CN203334731U - Assembly type double-layer protective shed for safe operation - Google Patents

Assembly type double-layer protective shed for safe operation Download PDF

Info

Publication number
CN203334731U
CN203334731U CN2013203992461U CN201320399246U CN203334731U CN 203334731 U CN203334731 U CN 203334731U CN 2013203992461 U CN2013203992461 U CN 2013203992461U CN 201320399246 U CN201320399246 U CN 201320399246U CN 203334731 U CN203334731 U CN 203334731U
Authority
CN
China
Prior art keywords
steel
purline
assembly type
type double
combined
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2013203992461U
Other languages
Chinese (zh)
Inventor
宋永全
赵廷琛
郭雪珍
吕海英
刘安平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DATONG TAIRUI GROUP CONSTRUCTION Co Ltd
Original Assignee
DATONG TAIRUI GROUP CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DATONG TAIRUI GROUP CONSTRUCTION Co Ltd filed Critical DATONG TAIRUI GROUP CONSTRUCTION Co Ltd
Priority to CN2013203992461U priority Critical patent/CN203334731U/en
Application granted granted Critical
Publication of CN203334731U publication Critical patent/CN203334731U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model particularly discloses an assembly type double-layer protective shed for safe operation. The assembly type double-layer protective shed solves the problems that construction of an existing protective shed wastes time and labor, and safety risks exist. The assembly type double-layer protective shed is formed by combination of a plurality of single-span protective sheds. Each single-span protective shed comprises two combined steel beams in parallel, end portions of the two combined steel beams are connected with steel supports I, steel supports II are connected in the middle portions of the two combined steel beams, steel struts are connected on the lower portions of the combined steel beams, a steel purline I arranged in an inclined mode is connected between the steel supports I and the steel supports II, one portion, placed on the sides of the steel supports II, of the steel purline I is higher, a steel purline II located above the steel purline I is connected between the two combined steel beams, protective plates cover the steel purline I and the steel purline II, and rainproof cloth is laid on the protective plate on the steel purline I. The assembly type double-layer protective shed is reasonable and reliable in structural design, capable of meeting safe use demands of different types of work, saving in time and labor and convenient and fast to assemble, disassemble and convey, reduces labor intensity, and avoids potential safety hazards; the assembly type double-layer protective shed has the advantages of being simple in structure, reusable and low in cost.

Description

The safe Double-protection canopy of assembly flow shop
Technical field
The utility model relates to the construction safety protection device, is specially the safe Double-protection canopy of a kind of assembly flow shop.
Background technology
Along with social progress and scientific and technical development, in engineering construction, extensive highly difficult project is more and more, and the multiplex (MUX) plants cross-operation, and the site safety protection has been the most important thing in engineering construction.Usually the field work safe protection canopy is built and is adopted construction material connection, welding to build, and needs the unshielded work high above the ground of several workmans while building, and as adopted welding, causes the dismounting difficulty large.The above-mentioned mode of building causes to have enough to meet the need uses waste many, and numerous and diverse time of operation is long, and expense is large, and poor stability is lack of standardization, and potential safety hazard is many, is not suitable with engineer operation security protection needs.
Summary of the invention
The utility model builds in order to solve existing protection canopy the problem that wastes time and energy and have potential safety hazard, provides a kind of assembly flow shop safe Double-protection canopy.
The utility model is to adopt following technical scheme to realize: the safe Double-protection canopy of assembly flow shop, to be combined by some single span protection canopies, the single span protection canopy comprises two combined girder steels that are parallel to each other, the end of two combined girder steels all is connected with steel and supports I, the centre of two combined girder steels is connected with steel and supports II, the combined girder steel below is connected with steel strut, steel support I and steel support between II to be connected with and are obliquely installed and the higher steel purlin bar I of steel support II mono-side, be connected with the steel purlin bar II that is positioned at steel purlin bar I top between two combined girder steels, all be coated with protected apron on steel purlin bar I and steel purlin bar II, and the waterproof cloth of setting up defences of the protected apron upper berth on steel purlin bar I.
This structure design removes and installs fast power-saving, does not need to carry out work high above the ground, and steel purlin bar I is obliquely installed for draining, has overcome existing protection canopy and has built the problem that wastes time and energy and have potential safety hazard.
The utility model reasonable in design is reliable, can meet the safe handling requirement of different work posts, in the time of time saving and energy saving, reduced labour intensity, installation, dismounting and convenient transportation are quick, have stopped the generation of potential safety hazard, have advantages of simple in structure, reusable and cost is low.
The accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
The schematic side view that Fig. 2 is Fig. 1.
In figure: the 1-combined girder steel, the 2-steel supports I, and the 3-steel supports II, 4-steel strut, 5-steel purlin bar I, 6-steel purlin bar II.
The specific embodiment
The safe Double-protection canopy of assembly flow shop, to be combined by some single span protection canopies, the single span protection canopy comprises two combined girder steels that are parallel to each other 1, the end of two combined girder steels 1 all is connected with steel and supports I2, the centre of two combined girder steels 1 is connected with steel and supports II3, combined girder steel 1 below is connected with steel strut 4, steel support I2 and steel support between II3 to be connected with and are obliquely installed and the higher steel purlin bar I5 of steel support II3 mono-side, be connected with the steel purlin bar II6 that is positioned at steel purlin bar I5 top between two combined girder steels 1, all be coated with protected apron on steel purlin bar I5 and steel purlin bar II6, and the waterproof cloth of setting up defences of the protected apron upper berth on steel purlin bar I5.
In specific implementation process, combined girder steel 1 is comprised of two sections girder steels, the end that girder steel, steel support I2, steel support II3 and steel strut 4 is provided with junction plate, and inside all arranges diagonal brace, the end of steel purlin bar I5 and steel purlin bar II6 is provided with junction plate, all is screwed connection between each parts.

Claims (1)

1. the safe Double-protection canopy of assembly flow shop, it is characterized in that: be to be combined by some single span protection canopies, the single span protection canopy comprises two combined girder steels that are parallel to each other (1), the end of two combined girder steels (1) all is connected with steel and supports I(2), the centre of two combined girder steels (1) is connected with steel and supports II(3), combined girder steel (1) below is connected with steel strut (4), steel supports I(2) support II(3 with steel) between be connected be obliquely installed and steel support II(3) steel purlin bar I(5 that a side is higher), be connected with between two combined girder steels (1) and be positioned at steel purlin bar I(5) top steel purlin bar II(6), steel purlin bar I(5) and steel purlin bar II(6) on all be coated with protected apron, and the waterproof cloth of setting up defences of the protected apron upper berth steel purlin bar I(5).
CN2013203992461U 2013-07-05 2013-07-05 Assembly type double-layer protective shed for safe operation Expired - Lifetime CN203334731U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203992461U CN203334731U (en) 2013-07-05 2013-07-05 Assembly type double-layer protective shed for safe operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203992461U CN203334731U (en) 2013-07-05 2013-07-05 Assembly type double-layer protective shed for safe operation

Publications (1)

Publication Number Publication Date
CN203334731U true CN203334731U (en) 2013-12-11

Family

ID=49703410

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203992461U Expired - Lifetime CN203334731U (en) 2013-07-05 2013-07-05 Assembly type double-layer protective shed for safe operation

Country Status (1)

Country Link
CN (1) CN203334731U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442873A (en) * 2016-01-04 2016-03-30 山东盛发科工贸有限公司 Lightweight steel structure awning of gas station
CN107558605A (en) * 2017-10-24 2018-01-09 上海欧本钢结构有限公司 A kind of full truss-like building system
CN107761956A (en) * 2017-10-24 2018-03-06 上海欧本钢结构有限公司 A kind of truss and shaped steel combination building system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105442873A (en) * 2016-01-04 2016-03-30 山东盛发科工贸有限公司 Lightweight steel structure awning of gas station
CN107558605A (en) * 2017-10-24 2018-01-09 上海欧本钢结构有限公司 A kind of full truss-like building system
CN107761956A (en) * 2017-10-24 2018-03-06 上海欧本钢结构有限公司 A kind of truss and shaped steel combination building system
CN107558605B (en) * 2017-10-24 2023-11-07 上海欧本钢结构有限公司 Full truss type building system
CN107761956B (en) * 2017-10-24 2023-11-07 上海欧本钢结构有限公司 Truss and profile steel combined building system

Similar Documents

Publication Publication Date Title
CN202370253U (en) Assembly type single-row vertical rod machining shed for building construction site
CN204024676U (en) A kind of novel tunnel concrete steel form carrier
CN203334731U (en) Assembly type double-layer protective shed for safe operation
CN206481251U (en) A kind of photovoltaic bracket device of use truss string structure beam
CN203247868U (en) Large-span steel structure construction temporary supporting frame
CN202611714U (en) Tunnel assembly type construction trolley without welding
CN104532850A (en) Foundation pit supporting system
CN106758862A (en) Lattice tubular tower and frame pacifies, tears platform open
CN204174953U (en) Temporory structure integrated rain-proof is anti-pounds canopy
CN206562827U (en) A kind of modularization steel-frame structure for tower equipment
CN203257112U (en) Detachable assembly type safety protective shed
CN203513223U (en) High-altitude operating platform
CN202785351U (en) Tower cranes attached operating platform
CN202706508U (en) Overhanging strength bearing steel beam construction member of scaffold
CN203223035U (en) Unit body for combined type urgent repair tower for high voltage lines
CN203022328U (en) Climbing operation platform
CN206319559U (en) A kind of height can consecutive variations braced bar system
CN202000268U (en) Foldable front outrigger for bridge girder erection machine
CN204983719U (en) Assembly type structure faces flat protection of edge water and chooses net
CN201722937U (en) Sliding platform for installation of net rack
CN103397638A (en) Tie bar for supporting system in high-rigidity integral prestressed fabricated foundation pit support
CN204571321U (en) A kind of integrated form steel bar meter booth structure
CN203393721U (en) Inner support main purlin component
CN208235587U (en) A kind of large-span deep foundation pit underground power house rack assembling construction platform
CN204001887U (en) Dismantled and assembled dedicated platform for underground workshop vault lighting installation and repairing

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20131211

CX01 Expiry of patent term