CN203334955U - Drilling device for horizontal directional drilling penetration - Google Patents

Drilling device for horizontal directional drilling penetration Download PDF

Info

Publication number
CN203334955U
CN203334955U CN2013203160681U CN201320316068U CN203334955U CN 203334955 U CN203334955 U CN 203334955U CN 2013203160681 U CN2013203160681 U CN 2013203160681U CN 201320316068 U CN201320316068 U CN 201320316068U CN 203334955 U CN203334955 U CN 203334955U
Authority
CN
China
Prior art keywords
pipe
horizontal directional
penetration
drilling
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013203160681U
Other languages
Chinese (zh)
Inventor
陆江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
China Petroleum Pipeline Bureau Co Ltd
Original Assignee
China National Petroleum Corp
China Petroleum Pipeline Engineering Corp
China Petroleum Pipeline Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, China Petroleum Pipeline Engineering Corp, China Petroleum Pipeline Bureau Co Ltd filed Critical China National Petroleum Corp
Priority to CN2013203160681U priority Critical patent/CN203334955U/en
Application granted granted Critical
Publication of CN203334955U publication Critical patent/CN203334955U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model discloses a drilling device for horizontal directional drilling penetration. In order to improve stability of the hole wall of a drilled hole and to reduce the risk of penetration construction, the drilling device for horizontal directional drilling penetration is designed. According to the drilling device for horizontal directional drilling penetration, a main shaft, a conical breaking mechanism, a cutterhead and a traction drill rod of a horizontal directional drill are connected with the front portion of a cabin wall of the interior of a body, a cutterhead driving mechanism, a water feeding pipe and a water discharging pipe are connected with the rear portion of the cabin wall of the interior of the body, the rear end of the body is connected with a short dragging pipe section, a grouting hole is formed in the short dragging pipe section, a grouting pipe is arranged inside the short dragging pipe section, and the rear end of the short dragging pipe section is connected with a penetrating pipeline. The drilling device for horizontal directional drilling penetration is used for horizontal directional drilling penetration of a pipeline with the diameter of more than 400mm, and can carry out one-time hole broadening on the drilled hole to form the drilled hole with the hole-forming size, the pipeline can be directly dragged back to enter the drilled hole, laying is accomplished, a gap between the inner wall of the drilled hole and the penetration pipeline is filled, and drilling cuttings are discharged to the soil outlet end. The drilling device for horizontal directional drilling penetration can improve the stability of the hole wall of the drilled hole, reduce the construction risk caused by hole collapse, reduce construction cost, protect the environment, achieve large-diameter long-distance pipe penetration under the conditions of the unconsolidated formation and the hard-rock formation, and expand the range of application of the horizontal directional drilling method.

Description

The Pipeline Crossing by Horizontal Directional Drilling rig
Technical field
The utility model relates to a kind of Pipeline Crossing by Horizontal Directional Drilling rig, belongs to non-excavation crossing construction technical field.
Background technology
At present, for the horizontal directional drill construction technology of the above crossline of diameter 400mm, be divided into and bore pilot hole, reaming and return and drag three phases, first adopt horizontal directional drilling machine to bore a pilot hole along planned course; Then, at the end that is unearthed, drilling rod is connected with reamer, rig traction drilling rod, drilling rod drives reamer and enlarges step by step boring along passing through track, and every grade of about 150mm of reaming, treat 1.5 times of crossline external diameter or be greater than pipeline external diameter 300mm until boring aperture reaches; Finally, at the end that is unearthed, with drilling rod, connect crossline, crossline is pulled in boring and completed pipeline laying.
The weak point of said method is: 1, in reaming with return and to drag the stage, borehole wall only depends on liquid mud to support, for scall, be difficult to keep for a long time borehole wall stable, and the classification reaming can increase the disturbance to stratum, extend boring from the steady time, increase the risk of passing through failure that collapse hole causes.2, the drilling cuttings cut in boring procedure suspends by mud, and takes outside boring by the mobile of mud.For cobble and gravel stratum, owing to the drilling cuttings of large particle diameter can't being suspended and discharge boring, therefore lock of tool drilling very easily occurs, be not suitable for directly adopting Pipeline Crossing by Horizontal Directional Drilling.3, the stratum of rock strength higher (being greater than 50MPa) is passed through, and the drilling tool cutting moment of torque is large, when the crossline diameter is larger, can be subject to the drilling tool torque limited, is not suitable for the horizontal directional drill method.4,, in crossing process, mud works to carry drilling cuttings and stable hole wall.For the ability that improves mud suspension drilling cuttings will improve mud viscosity, reduce the mobility of mud, on the other hand for making mud will reduce the viscosity of mud in lower pressure current downflow on the one hand.For solving this contradiction, can only improve mud property, increase swell soil and additive amount, thereby strengthen construction cost.
Summary of the invention
The purpose of this utility model is to provide a kind of Pipeline Crossing by Horizontal Directional Drilling rig, to improve the stability of borehole wall, reduces the risk of crossing construction.
Technology contents of the present utility model is as follows:
The body interior of this rig is separated by the cabin wall, and cabin wall front surface connects conical breaker structure and main shaft, and front-end of spindle connects cutterhead and horizontal directional drill machine travel drilling rod, between the suction of conical breaker structure and cabin wall, is the muddy water storehouse, and the muddy water storehouse is provided with mud suction mouth.Wall rear surface, cabin connects cutter plate driver mechanism, is communicated with the water service pipe in muddy water storehouse and the gutter that is communicated with mud suction mouth, connects gravel pump on gutter.The body rear end connects the hauling pipe pipe nipple, and hauling pipe pipe nipple side face is provided with injected hole, is provided with the grouting pressure adjusting device and the Grouting Pipe that connect injected hole in the hauling pipe pipe nipple, and hauling pipe pipe nipple rear end connects crossline.
The beneficial effects of the utility model are as follows:
Borehole wall can obtain the support of crossline and high viscosity mud in time, can guarantee that hole wall is stable, reduces the construction risk caused because of collapse hole.Drilling cuttings drains into ground by special drainage pipe after the gravel pump pressurization, can not be deposited in boring, can reduce the construction risk that bit freezing causes.Water and bentonite consumption are few, can reduce construction cost, protection of the environment.For different stratigraphic types, drilling diameter only need be greater than crossline external diameter 50~300mm, becomes hole dimension little.Low to rig and the requirement of mud pump delivery, mud flow rate is little.Low to the construction plant requirement, pass through prefabricated the reaching back of pipeline section sectional and drag.Can realize that major diameter, long-distance pipe under bad ground (gravel, cobble, hard rock) condition pass through, and can enlarge the range of application of horizontal directional drill method.
The accompanying drawing explanation
Fig. 1 is Pipeline Crossing by Horizontal Directional Drilling rig structural representation.
The specific embodiment
Embodiment:
With reference to Fig. 1, embodiment of the present utility model is further illustrated:
This rig comprises muddy water storehouse 1, mud suction mouth 2, body 3, hauling pipe pipe nipple 4, main shaft 5, cutterhead 6, conical breaker structure 7, cabin wall 8, driving mechanism 9, gravel pump 10, injected hole 11, grouting pressure adjusting device 12, Grouting Pipe 13, water service pipe 14 and gutter 15:
Tubular body 3 inside are separated by cabin wall 8, and wall 8 front surfaces in cabin connect conical breaker structure 7 and are positioned at the main shaft 5 at its center, and main shaft 5 front ends connect cutterhead 6 and horizontal directional drill machine travel drilling rod.Between conical breaker structure 7 and cabin wall 8, be muddy water storehouse 1, muddy water storehouse 1 is provided with mud suction mouth 2.Wall 8 rear surfaces in cabin connect cutter plate driver mechanism 9, are communicated with the water service pipe 14 in muddy water storehouse 1 and the gutter 15 that is communicated with mud suction mouth 2, connect gravel pump 10 on gutter 15.The body 3 rear ends hauling pipe pipe nipple 4 that is articulated and connected, hauling pipe pipe nipple 4 side faces evenly are provided with 3~5 injected holes 11, are provided with the grouting pressure adjusting device 12 and the Grouting Pipe 13 that connect injected hole 11 in hauling pipe pipe nipple 3, hauling pipe pipe nipple 4 rear ends welding crosslines.
The concrete construction method of this rig is as follows:
Embodiment 1:
The stratum of passing through is mud, silty clay.At first in the unearthed preparation of having held.Lay water service pipe, gutter, Grouting Pipe and supply line in the crossline of end that is unearthed; Water service pipe in crossline, gutter, Grouting Pipe and supply line are connected with water service pipe 14, gutter 15 and the Grouting Pipe 13 of this rig, by 4 welding of the hauling pipe pipe nipple of crossline and this rig end.After horizontal directional drilling machine completes the pilot hole operation, being unearthed, end connects this rig.With horizontal directional drill machine travel drilling rod, with drilling rod draw this rig enter operating pit start the driving.This rig cutting stratum enlarges boring.Driving mechanism 9(MTR) drive cutterhead 6 cutting stratum, the required high-pressure slurry of MTR is provided by drilling rod by horizontal directional drilling machine.Mud, by the nozzle ejection on cutterhead 6 surfaces, mixes with drilling cuttings in the muddy water storehouse 1 of rig front end, by mud suction mouth 2, enters gutter 15, after gravel pump 10 pressurizations, drains into the end that is unearthed.This rig tunnels and draws crossline until end horizontal directional drilling machine one side of burying completes crossing construction.
Embodiment 2:
The stratum of passing through is flour sand, fine sand, medium sand, coarse sand.At first in the unearthed preparation of having held.Lay water service pipe, gutter, Grouting Pipe and supply line in the crossline of end that is unearthed; Water service pipe in crossline, gutter, Grouting Pipe and supply line are connected with water service pipe 14, gutter 15 and the Grouting Pipe 13 of this rig, crossline is connected with the hauling pipe pipe nipple 4 of this rig end.After horizontal directional drilling machine completes the pilot hole operation, being unearthed, end connects this rig.With horizontal directional drill machine travel drilling rod, with drilling rod draw this rig enter operating pit start the driving.This rig cutting stratum enlarges boring.Driving mechanism 9(MTR) drive cutterhead 6 cutting stratum, the required high-pressure slurry of MTR is provided by drilling rod by horizontal directional drilling machine.After the nozzle ejection of mud by cutterhead 6 surfaces, in the muddy water storehouse 1 of rig front end, with drilling cuttings, mix, by mud suction mouth 2, enter gutter 15, after gravel pump 10 pressurizations, drain into the end that is unearthed.Thixotropic slurry injects through Grouting Pipe 13 at the end that is unearthed, the space of being injected between crossline and borehole wall by injected hole 11.This rig tunnels and draws crossline until end horizontal directional drilling machine one side of burying completes crossing construction.
Embodiment 3:
The stratum of passing through is flour sand, fine sand, medium sand, coarse sand.At first in the unearthed preparation of having held.Lay water service pipe, gutter, Grouting Pipe and supply line in the crossline of end that is unearthed; Water service pipe in crossline, gutter, Grouting Pipe and supply line are connected with water service pipe 14, gutter 15 and the Grouting Pipe 13 of this rig, crossline is connected with the hauling pipe pipe nipple 4 of this rig end.After horizontal directional drilling machine completes the pilot hole operation, being unearthed, end connects this rig.With horizontal directional drill machine travel drilling rod, with drilling rod draw this rig enter operating pit start the driving.This rig cutting stratum enlarges boring.Driving mechanism 9(motor) drive cutterhead 6 cutting stratum, motor is powered by supply line by floor power supply device.Muddy water is injected by water service pipe 14 at the end that is unearthed, and the muddy water storehouse 1 of rig front end in, with after drilling cuttings mixes, by mud suction mouth 2, enters gutter 15, drains into unearthed the end after gravel pump 10 pressurizes.Thixotropic slurry injects through Grouting Pipe 13 at the end that is unearthed, the space of being injected between crossline and borehole wall by injected hole 11.This rig tunnels and draws crossline until end horizontal directional drilling machine one side of burying completes crossing construction.
Embodiment 4:
The stratum of passing through is gravel, cobble, rock.At first in the unearthed preparation of having held.Lay water service pipe, gutter, Grouting Pipe and supply line in the crossline of end that is unearthed; Water service pipe in crossline, gutter, Grouting Pipe and supply line are connected with water service pipe 14, gutter 5 and the Grouting Pipe 13 of this rig, crossline is connected with the hauling pipe pipe nipple 4 of this rig end.After horizontal directional drilling machine completes the pilot hole operation, being unearthed, end connects this rig.With horizontal directional drill machine travel drilling rod, with drilling rod draw this rig enter operating pit start the driving.This rig cutting stratum enlarges boring.Driving mechanism 9(motor) drive cutterhead 6 cutting stratum, motor is powered by supply line by floor power supply device.Muddy water is injected by water service pipe 14 at the end that is unearthed, and the muddy water storehouse 1 of rig front end in, with after drilling cuttings mixes, by mud suction mouth 2, enters gutter 15, drains into unearthed the end after gravel pump 10 pressurizes.In stratum, at first the cobble of large particle diameter, rubble pulverize through conical breaker structure 7, then enter gutter 15 through mud suction mouth 2.Thixotropic slurry injects through Grouting Pipe 13 at the end that is unearthed, the space of being injected between crossline and borehole wall by injected hole 11.This rig tunnels and draws crossline until end horizontal directional drilling machine one side of burying completes crossing construction.

Claims (2)

1. a Pipeline Crossing by Horizontal Directional Drilling rig is characterized in that:
The body of this rig (3) is inner to be separated by cabin wall (8), cabin wall (8) front surface connects conical breaker structure (7) and is positioned at the main shaft (5) at its center, and main shaft (5) front end connects cutterhead (6) and horizontal directional drill machine travel drilling rod; Between conical breaker structure (7) and cabin wall (8), be muddy water storehouse (1), muddy water storehouse (1) is provided with mud suction mouth (2); Cabin wall (8) rear surface connects cutter plate driver mechanism (9), is communicated with the water service pipe (14) in muddy water storehouse (1) and the gutter (15) that is communicated with mud suction mouth (2), the upper gravel pump (10) that connects of gutter (15); Body (3) rear end connects hauling pipe pipe nipple (4), hauling pipe pipe nipple (4) side face is provided with injected hole (11), be provided with the grouting pressure adjusting device (12) and the Grouting Pipe (13) that connect injected hole (11) in hauling pipe pipe nipple (4), hauling pipe pipe nipple (4) rear end connects crossline.
2. Pipeline Crossing by Horizontal Directional Drilling rig according to claim 1, is characterized in that body (3) the rear end hauling pipe pipe nipple (4) that is articulated and connected, and hauling pipe pipe nipple (4) side face evenly is provided with 3~5 injected holes (11).
CN2013203160681U 2013-06-03 2013-06-03 Drilling device for horizontal directional drilling penetration Expired - Fee Related CN203334955U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203160681U CN203334955U (en) 2013-06-03 2013-06-03 Drilling device for horizontal directional drilling penetration

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203160681U CN203334955U (en) 2013-06-03 2013-06-03 Drilling device for horizontal directional drilling penetration

Publications (1)

Publication Number Publication Date
CN203334955U true CN203334955U (en) 2013-12-11

Family

ID=49703633

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203160681U Expired - Fee Related CN203334955U (en) 2013-06-03 2013-06-03 Drilling device for horizontal directional drilling penetration

Country Status (1)

Country Link
CN (1) CN203334955U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213833A (en) * 2013-06-03 2014-12-17 中国石油天然气集团公司 Horizontal directional drilling crossing construction method and horizontal directional drilling crossing drilling device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104213833A (en) * 2013-06-03 2014-12-17 中国石油天然气集团公司 Horizontal directional drilling crossing construction method and horizontal directional drilling crossing drilling device
CN104213833B (en) * 2013-06-03 2016-08-10 中国石油天然气集团公司 Pipeline Crossing by Horizontal Directional Drilling construction method and rig thereof

Similar Documents

Publication Publication Date Title
CN104213833B (en) Pipeline Crossing by Horizontal Directional Drilling construction method and rig thereof
CN104864177B (en) A kind of no-dig technique bores top and combines Pipeline Crossing Program method
CN103806479B (en) A kind of pile foundation combined casting reinforced construction method of combination water-stop curtain
CN104533467B (en) A kind of high artesian, the method for protecting support in fault disruption zone tunnel
CN103899323B (en) A kind of construction method of shield crossing rail yard
CN101251018B (en) Subsection retrusive slip-casting method for porthole slurry-stop mixed double-pipe
CN101251019B (en) Subsection retrusive slip-casting method for porthole slurry-stop mixed double-pipe
CN103603689A (en) Curtain grouting construction method for treating mined-out areas
CN104763343A (en) Embedded bionic nozzle type multi-stage hole expanding drilling tool and hole expanding method thereof
CN102561950B (en) Process for realizing grouting consolidation for aggregates filled in cavities of strata and jetting drill bit
CN103234076B (en) Device for exchanging underground pipelines without trenching and application method thereof
CN202788617U (en) Horizontally oriented reaming device
CN101806196A (en) Compound rotary drilling rig drilling mechanism
CN202500606U (en) Device for filling aggregate into formation cavity through ground surface borehole
CN102536317B (en) Device and process for filling aggregate into stratum cavities through surface drilling
CN201395793Y (en) Long spiral high-pressure spraying mud injecting stirring pile-forming device
CN108590706A (en) One kind being used for speciality single-track railway tunnel drifter with booms Construction Techniques of Grouting in Heavy Curtain
CN102839661A (en) Construction technology of reelingly stirring to eject anchor tube pile
CN107313788B (en) The method and device of grouting for water blocking under strong hydraulic connection
CN203334955U (en) Drilling device for horizontal directional drilling penetration
CN105019917A (en) Impact drilling type advanced jet grouting pipe shed construction device and construction method
CN102926797B (en) Drilling, dust discharging and permeability-increasing integrated device for high gas pressure, high geostress and high crushing (three-high) area of coal mine
CN202381097U (en) High-pressure water spraying and spouting device for excavation face of grid tunnel shield
CN204476279U (en) The multistage borehole-enlarging drilling tool of the bionical nozzle of a kind of build-in
CN105134069B (en) One kind is related to gas vertical and passes through the anti-well method construction technology in strong rich water rock stratum

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Patentee after: China National Petroleum Corp.

Patentee after: CHINA PETROLEUM PIPELINE BUREAU

Patentee after: China Petroleum Pipeline Engineering Co.,Ltd.

Address before: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Patentee before: China National Petroleum Corp.

Patentee before: CHINA PETROLEUM PIPELINE BUREAU

Patentee before: CHINA PETROLEUM PIPELINE ENGINEERING Corp.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170328

Address after: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Patentee after: China National Petroleum Corp.

Patentee after: China Petroleum Pipeline Engineering Co.,Ltd.

Address before: 100007 Dongcheng District, Dongzhimen, China, North Street, No. 9 Oil Mansion, No.

Patentee before: China National Petroleum Corp.

Patentee before: CHINA PETROLEUM PIPELINE BUREAU

Patentee before: China Petroleum Pipeline Engineering Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131211

Termination date: 20210603