged with the ear seat, by hanger rod component, ear seat, supporter and suspension bracket can be fastenedly connected into to overall structure with the beam body.
Further, supporter comprises screw mandrel, link, is actively socketed on the support set of screw mandrel spiral part, and is combined on the adjusting nut on screw mandrel.
Further, an end of screw mandrel is consolidated with link, screw mandrel and link have coaxial line to the perforation.
Further, the other end of support set pivot bush unit is connected with the hinge pin hinged with the ear seat.
Further, the fixed link of an end of suspension bracket and screw mandrel removably connects.
Further, the base plate of ear seat middle part offers and swings equidirectional to wearing elongate slot with the ear seat.
Further, the swaying direction of ear seat is vertical with the direction of motion of nose girder.
A kind of erecting by overhang of the nose girder for Hanging Basket of the present utility model, can bring following beneficial effect with respect to prior art:
1, hang end and be connected with supporter due to suspension bracket, the other end at supporter is hinged with the ear seat, ear seat, supporter and suspension bracket can be fastenedly connected into to overall structure with the beam body by hanger rod component, effectively alleviate the lateral deformation of suspension rod, improved significantly resistance to overturning and the horizontal anti-bending strength of hanger device.
2, equidirectional to wearing elongate slot owing to offering with the swing of ear seat on ear seat base plate middle part, this erecting by overhang is adapted to the different plane of beam body or tilts to install.
3,, by the screw mandrel on supporter, support set and adjusting nut, can adjust easily the height up and down of suspension bracket.
4, the fixed link of an end of suspension bracket and screw mandrel removably connects, and can change easily different supporters, meets the needs of the beam body of different structure form to the erecting by overhang height change.
5, ear seat, supporter parts can adopt steel plate, steel pipe processing, manufacture simple, with low cost.
The accompanying drawing explanation
Accompanying drawing described herein is used to provide further understanding of the present utility model, forms the application's a part, and schematic description and description of the present utility model, for explaining the utility model, does not form improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 is a kind of erecting by overhang of the nose girder for Hanging Basket elevation of the utility model embodiment;
Fig. 2 is the lateral view of Fig. 1;
Fig. 3 is supporter and the ear seat assembling elevation of a kind of erecting by overhang of the nose girder for Hanging Basket of the utility model embodiment;
Fig. 4 is the lateral view of Fig. 3;
Fig. 5 is the top view of Fig. 3;
Fig. 6 is the suspension bracket elevation of a kind of erecting by overhang of the nose girder for Hanging Basket of the utility model embodiment;
Fig. 7 is the lateral view of Fig. 6;
Fig. 8 is the elevation that a kind of erecting by overhang of the nose girder for Hanging Basket of the utility model embodiment is arranged on Liang Tishang; And
Fig. 9 is the lateral view of Fig. 8.
The specific embodiment
It should be noted that, in the situation that do not conflict, embodiment and the feature in embodiment in the application can combine mutually.Describe below with reference to the accompanying drawings and in conjunction with the embodiments the utility model in detail.
Referring to Fig. 1 and Fig. 2, a kind of erecting by overhang of the nose girder for Hanging Basket of the utility model embodiment, comprise that suspension bracket 2, supporter 3, ear seat 5 and hanger rod component 6 form.Wherein, the upper end of suspension bracket 2 (being the end of hanging of suspension bracket 2) is connected with supporter 3 by bolt 7, be hinged with ear seat 5 in the upper end of supporter 3 (being the other end of supporter 3) by hinge pin 4, the suspension rod 601 of suspension rod 601(the present embodiment of hanger rod component 6 adopts essence to prick screw-thread steel) can pass successively suspension bracket 2, supporter 3, ear seat 5.
Referring to Fig. 3, Fig. 4 and Fig. 5, supporter 3 comprises screw mandrel 303, link 301, is actively socketed on the support set 305 of screw mandrel 303 spiral parts, and is combined on the adjusting nut 304 on screw mandrel 303.Wherein, for saving processing cost, screw mandrel 303 and support set 305 adopt steel pipe processing, the vertical link 301 that is welded with at an end of screw mandrel 303, this link 301 can be processed into circle or square flange structure, be welded with four impartial triangles and strengthen gussets 302 to strengthen intensity between link 301 and screw mandrel 303, screw mandrel 303 and welding link 301 at one end be processed with coaxial line to perforation, be convenient to essence and prick screw-thread steel suspension rod 601 and pass.The internal orifice dimension of support set 305 is a bit larger tham the external diameter of screw mandrel 303, guarantee that screw mandrel 303 inserts support set 305 easily, the other end coordinated with screw mandrel 303 at support set 305 is connected with the hinge pin 4 hinged with ear seat 5, for guarantee essence prick screw-thread steel suspension rod 601 through the time and hinge pin 4 do not interfere, the present embodiment is welded with respectively the hinge pin 4 of coaxial line in the outer wall both sides of support set 305, the otic placode 501 of ear seat 5 can be processed to form with the equipped of hinge pin 4 in factory, forms the assembly of ear seat 5 and support set 305.Base plate 502 middle parts of ear seat 5 offer with 5 swings of ear seat equidirectional to wearing elongate slot 503, and the swaying direction of ear seat 5 is vertical with the direction of motion of nose girder 1.
Referring to Fig. 6 and Fig. 7, suspension bracket 2 adopts steel plate 203 weld all arounds to become the rectangular configuration of hollow, lower lumen in rectangular configuration is equipped with roller 202 by bearing pin 201, rectangular configuration the end, upper end be welded with and the corresponding framework junction plate 205 of aforementioned link 301, to realize suspension bracket 2 and supporter 3, removably connect.Be welded with a stiffener 204 with the be separated by inner chamber position of rectangular configuration of a segment distance of framework junction plate 205, the middle part coaxial line of its middle frame junction plate 205 and stiffener 204 be processed with perforation, be convenient to essence and prick screw-thread steel suspension rod 601 and pass.
Install and use process
Referring to Fig. 8 and Fig. 9, suspension bracket 2 is set on to the assigned address on nose girder 1, supporter 3 connects into integral body with suspension bracket 2 by bolt 7, adjusting nut 304 is threaded to screw mandrel 303 root positions, support set 305 is inserted in screw mandrel 303, essence is pricked screw-thread steel suspension rod 601 and is worn from beam body 8, successively through ear seat 5, supporter 3, the strong plate 204 of suspension bracket 2, screw in nut 602 two ends that essence is pricked screw-thread steel suspension rod 601 again, this erecting by overhang is suspended under the wing plate of beam body 8, turn adjusting nut 304 makes progress, when adjusting nut 304 butts to the end face of support set 305, progressively support set 305 is upwards ejected, until the base plate 502 of ear seat 5 is close to the wing plate of beam body 8.
The foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, for a person skilled in the art, the utility model can have various modifications and variations.All within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection domain of the present utility model.
Claims (7)
1. the erecting by overhang of the nose girder for Hanging Basket, comprise the suspension bracket (2) that is inserted in nose girder (1), for described suspension bracket (2) is hung to the hanger rod component (6) on beam body (8), it is characterized in that, described suspension bracket (2) is hung end and is connected with supporter (3), the other end at described supporter (3) is hinged with ear seat (5), by described hanger rod component (6), described ear seat (5), supporter (3) and suspension bracket (2) and beam body (8) can be tightened to overall structure.
2. the erecting by overhang of the nose girder for Hanging Basket according to claim 1, it is characterized in that, described supporter (3) comprises screw mandrel (303), link (301), is actively socketed on the support set (305) of described screw mandrel (303) spiral part, and is combined on the adjusting nut (304) on described screw mandrel (303).
3. the erecting by overhang of the nose girder for Hanging Basket according to claim 2, is characterized in that, an end of described screw mandrel (303) is consolidated with link (301), described screw mandrel (303) and link (301) have coaxial line to the perforation.
4. the erecting by overhang of the nose girder for Hanging Basket according to claim 2, is characterized in that, the other end of described support set (305) pivot bush unit is connected with the hinge pin (4) hinged with described ear seat (5).
5. the erecting by overhang of the nose girder for Hanging Basket according to claim 1, is characterized in that, the fixed link (301) of an end of described suspension bracket (2) and screw mandrel (303) removably connects.
6. according to the described erecting by overhang of the nose girder for Hanging Basket of claim 1 or 4, it is characterized in that, base plate (502) middle part of described ear seat (5) offers and swings equidirectional to wearing elongate slot (503) with ear seat 5.
7. the erecting by overhang of the nose girder for Hanging Basket according to claim 5, is characterized in that, the swaying direction of described ear seat (5) is vertical with the direction of motion of described nose girder (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320412090.6U CN203373670U (en) | 2013-07-11 | 2013-07-11 | Guide beam hanging device used for hanging basket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320412090.6U CN203373670U (en) | 2013-07-11 | 2013-07-11 | Guide beam hanging device used for hanging basket |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203373670U true CN203373670U (en) | 2014-01-01 |
Family
ID=49836215
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320412090.6U Expired - Fee Related CN203373670U (en) | 2013-07-11 | 2013-07-11 | Guide beam hanging device used for hanging basket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203373670U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106049296A (en) * | 2016-07-19 | 2016-10-26 | 贵州路桥集团有限公司 | Articulated anchor box |
-
2013
- 2013-07-11 CN CN201320412090.6U patent/CN203373670U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106049296A (en) * | 2016-07-19 | 2016-10-26 | 贵州路桥集团有限公司 | Articulated anchor box |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206667730U (en) | A kind of scalable suspension scaffold of socket joint type disk button | |
CN203373670U (en) | Guide beam hanging device used for hanging basket | |
CN203094587U (en) | Adjustable parcel packaging frame | |
CN206233542U (en) | It is a kind of to hang die device for jacking construction platform | |
CN204174912U (en) | Integrated climbing frame is led, hang separate type Cantilever Beams combining structure | |
CN203767854U (en) | Pipeline hoisting frame | |
CN207308647U (en) | A kind of three rolls plate bending machine guiding hanger | |
CN206971086U (en) | Cast-in-situ box girder side web and wing plate are integrally supported frame | |
CN210459924U (en) | Novel construction scaffold | |
CN209369390U (en) | High-altitude construction safety suspension arrangement is built in a kind of room | |
CN207144457U (en) | A kind of scaffold bearing | |
CN202769631U (en) | Pipeline supporting and hanging structure | |
CN113418057A (en) | Shock-proof support with joint ball bearing as joint | |
CN201473173U (en) | Articulated type connection device for large funnel single-slice hoisting | |
CN208346654U (en) | A kind of Hanging Basket for the construction of T-type beam | |
CN205973671U (en) | Hanging flower basket linkage | |
CN203960367U (en) | Leaf spring electrophoresis Special hanger | |
CN206667784U (en) | The erecting device of glass curtain wall outer visor | |
CN205576748U (en) | Hang basket self -balancing left -hand thread wheel structure | |
CN205276601U (en) | Horizontal frame of preventing toppling | |
CN205243143U (en) | Hard support with adjustable | |
CN217897366U (en) | Steel beam lower hanging type safety net hanging device capable of being repeatedly used | |
CN205802756U (en) | Rolling mill smoothing roll roller sheet dismounting special hanger | |
CN108545588A (en) | Camber beam suspender | |
CN205206752U (en) | Outer suspension type derrick base of workover rig |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140101 Termination date: 20160711 |
|
CF01 | Termination of patent right due to non-payment of annual fee |