CN203335084U CN2013202996959U CN201320299695U CN203335084U CN 203335084 U CN203335084 U CN 203335084U CN 2013202996959 U CN2013202996959 U CN 2013202996959U CN 201320299695 U CN201320299695 U CN 201320299695U CN 203335084 U CN203335084 U CN 203335084U
Authority
CN
China
Prior art keywords
dish
hanging scaffold
lower floor
upper strata
disc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013202996959U
Other languages
Chinese (zh)
Inventor
李飞
李艮桥
米培英
杜蒙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal No 1 Construction Co Ltd
Original Assignee
China Coal No 1 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal No 1 Construction Co Ltd filed Critical China Coal No 1 Construction Co Ltd
Priority to CN2013202996959U priority Critical patent/CN203335084U/en
Application granted granted Critical
Publication of CN203335084U publication Critical patent/CN203335084U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a temporary hanging scaffold for a vertical shaft. The temporary hanging scaffold comprises a hanging scaffold device, a disc stabilizing device and a suspension device (5). The hanging scaffold device is a double disc device and is divided into an upper layer disc (4) and a lower layer disc (1), the upper layer disc (4) and the lower layer disc (1) are connected through three columns (3), the upper layer disc (4) is a protection disc, the lower layer disc (1) is a working disc, and the upper layer disc (4) and the lower layer disc (1) are both provided with air duct passing openings and openings for cables to pass through. Compared with the prior art, the temporary hanging scaffold not only is simple in structure, convenient to maintain, economical, durable, high in applicability, simple and convenient to install and dismantle and reusable, but also is safe and reliable.

Description

The interim hanging scaffold of vertical
Technical field
The utility model relates to a kind of hoisting disk device, especially a kind of interim interim hanging scaffold of shaft construction that is applied in.
Background technology
At present, in the shaft construction process, employing be the interim hanging scaffold of one deck.This hanging scaffold structural safety performance is low, can't guarantee the quality of construction in construction, and construction safety is also threatened, and safety problem often occurs.Therefore, designing the interim hanging scaffold of vertical that a kind of safety is good, is the current technical issues that need to address.
Summary of the invention
This practical problem to be solved is to provide the interim hanging scaffold of vertical that a kind of safety is good.
The technical scheme in the invention for solving the technical problem is:
The interim hanging scaffold of vertical; comprise hoisting disk device, surely coil device and suspension apparatus; hoisting disk device is the double plate device; divide upper strata Pan He lower floor dish; upper strata Pan He lower floor dish connects with 3 root posts; the upper strata dish is protective disc, and lower floor's dish is scratch diskette, coils in upper strata Pan He lower floor and is equipped with air duct by mouth and the special-purpose mouth that passes through of cable.
As a kind of preferred version of the present utility model, upper strata Pan He lower floor dish has steady dish device separately, and upper strata Pan He lower floor dish respectively has three covers surely to coil device.
As a kind of preferred version of the present utility model, described suspension apparatus has 4 wire rope, and 4 wire rope are separately fixed on the cylinder of 4 sinking winch.
As a kind of preferred version of the present utility model, at the edge of upper strata Pan He lower floor dish, air duct all is provided for by the mouth edge railing and the baseboard that the personnel that prevent and material fall by mouth edge and cable special use.
Compared with prior art, the utility model simple in structure, easy to maintenance, economy and durability not only; Applicability is strong, and installing/dismounting is easy, reusable, and safe and reliable.
The accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
The specific embodiment
As shown in the figure; the interim hanging scaffold of vertical; comprise hoisting disk device, surely coil device and suspension apparatus 5; hoisting disk device is the double plate device; divide upper strata dish 4 and lower floor's dish 1, upper strata dish 4 coils 1 use 3 root posts 3 with lower floor and is connected, and it is protective disc that upper strata coils 4; lower floor dish 1 be scratch diskette, on upper strata dish 4 and lower floor's dish 1, be equipped with air duct by mouthful and the special-purpose mouth that passes through of cable.
Upper strata dish 4 and lower floor's dish 1 steady dish device had separately, upper strata dish 4 and lower floor's dish 1 respectively have three covers surely to coil device.
Described suspension apparatus 5 has 4 wire rope, and 4 wire rope are separately fixed on the cylinder of 4 sinking winch.
At the edge of upper strata dish 4 and lower floor's dish 1, air duct all is provided for by the mouth edge railing and the baseboard that the personnel that prevent and material fall by mouth edge and cable special use.

Claims (4)

1. the interim hanging scaffold of vertical; comprise hoisting disk device, surely coil device and suspension apparatus (5); it is characterized in that; hoisting disk device is the double plate device; divide upper strata dish (4) and lower floor's dish (1), upper strata dish (4) is connected with 3 root posts (3) with lower floor's dish (1), and (4) are coiled on upper strata is protective disc; lower floor dish (1) be scratch diskette, on upper strata dish (4) and lower floor's dish (1), be equipped with air duct by mouthful and the cable special use pass through mouth.
2. the interim hanging scaffold of vertical according to claim 1, is characterized in that, upper strata dish (4) and lower floor's dish (1) have steady dish device separately, and upper strata dish (4) and lower floor's dish (1) respectively have three covers surely to coil device.
3. the interim hanging scaffold of vertical according to claim 1, is characterized in that, described suspension apparatus (5) has 4 wire rope, and 4 wire rope are separately fixed on the cylinder of 4 sinking winch.
4. the interim hanging scaffold of vertical according to claim 1, is characterized in that, the edge, air duct that coils (1) in upper strata dish (4) and lower floor all is provided for by the mouth edge railing and the baseboard that the personnel that prevent and material fall by mouth edge and cable special use.
CN2013202996959U 2013-05-29 2013-05-29 Temporary hanging scaffold for vertical shaft Expired - Fee Related CN203335084U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013202996959U CN203335084U (en) 2013-05-29 2013-05-29 Temporary hanging scaffold for vertical shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013202996959U CN203335084U (en) 2013-05-29 2013-05-29 Temporary hanging scaffold for vertical shaft

Publications (1)

Publication Number Publication Date
CN203335084U true CN203335084U (en) 2013-12-11

Family

ID=49703762

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013202996959U Expired - Fee Related CN203335084U (en) 2013-05-29 2013-05-29 Temporary hanging scaffold for vertical shaft

Country Status (1)

Country Link
CN (1) CN203335084U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104229631A (en) * 2014-08-27 2014-12-24 中煤第一建设有限公司 Double-wall small template hoister of vertical well

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104229631A (en) * 2014-08-27 2014-12-24 中煤第一建设有限公司 Double-wall small template hoister of vertical well
CN104229631B (en) * 2014-08-27 2016-03-16 中煤第一建设有限公司 The multiple little template gig of wall of vertical

Similar Documents

Publication Publication Date Title
CN203335084U (en) Temporary hanging scaffold for vertical shaft
CN108862014B (en) Assembled wall body hoists with steel shoulder pole structure of lifting by crane based on BIM
CN102601771B (en) Portable air-conditioning installs equipment
CN205222470U (en) Ideophone of falling L protective screen acoustic baffle installation gallows
CN202923858U (en) Scaffold for segmented edge of ship
CN203128054U (en) Gantry crane
CN203959638U (en) A kind of sintering pallet suspender
CN203632113U (en) Portable safety string bag for electric pole
CN204266607U (en) A kind of high-voltage line protective frame
CN103638617A (en) Method and device for fixing safety belt
CN202499643U (en) Special lifting head
CN204297864U (en) Machine room wire casing protector
CN202602173U (en) Overhead line supporting tower line-releasing/tightening operation platform
CN205677259U (en) The overall lifting bracket of a kind of Novel net frame
CN206395759U (en) One kind rotation clamp crane rope protector
CN203285076U (en) Protective device used in construction sites
CN203218838U (en) Spliced wire shaft well
CN202834556U (en) Lightening protective system for a gas pipeline
CN204999059U (en) Honey holding vessel
CN203504074U (en) Auxiliary device of pulley block
CN201671111U (en) Inspection well cover with protective net
CN202924520U (en) Rope gripper mounting channel steel
CN202831593U (en) Operating platform for anti-suspending support installation at high altitude
CN204322918U (en) Electric inspection process robot wheel
CN203054009U (en) Zinc-oxide surge arrestor test rack

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131211

Termination date: 20140529