CN203360954U - Cast-in-place concrete metering device of double-block type ballastless track - Google Patents

Cast-in-place concrete metering device of double-block type ballastless track Download PDF

Info

Publication number
CN203360954U
CN203360954U CN 201320404636 CN201320404636U CN203360954U CN 203360954 U CN203360954 U CN 203360954U CN 201320404636 CN201320404636 CN 201320404636 CN 201320404636 U CN201320404636 U CN 201320404636U CN 203360954 U CN203360954 U CN 203360954U
Authority
CN
China
Prior art keywords
cast
metering device
double
place concrete
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320404636
Other languages
Chinese (zh)
Inventor
陈赛勇
张念
宫福兴
康广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Second Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of 17th Bureau of China's Railroad Group filed Critical Second Engineering Co Ltd of 17th Bureau of China's Railroad Group
Priority to CN 201320404636 priority Critical patent/CN203360954U/en
Application granted granted Critical
Publication of CN203360954U publication Critical patent/CN203360954U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a cast-in-place concrete metering device of a double-block type ballastless track. The cast-in-place concrete metering device is characterized by comprising a fixed outer barrel and a bin-separated metering barrel, the bin-separated metering barrel is placed in the outer barrel and can rotate around the axis of the outer barrel, the upper end of the outer barrel is an upper stop plate, the lower end of the outer barrel is a lower stop plate, the upper stop plate is provided with a feeding port connected with an outlet of a storage hopper, the lower stop plate is provided with a discharging port, and a 180-degree angle is formed between the discharging port and the feeding port; a plurality of fan-shaped bins are distributed in the bin-separated metering barrel circumferentially. When concrete is poured through the cast-in-place concrete metering device, the quantity of the concrete placed in molds at each pouring position can be controlled well, so that the purposes that labor intensity of workers is reduced, interference in construction accuracy caused by manual material equalization is reduced, the number of regulation fasteners needing to be replaced and the workload for replacing the regulation fasteners are reduced, construction efficiency is improved and building cost is lowered are achieved.

Description

Double-blocked rail without ballast cast-in-situ concrete metering device
Technical field
The utility model relates to a kind of high-speed railway slag-free rail concrete cast-in-situ construction equipment, particularly a kind of double-blocked rail without ballast railway roadbed cast-in-situ concrete metering device.
Background technology
The CRTS-I type double-blocked rail without ballast of China, to utilize tool track and double-block type sleeper to form the construction section of track, thereby utilize accurate measurement means control tool rail indirectly to determine the locus of double-block type sleeper in railway roadbed, by cast-in-place railway roadbed concrete, double-block type sleeper is permanently affixed in the steel concrete railway roadbed, the removal tool rail change the paving long rail after formation high-speed railway gapless track.
High-speed railway requires high accuracy to realize the high ride of circuit, must carry out the multinomial orbit parameters such as height, direction, gauge to tool track before fluid concrete is controlled at error in allowed band with absolute method of measurement, the cast-in-place moulding of railway roadbed and change the paving long rail after, need to utilize the method for adjusting fastener to carry out accurate adjustment improvement to circuit, eliminate various work business defects, reach the high-speed cruising standard.
But can't measure during at present due to railway roadbed cast-in-situ concrete; often enter the mould amount of concrete more or less; need the workman to stand in refining in railway roadbed; add the operation such as vibrate, floating; the pinpoint section of track is caused to disturbance, usually cause precision out of control, have to change a large amount of adjustment fasteners in the later stage; adjust by force the line track parameter, improve the state of the art of circuit.Statistics shows, adopt the double-blocked rail without ballast of pouring technology moulding in the past, later stage is adjusted the fastener turnover rate generally 30% left and right (even reaching more than 40%), cost that only change to adjust fastener is just up to 20~300,000 yuan/km, fastener is adjusted in simultaneously a large amount of replacings, give the remaining adjustment surplus of works department of being responsible for the circuit regular maintenance less, be unfavorable for the long-time maintenance of circuit.
Construction period, operating personnel's interference is the primary influence factor that causes construction precision to worsen, wherein the interference strength maximum of artificial refining.
Summary of the invention
In view of current double-blocked rail without ballast pouring concrete does not have the Scientific Measurement method, utilize artificial refining to disturb the particular problem that causes the construction precision severe exacerbation, the utility model provides a kind of cast-in-place concrete metering device of using, make concrete through entering mould by pouring position again after metering in advance, reach reduce artificial refining to the interference of construction precision, reduce labor strength, reduce to change and adjust fastener quantity and workload, improve efficiency of construction, reducing the construction costs, the purpose of reserved long-term operation work business maintenance condition.
For reaching above purpose, the utility model takes following technical scheme to be achieved:
The cast-in-place concrete metering device of using of a kind of double-blocked rail without ballast, it is characterized in that, comprise a fixed outer cylinder and an individual metering cylinder that can horizontally rotate around the urceolus axle center be placed in this outer barrel, this urceolus upper end is upper striker plate, lower end is lower striker plate, upper striker plate is provided with charging aperture and is connected with the outlet of storage bin hopper, and lower striker plate is provided with discharging opening, and discharging opening and charging aperture differ 180 °; Be provided with circumferentially uniform a plurality of fan-shaped storehouse lattice with minute storehouse dividing plate in described individual metering cylinder.
In such scheme, the outer wall of described individual metering cylinder and a minute storehouse dividing plate are linked to be integral body, can prevent that minute storehouse dividing plate is deformed by the concrete resistance and affects the accuracy of metering.Described fan-shaped storehouse lattice are 4, and each storehouse lattice cross section is 1/4 circle.90 ° of every intermittent rotaries of individual metering cylinder realize that cloth enters mould 1 time.Described upper striker plate is provided with air vent.Described each lattice bottom, storehouse is respectively arranged with a minute storehouse sliding plate.
CRTS-I type double-blocked rail without ballast is one of primary structure form of high-speed railway slag-free rail, expansion along with national high ferro building size, adopt the engineering of CRTS-I type double-blocked rail without ballast to get more and more, but technical level still rests on the aspect of a large amount of manual work, in the interference short time due to constructor's operation self generation, can't thoroughly eliminate, implement the fluid concrete operation so adopt the utility model metering device, can control preferably that each pouring position is concrete enters modulus, reduce the workman and stand in the interference of refining operation generation in railway roadbed and the time of consumption, for improving the double-blocked rail without ballast construction precision, create favorable conditions, also for more economical applying of CRTS-I type double-blocked rail without ballast, open up more broad space simultaneously.
The accompanying drawing explanation
Below in conjunction with the drawings and the specific embodiments, the utility model is described in further detail.
Fig. 1 is the utility model apparatus structure schematic diagram.
The horizontal profile schematic diagram that Fig. 2 is individual metering cylinder in Fig. 1.
In Fig. 1-Fig. 2: 1. individual metering cylinder; 2. divide the storehouse dividing plate; 3. turning cylinder; 4. descend axle bed; 5. go up axle bed; 6. power wheel; 7. storage bin hopper; 8. go up striker plate; 9. charging aperture; 10. descend striker plate; 11. discharging opening; 12. air vent; 13, divide the storehouse sliding plate.
The specific embodiment
Referring to Fig. 1, Fig. 2, the cast-in-place concrete metering device of using of a kind of double-blocked rail without ballast, mainly be comprised of storage bin hopper 7, individual metering cylinder 1, charging aperture 9, discharging opening 11, upper and lower striker plate 8,10 etc.First of large diameter steel pipe, make the annular outer wall of individual metering cylinder 1, be welded together to form and there is the rotating individual metering cylinder 1 of certain rigidity with this outer wall and turning cylinder 3 respectively as minute storehouse dividing plate 2 with steel plate, wherein have along circumferential uniform four the 1/4 round storehouse lattice (Fig. 2) of annular outer wall; Each lattice bottom, storehouse arranges respectively one minute storehouse sliding plate 13.Make and be with bevelled storage bin hopper 7 with steel plate, with steel plate, make respectively on circle, lower striker plate 8, 10, offer charging aperture 9 and air vent 12 on upper striker plate 8, offer discharging opening 11 on lower striker plate 10, upper striker plate 8 and lower striker plate 10 are welded on respectively to slightly larger in diameter (discharging opening and charging aperture differ 180 °) on another large diameter steel pipe of individual metering cylinder 1 annular outer wall, upper, lower striker plate 8, 10 centre-drilling holes pass turning cylinder 3, turning cylinder 3 is passed through to upper and lower axle bed 5, 4 are fixed on lower striker plate 10 and storage bin hopper 7, in turning cylinder 3 bottoms, power wheel 6 is installed.
The know-why of this metering device is:
1. utilize individual metering cylinder 1 accurate measurement concrete demand, and utilize the outer wall of individual metering cylinder and a minute storehouse dividing plate to form integral body, prevent that minute storehouse dividing plate from deforming and affecting metering accuracy under the concrete drag effect;
2. utilizing power wheel 6 to drive the horizontal batch (-type) of individual metering cylinder rotates;
3. utilize fixedly charging aperture 9 on upper striker plate 8 to feed supplement in the individual metering cylinder;
4. the fixedly discharging opening 11 under utilizing on striker plate 10 is to the pouring position cloth;
5. utilize the concrete storage level in storage bin hopper 7, meet the continuity of pouring practice;
6. utilize air vent 12 that individual metering cylinder inner concrete surface and atmosphere are connected, overcome the impact of negative pressure on blanking.
During fluid concrete, add concrete in storage bin hopper, starting motor rotates individual metering cylinder 1 low speed batch (-type), concrete in storage bin hopper is filled one of them storehouse lattice of individual metering cylinder under the effect of gravity, realize metering to fill concrete in the measuring chute lattice, when the individual metering cylinder rotates, continue to the lattice material filling of next storehouse, the batch (-type) by the individual metering cylinder rotates to be realized to material filling successively in different storehouse lattice; Be subject to stopping that the concrete of metering in minute storehouse is unlikely and being thrown out of of striker plate in rotation process; Under the backwater effect of lower striker plate, the unlikely downward leakage of concrete in the lattice of storehouse; When the storehouse lattice turn to the discharging opening position, leak into mould under concrete is automatic under Action of Gravity Field, in storehouse lattice bottom, sliding plate can impel concrete to enter smoothly mould, eliminate the accuracy of dead angle, bottom residual concrete impact metering, the air filled into by air vent, the blanking resistance formed for overcoming the too fast suction function of concrete discharging; Under rotary action, the hole capital after selling all securities lattice after discharge are got back to successively the storage bin hopper below and are again connected material.This metering device can coordinate the step-by-step movement casting equipment and, by the program control batch (-type) metering cloth of realizing, also can measure cloth for controlling for realization on simple and easy apparatus for pouring by the people.
Because the utility model purpose is the metering of double-blocked rail without ballast pouring concrete, so adopted the design of hopper fixed volume, when changing occasion, can change hopper and corresponding corollary apparatus the design of into more piece combined type when metered volume, facilitate the adjustment of metered capacity.

Claims (5)

1. the cast-in-place concrete metering device of using of double-blocked rail without ballast, it is characterized in that, comprise a fixed outer cylinder and an individual metering cylinder that can rotate around the urceolus axle center be placed in this outer barrel, this urceolus upper end is upper striker plate, lower end is lower striker plate, upper striker plate is provided with charging aperture and is connected with the outlet of storage bin hopper, and lower striker plate is provided with discharging opening, and discharging opening and charging aperture differ 180 °; Be provided with circumferentially uniform a plurality of fan-shaped storehouse lattice with minute storehouse dividing plate in described individual metering cylinder.
2. the cast-in-place concrete metering device of using of double-blocked rail without ballast as claimed in claim 1, is characterized in that, the outer wall of described individual metering cylinder is linked to be integral body with a minute storehouse dividing plate.
3. the cast-in-place concrete metering device of using of double-blocked rail without ballast as claimed in claim 1 or 2, is characterized in that, described fan-shaped storehouse lattice are 4, and each storehouse lattice cross section is 1/4 circle.
4. the cast-in-place concrete metering device of using of double-blocked rail without ballast as claimed in claim 1, is characterized in that, described upper striker plate is provided with air vent.
5. the cast-in-place concrete metering device of using of double-blocked rail without ballast as claimed in claim 1, is characterized in that, described each lattice bottom, storehouse is respectively arranged with a minute storehouse sliding plate.
CN 201320404636 2013-07-08 2013-07-08 Cast-in-place concrete metering device of double-block type ballastless track Expired - Fee Related CN203360954U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320404636 CN203360954U (en) 2013-07-08 2013-07-08 Cast-in-place concrete metering device of double-block type ballastless track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320404636 CN203360954U (en) 2013-07-08 2013-07-08 Cast-in-place concrete metering device of double-block type ballastless track

Publications (1)

Publication Number Publication Date
CN203360954U true CN203360954U (en) 2013-12-25

Family

ID=49808742

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320404636 Expired - Fee Related CN203360954U (en) 2013-07-08 2013-07-08 Cast-in-place concrete metering device of double-block type ballastless track

Country Status (1)

Country Link
CN (1) CN203360954U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103362043A (en) * 2013-07-08 2013-10-23 中铁十七局集团第二工程有限公司 Device for metering cast-in-place concrete of double-block ballastless track
CN106149485A (en) * 2016-07-14 2016-11-23 安庆里外里工业产品设计有限公司 A kind of railroad rail immobilizing foundation builds intelligent robot
CN106192609A (en) * 2016-07-14 2016-12-07 安庆里外里工业产品设计有限公司 A kind of railroad rail immobilizing foundation builds intelligent robot vibration mixing device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103362043A (en) * 2013-07-08 2013-10-23 中铁十七局集团第二工程有限公司 Device for metering cast-in-place concrete of double-block ballastless track
CN103362043B (en) * 2013-07-08 2015-09-02 中铁十七局集团第二工程有限公司 Double-blocked rail without ballast cast-in-situ concrete metering device
CN106149485A (en) * 2016-07-14 2016-11-23 安庆里外里工业产品设计有限公司 A kind of railroad rail immobilizing foundation builds intelligent robot
CN106192609A (en) * 2016-07-14 2016-12-07 安庆里外里工业产品设计有限公司 A kind of railroad rail immobilizing foundation builds intelligent robot vibration mixing device
CN106192609B (en) * 2016-07-14 2017-11-24 黄志勇 A kind of railroad rail immobilizing foundation builds intelligent robot vibration mixing device

Similar Documents

Publication Publication Date Title
CN203360954U (en) Cast-in-place concrete metering device of double-block type ballastless track
CN109955356B (en) High-precision pre-vibrating pipe pile efficient material distribution system and material distribution method thereof
CN109014084B (en) Sand casting is with molding sand surface spraying casting coating equipment
CN103362043B (en) Double-blocked rail without ballast cast-in-situ concrete metering device
CN107934504A (en) A kind of ultrasonic activation sieves quantitative feeding device
CN201255577Y (en) Ore laying device
CN102689350B (en) Automatic forming machine of building blocks fast quantification feed distribution device
CN202136957U (en) Storage bucket conveying table device of small powder batching system
CN109648682B (en) Concrete 3D printing equipment and method for processing PC (polycarbonate) component
CN202625911U (en) High-accuracy lime adding device
CN105173141A (en) Accurate powder filling device and method
CN205087170U (en) Accurate device that fills of powder
CN206009828U (en) A kind of automatic powder loading mechanism of super large-scale molybdenum plate blank
CN201317597Y (en) Material distributing equipment
CN209937174U (en) A concrete 3D printing apparatus for processing PC component
CN201239971Y (en) Lost foam riser cutter
CN209145026U (en) Cast-in fixing bolt control tool
CN203805141U (en) Automatic batching system for foam concrete
CN207209468U (en) A kind of quick system of putting in storage of big discrepancy in elevation grinding coagulation soil for preventing aggregate separated
CN206014693U (en) A kind of ball material feed device for producing glass fibre
CN203846783U (en) Divider cone for concrete placement
CN216707874U (en) Concrete distributing device
CN216509430U (en) Anti-precipitation filling device for producing anticorrosive heat-insulation coil steel coating
CN216031491U (en) Quantifiable stemming extruding device
CN203236583U (en) Automatic mortar distributor for prefabricating interlocking blocks

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131225

Termination date: 20170708