CN203350160U - 透水混凝土透水系数测定仪 - Google Patents
透水混凝土透水系数测定仪 Download PDFInfo
- Publication number
- CN203350160U CN203350160U CN 201320425033 CN201320425033U CN203350160U CN 203350160 U CN203350160 U CN 203350160U CN 201320425033 CN201320425033 CN 201320425033 CN 201320425033 U CN201320425033 U CN 201320425033U CN 203350160 U CN203350160 U CN 203350160U
- Authority
- CN
- China
- Prior art keywords
- water
- coefficient
- tank
- pump
- overflow tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Sampling And Sample Adjustment (AREA)
Abstract
一种透水混凝土透水系数测定仪,它是在测定仪主体内分别装设有透水系数测定机构、供水机构、真空试验机构;透水系数测定机构包括水圆筒、溢流水槽、水箱、水计量器,供水机构包括吸水泵、给水泵,溢流水槽为2-6个并列的溢流水槽;真空试验机构包括抽气泵和抽空桶,抽空桶为2-6个并列的抽空桶又分别装连有抽气管连接着抽气泵。本实用新型结构简单、实用,适用于透水混凝土的透水系数测定。
Description
技术领域
本实用新型涉及一种对透水混凝土的透水系数进行测定的仪器。
背景技术
随着公路、市政工程等所用透水混凝土的不断发展,对透水混凝土的透水系数越来越引起关注,因为它直接关系到透水混凝土的质量,由此也引发对透水混凝土用透水系数测定仪的技术要求也越来越高。在公知技术中,透水系数测定仪器主要供水部分和测定部分组成的,但受其构造所限,在实际应用中,一次仅进行单块混凝土试件透水系数的测定,工作效率低,若一次进行3块混凝土试件透水系数的测定,就需要多台测定仪器共用,造成整体结构繁复,操作繁琐,且透水系数误差范围大,给使用带来不便。
实用新型内容
为了克服现有技术的不足,本实用新型提供一种整体结构简单、实用,操作简便,测定精确的透水混凝土用透水系数测定仪。
本实用新型解决上述问题所采用的技术方案是:
一种透水混凝土用透水系数测定仪,它设有:透水系数测定仪主体、供水系统、透水系数测定系统、真空试验系统,透水系数测定仪主体内分别装设有透水系数测定系统、供水系统系统、真空试验系统,透水系数测定系统包括水圆筒、溢流水槽、吸水泵、水计量器、水箱,供水系统包括给水泵、水箱,溢流水槽为3个并列的溢流水槽,溢流水槽内装设水圆筒,溢流水槽的侧体上装连有吸水管连接于吸水泵入口,吸水泵的出口管经连接水计量器后连通到水箱,在溢流水槽的底部还装有回水管连接水箱,水箱上装有给水泵,给水泵的给水管分别连接到水圆筒上,真空试验系统包括抽气泵和抽空桶,抽空桶为3个并列的抽空桶又分别装连有抽气管连接着抽气泵。
上述透水混凝土透水系数测定仪,所述水圆筒包括:水圆筒主体、水圆筒座,水圆筒座的周壁制有数个出水孔,水圆座的上接口为凹槽接口配合连接水圆筒主体的底筒口,并在水圆筒主体和水圆筒座上垫有胶圈并制有相互配合连接的法兰盘。
本实用新型有效地解决了现有的透水混凝土用透水系数测定仪存在的问题,经过试验表明,它具有整体结构简单实用,操作简单,工作效率高,所测定的透水系数精确,使用方便等优点,适用于各种透水混凝土的透水系数测定。
附图说明
下面结合附图和实施例对本实用新型作进一步详细描述。
图1是本实用新型实施例的立体结构示意图。
图2供水系统、透水系数测定系统的结构示意图。
图3是真空试验系统的结构示意图。
图4是水圆筒6的放大结构示意图
附图中各标号为:1透水系数测定仪主体;2抽气泵;3抽气管;4抽空桶;5给水管;6水圆筒;6-1水圆筒主体;6-2水圆筒座;7溢流水槽;8吸水管;9水箱;10水计量器; 11吸水泵;12给水泵;13给水管;14回水管;15透水混凝土试块。
具体实施方式
如附图1-3所示实施例,本实用新型设有:透水系数测定仪主体、供水系统、透水系数测定系统和真空试验系统,透水系数测定仪主体1内分别装设有透水系数测定系统、供水系统、真空试验系统,透水系数测定系统包括:水圆筒6、溢流水槽7、吸水泵12、水箱8、水计量器10,供水系统包括水箱8、给水泵13,溢流水槽7为3个并列的溢流水槽,溢流水槽7内装设水圆筒6,溢流水槽7的侧体上装连有吸水管连接于吸水泵12入口,吸水泵12的出口管经连接水计量器后连通到水箱,在溢流水槽7的底部还装有回水管连接水箱,水箱上装有给水泵,给水泵的给水管分别连接到水圆筒6上,真空试验系统包括:抽气泵2和抽空桶4,抽空桶4为3个并列的抽空桶又分别装连有抽气管连接着抽气泵2。
参见附图2、图4例,本实用新型的水圆筒6包括:水圆筒主体6-1、水圆筒座6-2,水圆筒座6-2的周壁制有数个出水孔,水圆座6-2的上接口为凹槽接口配合连接水圆筒主体6-1的底筒口,并在水圆筒主体6-1和水圆筒座6-2上垫有胶圈并制有相互配合连接的法兰盘。
本实用新型使用时,按如下步骤进行:
1、试验准备:
将透水混凝土试件与水圆筒下半部用密封胶等密封材料密封好,透水混凝土试件固化后待用;
2、真空试验:
将固化好的透水混凝土试件放入真空试验系统的抽空桶,向抽空桶内加水至高出试块100mm后,将抽空桶封闭,打开抽气泵,使得抽空桶内压力达到-90KPa,保持30分钟后,仪器自动停止并通气,在常压下,透水混凝土试件继续在水内浸泡20分钟;
3、透水系数试验:
将装有经浸水后透水混凝土试件的水圆筒组装好,放入溢流水槽,水圆筒连接好给水泵的给水管,使溢流水槽与水圆筒的水位差附图中H保持在150mm,持续5分钟后,由水计量器记录下透水量即可。
Claims (2)
1.一种透水混凝土透水系数测定仪,它包括透水系数测定仪主体,其特征在于,它还设有真空试验系统,透水系数测定仪主体内分别装设有透水系数测定系统、供水系统、真空试验系统,透水系数测定系统包括水圆筒(6)、溢流水槽(7)、水箱(8)、水计量器(10),供水系统包括吸水泵(12)、给水泵(13),溢流水槽(7)为2-6个并列的溢流水槽,溢流水槽(7)内装设水圆筒(6),溢流水槽(7)的侧体上装连有吸水管连接于吸水泵(12)入口,吸水泵(12)的出口管经连接水计量器后连通到水箱,在溢流水槽(7)的侧体和底部还装有回水管连接水箱,水箱上装有给水泵,给水泵的给水管分别连接到水圆筒(6)上,真空试验系统包括抽气泵(2)和抽空桶(4),抽空桶(4)为2-6个并列的抽空桶又分别装连有抽气管连接着抽气泵(2)。
2.根据权利要求1所述的透水混凝土透水系数测定仪,其特征在于,水圆筒(6)包括水圆筒主体(6-1)、水圆筒座(6-2),水圆筒座(6-2)的周壁制有数个出水孔,水圆座(6-2)的上接口为凹槽接口配合连接水圆筒主体(6-1)的底筒口,并在水圆筒主体(6-1)和水圆筒座(6-2)上制有相互配合连接的法兰盘。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320425033 CN203350160U (zh) | 2013-07-17 | 2013-07-17 | 透水混凝土透水系数测定仪 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320425033 CN203350160U (zh) | 2013-07-17 | 2013-07-17 | 透水混凝土透水系数测定仪 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203350160U true CN203350160U (zh) | 2013-12-18 |
Family
ID=49750044
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320425033 Expired - Fee Related CN203350160U (zh) | 2013-07-17 | 2013-07-17 | 透水混凝土透水系数测定仪 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203350160U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104075975A (zh) * | 2014-07-22 | 2014-10-01 | 山东省建筑科学研究院 | 一种检测防水材料的不透水仪 |
CN107860699A (zh) * | 2017-12-08 | 2018-03-30 | 咸阳陶瓷研究设计院有限公司 | 透水系数测量仪 |
CN111595748A (zh) * | 2020-05-20 | 2020-08-28 | 武汉大学 | 一种混凝土透水系数的自动测试装置及测试方法 |
-
2013
- 2013-07-17 CN CN 201320425033 patent/CN203350160U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104075975A (zh) * | 2014-07-22 | 2014-10-01 | 山东省建筑科学研究院 | 一种检测防水材料的不透水仪 |
CN107860699A (zh) * | 2017-12-08 | 2018-03-30 | 咸阳陶瓷研究设计院有限公司 | 透水系数测量仪 |
CN107860699B (zh) * | 2017-12-08 | 2024-01-05 | 咸阳陶瓷研究设计院有限公司 | 透水系数测量仪 |
CN111595748A (zh) * | 2020-05-20 | 2020-08-28 | 武汉大学 | 一种混凝土透水系数的自动测试装置及测试方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201732048U (zh) | 多孔混凝土透水性能测定仪 | |
CN203732408U (zh) | 透水混凝土透水系数的测试装置 | |
CN105203443A (zh) | 用于透水沥青混凝土车辙板试件的渗透系数测定装置及其测试方法 | |
CN203350160U (zh) | 透水混凝土透水系数测定仪 | |
CN108982327A (zh) | 一种损伤混凝土渗透性检测装置 | |
CN204044142U (zh) | 一种应用于水质监测远程质控系统的管路结构 | |
CN102980637B (zh) | 一种液位传感器液位标定检测装置及方法 | |
CN210604037U (zh) | 一种环境检测取样器 | |
CN205120540U (zh) | 用于透水沥青混凝土车辙板试件的渗透系数测定装置 | |
CN107121177B (zh) | 明渠与管道污水流量一体化标准装置 | |
CN206710263U (zh) | 一种研究土的渗透性的试验仪 | |
CN211856278U (zh) | 一种混凝土渗水渗气性测量装置 | |
CN102175506B (zh) | 一种用于在线水质分析的稀释装置 | |
CN201014973Y (zh) | 双路大气采样装置 | |
CN206772395U (zh) | 标准表自检型大口径水流量标准装置 | |
CN203732328U (zh) | 一种自负压管道中抽取气体样本的取样装置 | |
CN202382949U (zh) | 一种排水系统测试仪器 | |
CN202614297U (zh) | 一种组合式汽车油耗计量仪 | |
CN103852351B (zh) | 一种自负压管道中抽取气体样本的取样装置及取样方法 | |
CN200940469Y (zh) | 分采分输井口流程管网 | |
CN202832490U (zh) | 称重式分离器标定装置 | |
CN217443123U (zh) | 一种透水混泥土透水系数检测装置 | |
CN216870310U (zh) | 一种混凝土透水系数的检测设备 | |
CN203518975U (zh) | 真空助力器主缸总成输出位移的测量装置 | |
CN103837391B (zh) | 水质监测水样预处理装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180814 Address after: 061001 Beijing Road, Cangzhou, Hebei Province, No. 33, cangxing headquarters Patentee after: CANGXING TECHNOLOGY GROUP CO.,LTD. Address before: 061026 No. 8, Shan Hu Zhuang Industrial Zone, Zhifang tou Township, Cangxian, Cangzhou, Hebei. Patentee before: CANGXING GROUP NEW BUILDING MATERIALS TECHNOLOGY Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131218 |