Prior art keywords
flange
panel
underwater
facility
connect
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320337328.3U
Other languages
Chinese (zh)
Inventor
周声结
汪建明
井元彬
祁嘉朋
戚蒿
王文龙
梁思颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC China Ltd Zhanjiang Branch filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201320337328.3U priority Critical patent/CN203371246U/en
Application granted granted Critical
Publication of CN203371246U publication Critical patent/CN203371246U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model discloses a tool for underwater flange connection. The tool is provided with two flange clamping components in same structure and a guide seat. Each flange clamping component mainly comprises a panel holder and a panel arranged on the panel holder; the panel holder is provided with a clamping groove, and the panel is provided with a hydraulic draw bar clamping groove. The guide seat is provided with a flange guide groove, and two flanges to be connected are arranged in the flange guide groove of the guide seat. Positioning pins for being inserted into flange mounting holes are arranged in the side wall, facing one flange surface, in the clamping groove of the panel holder. By the aid of the tool of the structure, flange connection is facilitated greatly, and convenience in operation is achieved. As the two flanges to be connected are arranged in the flange guide groove of the guide seat, the two flange clamping components in the same structure are assembled on the two flanges, and the two flanges are pulled to be closer by the hydraulic draw bar and then connected, underwater flange connection efficiency is improved and underwater flange connection load of divers is reduced.

Description

A kind of facility that connect for underwater flange
Technical field
The utility model relates to the special tooling of a kind of offshore oil or natural gas extraction equipment, specifically a kind of facility of connection under water of submerged pipeline flange.
Background technology
Oil or the natural gas of drilling and producing platform exploitation are transported in submerged pipeline by the platform standpipe, then are transported to the FPSO(floating production storage unit) or land terminal.Between each of platform section standpipe, between standpipe and seabed expansion bends and between expansion bends and the flat pipe in seabed, all by flange, be connected.The shallow water submarine pipeline of the depth of water 300 m left and right is manipulate directly or using the underwater sealing cabin as working space enforcement connection by the diver mostly.
When the diver carries out the flange connection under water, be to utilize manpower or adjust the flange position by chain block, the end face of flange that furthers, the center line of manual synchronizing abutted flange, then complete the flange connection after tightening some bolts.The method time and effort consuming, operating efficiency is very low.Due to the underwater operation personnel and the time diver underwater operation limited time, in the urgent need to a kind of method of attachment under water efficiently.
Through patent retrieval, do not find identical with the utility model or close or similarly connect facility under water.
Summary of the invention
In order to improve flange joint efficiency under water, alleviate diver's flange and connect working load under water, the invention provides a kind of facility that connect for underwater flange, can realize that by these facility flange efficiently connects under water.
The technical solution of the utility model is as follows: a kind of facility that connect for underwater flange, it is to clamp part and a guide holder forms by two identical flanges of structure, described flange clamps part and mainly consists of the panel bed with draw-in groove and the panel that is located on panel bed, described panel is provided with the hydraulic pressure draw-bar draw-in groove, described guide holder is provided with the flange gathering sill, and the flange of two needs connections is located in the flange gathering sill of guide holder.
In described panel bed draw-in groove with flange face over against sidewall be provided with to insert the alignment pin of flange mounting hole.
Described alignment pin is provided with two.
An on described guide holder and end that is positioned at gathering sill is provided with baffle plate, and the surface of described baffle plate is provided with to insert the pin of flange mounting hole.
Described pin is provided with two.
Described panel bed is provided with the panel stiffener vertical with panel.
Described panel stiffener is provided with two, and two panel stiffeners are parallel to each other.
The beneficial effects of the utility model: owing to adopting above-mentioned version, greatly facilitate the connection of flange, and easy and simple to handle, the flange that two needs are connected is located in the flange gathering sill of guide holder, again two identical flanges of structure are clamped to part and be installed on two flanges, utilize hydraulic pressure draw-bar that two flanges are furthered, and connected, improved flange joint efficiency under water, alleviated diver's flange and connected working load under water.
The accompanying drawing explanation
Fig. 1 is the facility schematic diagram connected for underwater flange.
In figure: 1, flange clamps part; 2, guide holder; 3, draw-in groove; 4, panel bed; 5, panel; 6, hydraulic pressure draw-bar draw-in groove; 7, flange gathering sill; 8, flange; 9, alignment pin; 10, baffle plate; 11, pin; 12, panel stiffener.
The specific embodiment
As shown in Figure 1, a kind of facility that connect for underwater flange, it is to clamp part 1(because structure is identical by two identical flanges of structure, only shown in figure that a flange clamps part and a flange) and guide holder 2 formations, described flange clamps part 1 and mainly consists of the panel bed 4 with draw-in groove 3 and the panel 5 that is located on panel bed 4, described panel 5 is provided with hydraulic pressure draw-bar draw-in groove 6, the flange 8 that described guide holder 2 is provided with 7, two needs connections of flange gathering sill is located in the flange gathering sill 7 of guide holder.In described panel bed draw-in groove 3 with 8 of flanges over against sidewall be provided with to insert the alignment pin 9 of flange mounting hole.Described alignment pin 9 is provided with two.
On described guide holder 2 an and end that is positioned at gathering sill 7 is provided with baffle plate 10, and the surface of described baffle plate 10 is provided with to insert the pin 11 of flange mounting hole.Described pin 11 is provided with two.
Described panel bed 4 is provided with the panel stiffener 12 vertical with panel 5.Described panel stiffener 12 is provided with two, and two panel stiffeners 12 are parallel to each other.
The utility model carries out blanking according to the facility design drawing connected for underwater flange, and carries out process and assemble; During use, at first, the diver clamps flange respectively part 1 by the left and right panel by alignment pin 9 under water and is installed on ring flange top, left and right; Secondly, the flange 8 that the diver connects two needs under water is located in the flange gathering sill 7 of guide holder; Then, the hydraulic pressure draw-bar draw-in groove by panel top, left and right furthers the left and right ring flange until basic laminating with hydraulic pressure draw-bar; Inserting bolt also tightens, and completes flange and connects.
Enforcement recited above is only that the utility model example embodiment is described; not design of the present utility model and scope are limited; do not breaking away under the utility model design prerequisite; the equivalent structure that in this area, common engineers and technicians make the technical solution of the utility model and directly or indirectly be used in relevant technical field, all should fall into protection domain of the present utility model.

Claims (7)

1. facility that connect for underwater flange, it is characterized in that: it is to clamp part and a guide holder forms by two identical flanges of structure, described flange clamps part and mainly consists of the panel bed with draw-in groove and the panel that is located on panel bed, described panel is provided with the hydraulic pressure draw-bar draw-in groove, described guide holder is provided with the flange gathering sill, and the flange of two needs connections is located in the flange gathering sill of guide holder.
2. facility that connect for underwater flange according to claim 1 is characterized in that: in described panel bed draw-in groove with flange face over against sidewall be provided with to insert the alignment pin of flange mounting hole.
3. facility that connect for underwater flange according to claim 2, it is characterized in that: described alignment pin is provided with two.
4. according to the described facility that connect for underwater flange of claim 1-3 any one, it is characterized in that: on a described guide holder and end that is positioned at gathering sill is provided with baffle plate, and the surface of described baffle plate is provided with to insert the pin of flange mounting hole.
5. facility that connect for underwater flange according to claim 4, it is characterized in that: described pin is provided with two.
6. facility that connect for underwater flange according to claim 5, it is characterized in that: described panel bed is provided with the panel stiffener vertical with panel.
7. facility that connect for underwater flange according to claim 6, it is characterized in that: described panel stiffener is provided with two, and two panel stiffeners are parallel to each other.
CN201320337328.3U 2013-06-13 2013-06-13 Tool for underwater flange connection Expired - Fee Related CN203371246U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320337328.3U CN203371246U (en) 2013-06-13 2013-06-13 Tool for underwater flange connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320337328.3U CN203371246U (en) 2013-06-13 2013-06-13 Tool for underwater flange connection

Publications (1)

Publication Number Publication Date
CN203371246U true CN203371246U (en) 2014-01-01

Family

ID=49833802

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320337328.3U Expired - Fee Related CN203371246U (en) 2013-06-13 2013-06-13 Tool for underwater flange connection

Country Status (1)

Country Link
CN (1) CN203371246U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104589278A (en) * 2014-12-31 2015-05-06 中交一航局第二工程有限公司 Quick mounting limiting device for pipeline flange
CN105382745A (en) * 2015-12-11 2016-03-09 中国电子科技集团公司第四十一研究所 Precise assembling method and clamp for terahertz waveguide flange pins
CN107989202A (en) * 2017-12-20 2018-05-04 潮峰钢构集团有限公司 A kind of elastic plastic experiment and its operating method using steel construction
CN111356927A (en) * 2018-03-16 2020-06-30 株式会社日立高新技术 Automatic analysis device and analysis method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104589278A (en) * 2014-12-31 2015-05-06 中交一航局第二工程有限公司 Quick mounting limiting device for pipeline flange
CN104589278B (en) * 2014-12-31 2017-01-11 中交一航局第二工程有限公司 Quick mounting limiting device for pipeline flange
CN105382745A (en) * 2015-12-11 2016-03-09 中国电子科技集团公司第四十一研究所 Precise assembling method and clamp for terahertz waveguide flange pins
CN105382745B (en) * 2015-12-11 2017-05-03 中国电子科技集团公司第四十一研究所 Precise assembling method and clamp for terahertz waveguide flange pins
CN107989202A (en) * 2017-12-20 2018-05-04 潮峰钢构集团有限公司 A kind of elastic plastic experiment and its operating method using steel construction
CN111356927A (en) * 2018-03-16 2020-06-30 株式会社日立高新技术 Automatic analysis device and analysis method
CN111356927B (en) * 2018-03-16 2024-04-19 株式会社日立高新技术 Automatic analysis device and analysis method

Similar Documents

Publication Publication Date Title
CN203371246U (en) Tool for underwater flange connection
CN209325105U (en) Unidirectional valve group for subsea control modules
CN105235838B (en) Gear driving type butt-joint locking mechanism of underwater control module
CN103510896A (en) Installing tool for horizontal sleeve type connector for deep water manifold
CN103423530B (en) Mechanical locking submarine pipeline connector
CN106703761B (en) Hydrocarbon production system and its working method in dry type water
CN201318131Y (en) Fully automatic quick connector for offshore oil drilling riser
CN202327425U (en) Connector device for pipeline connection
CN202646986U (en) Air pipe connecting device
CN116792581A (en) Underwater connector system and use method thereof
CN103697009A (en) Hydraulic jumper and testing and installing methods thereof
CN205203312U (en) Locking mechanism is docked to control module's gear drive formula under water
CN108426109A (en) Quick Connect Kit for underwater flange interface
CN205445555U (en) A underwater drilling underplate for TLP
CN219140122U (en) Underwater connector system
CN216240535U (en) Outer wrapping type sealing and pressing device suitable for ROV
CN208628485U (en) A kind of submarine pipeline hydraulic drilling machine
CN203115296U (en) Arresting device of ultra-deep-water drilling ship high-pressure mud pipe
CN212634515U (en) Sea pipe cutting device and control panel for cutting saw
CN208033782U (en) Multitube cutter device
CN105114025A (en) Connector for undersea Christmas tree
CN106001703A (en) Drilling positioning device
CN101832425B (en) Installation method of underwater tee joint of seabed pipeline
CN208237269U (en) Vertical clip Quick Connect Kit for underwater pigging operation
CN104966938A (en) Electro-hydraulic combination type underwater control system butt joint device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: CNOOC (China) Limited Zhanjiang Branch

Patentee after: China Offshore Oil Group Co., Ltd.

Address before: 100010 China oil tower, 25 Chaoyangmen North Street, Dongcheng District, Beijing

Co-patentee before: CNOOC (China) Limited Zhanjiang Branch

Patentee before: China National Offshore Oil Corporation

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140101

Termination date: 20200613

CF01 Termination of patent right due to non-payment of annual fee