CN203333467U - Double-chamber joined glass toughening furnace - Google Patents

Double-chamber joined glass toughening furnace Download PDF

Info

Publication number
CN203333467U
CN203333467U CN2013203103693U CN201320310369U CN203333467U CN 203333467 U CN203333467 U CN 203333467U CN 2013203103693 U CN2013203103693 U CN 2013203103693U CN 201320310369 U CN201320310369 U CN 201320310369U CN 203333467 U CN203333467 U CN 203333467U
Authority
CN
China
Prior art keywords
furnace
glass
chamber
double
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2013203103693U
Other languages
Chinese (zh)
Inventor
张亚青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU JINGGONG MACHINERY CO Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2013203103693U priority Critical patent/CN203333467U/en
Application granted granted Critical
Publication of CN203333467U publication Critical patent/CN203333467U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model relates to a double-chamber joined glass toughening furnace which can fundamentally solve the abrupt temperature change and heat energy loss at the joint of a double-chamber furnace and also can avoid secondary warping of the toughened glass. The double-chamber joined glass toughening furnace comprises a glass toughening double-chamber furnace, wherein no furnace door is arranged at the joint between two glass toughening furnaces, and the two glass toughening furnaces are in direct closed joint or sealed joint. The double-chamber joined glass toughening furnace provided by the utility model has the advantages that (I) the furnace is a closed or sealed channel when the toughened glass is preheated by the first glass toughening furnace and enters the second high-temperature glass toughening furnace, the heat is not lost, and the problem of heat energy loss at the joint of the double-chamber furnace is fundamentally solved; and (II) the toughened glass gradually changes from low temperature to high temperature, and the problems of secondary warping and quality flaw of a toughened glass surface caused by the abrupt temperature change at the joint of the double-chamber furnace are fundamentally solved.

Description

Two chambers disjunctor glass tempering furnace
Technical field
The utility model relates to a kind ofly can either fundamentally solve the abrupt change of dual chamber furnace joint temperature, heat-energy losses, can avoid again by two chambers disjunctor glass tempering furnace of toughened glass secondary warpage, belongs to two chambers glass tempering furnace and manufactures field.
Background technology
CN2549003Y, title " two chambers both-end glass tempering furnace ", mainly by glass delivery end, quenching air grid, heating chamber and air feed system, formed, it is characterized in that: this glass tempering furnace has the heating chamber of two adjacent settings, one side of two heating chamber disposes flat air grid, opposite side disposes curved air grid, at the outboard end of each air grid, disposes respectively the glass delivery end; Be connected and be respectively arranged with plenum chamber with curved air grid with flat air grid, two plenum chambers dispose respectively the high pressure positive blower be connected through the high-pressure blast pipeline and the fan with low voltage be connected through the low pressure air supply line respectively.
CN202022847U, title " a kind of glass toughening double-chamber furnace ", comprise preheating oven and annealing furnace, and preheating oven is arranged on the annealing furnace upstream, is provided with independently heating source on preheating oven and annealing furnace, and glass enters preheating oven successively, annealing furnace completes heating.
CN2518858Y, title " twin-furnace glass toughening device ", by high temperature preheating furnace and horizontal annealing furnace, formed, high temperature preheating furnace and horizontal annealing furnace form by steel construction body of heater, horizontal transmission roller-way, heating unit, temperature control unit, fire door mechanism and self-con-tained unit, it is characterized in that: described high temperature preheating furnace is arranged on the front end of horizontal annealing furnace, the absolute altitude of the horizontal transmission roller-way of high temperature preheating furnace and the horizontal transmission roller-way of horizontal annealing furnace is consistent, transfer rate is identical, and in the stove of high temperature preheating furnace, temperature is controlled at 250-350 ℃.
The common weak point existed of above-mentioned background technology: the one, do not solve the problem of dual chamber furnace joint heat-energy losses, while by toughened glass, by the preheating of First glass tempering furnace, being entered second high temp glass annealing furnace, two fire doors are opened simultaneously, the heat large problem that runs off; The 2nd, do not solve due to the abrupt change of dual chamber furnace joint temperature cause by the problem of toughened glass face secondary warpage, by toughened glass by hot enter cold conditions, again by cold conditions enter in hot traveling process, caused by the problem of toughened glass secondary warpage, quality flaw.
The utility model content
Purpose of design: avoid the weak point in background technology, design and a kind ofly can either fundamentally solve the abrupt change of dual chamber furnace joint temperature, heat-energy losses, can avoid again by two chambers disjunctor glass tempering furnace of toughened glass secondary warpage.
Design: in order to realize above-mentioned purpose of design.1, two table glass annealing furnace docking ports, without the design of fire door and direct closed and butted or sealing docking, are one of technical characterictics of the present utility model.The purpose of doing like this is: one is that two table glass annealing furnace docking ports are without fire door and directly closed and butted (for the sealing docking) or sealing docking, and this closed and butted or sealing docking section are provided with thermal insulation layer, therefore solved the defect of two table glass annealing furnace docking section heat-energy losses of background technology existence; Two is to be respectively equipped with outstanding solid thermal insulative board in the mouth of two table glass annealing furnace docking ports, these two outstanding solid thermal insulative board lower surfaces are provided with the glass transfer passage consisted of ceramic deflector roll, this glazing channel is the same level glass transfer passage for being communicated with First glass tempering furnace and the second table glass annealing furnace, therefore guaranteed stationarity and the consistence of being carried by toughened glass, and the phenomenon of having avoided the joint high temperature heat to run off; Three is to be provided with the process furnace silk between two outstanding solid thermal insulative boards, and this process furnace silk both can be controlled separately, also can together adopt the PLC controller to control with complete machine, has guaranteed that the temperature required by toughened glass control.2, being respectively equipped with the design of outstanding solid thermal insulative board in the mouth of two table glass annealing furnace docking ports, is two of technical characterictic of the present utility model.The purpose of doing like this is: outstanding solid thermal insulative board is set respectively in the export and import of two table glass annealing furnaces, the space formed between these two unsettled fixing thermal insulative boards is built-in with the process furnace silk, this process furnace silk is according to the needs to steady rising by toughened glass temperature rise external phase, the heat of its generation is higher than the terminal temperature of First glass tempering furnace preheating, temperature lower than the second table glass annealing furnace import, thereby make by toughened glass on the glass transfer passage that ceramic roller forms in traveling process, all the time the material of contact does not change, envrionment temperature gradually changes from low to high, avoided background technology to exist by toughened glass secondary warpage, the problem of quality flaw.
Technical scheme: a kind of pair of chamber disjunctor glass tempering furnace, comprise glass toughening double-chamber furnace, described two table glass annealing furnace docking ports are without fire door and directly closed and butted or sealing docking.
The utility model is compared with background technology, and the one, while by toughened glass, by the preheating of First glass tempering furnace, being entered second high temp glass annealing furnace, be sealing or seal channel, heat can not run off, and fundamentally solves the problem of dual chamber furnace joint heat-energy losses; The 2nd, by toughened glass, by low temperature, to high temperature, gradually changed, fundamentally solve due to the abrupt change of dual chamber furnace joint temperature cause by the problem of toughened glass face secondary warpage, quality flaw.
The accompanying drawing explanation
Fig. 1 is the structural representation of two chambers disjunctor glass tempering furnace.
Embodiment
Embodiment 1: with reference to accompanying drawing 1.A kind of pair of chamber disjunctor glass tempering furnace, comprise glass toughening double-chamber furnace, and described two table glass annealing furnaces 1 and 2 docking ports are without fire door and directly sealing docking.Be respectively equipped with outstanding solid thermal insulative board 3 in the mouth of described two table glass annealing furnaces 1 and 2 docking ports and two outstanding solid thermal insulative board 3 lower surfaces are the glass transfer passages that ceramic deflector roll 5 forms.Be provided with process furnace silk 4 between described two outstanding solid thermal insulative boards 3, this process furnace silk 4 can be selected as required.Heating temperature between described two outstanding solid thermal insulative boards 3 is higher than the terminal temperature of First glass tempering furnace 1, lower than the second table glass annealing furnace 2 top temperature.Described direct closed and butted or sealing docking section are provided with thermal insulation layer.
Outstanding solid thermal insulative board 3 refers to that the both sides of thermal insulative board and top are fixedly connected with glass tempering furnace stove inwall.
Embodiment 2: on the basis of embodiment 1, described two table glass annealing furnaces 1 and 2 docking ports are without fire door and direct closed and butted.
Its pair of chamber disjunctor glass tempering furnace without the heat waste heating means: the glass transfer passage consisted of ceramic deflector roll 5 by the glass of tempering is carried, by the glass of tempering by 1 preheating of First glass tempering furnace after, incessantly by temperature during higher than First glass tempering furnace 1 terminal temperature and by First glass tempering furnace 1 and the second table glass annealing furnace 2 formed space of joint, both be positioned at the heat continuation heating that the process furnace silk 4 in the joint space sends, also heat does not run off, and enter incessantly the second table glass annealing furnace continuation heating of temperature higher than process furnace silk 4, until complete the tempering to glass.
Need to understand: although above-described embodiment is to the mentality of designing of the present utility model detailed text description of contrasting; but these text descriptions; just the simple text of the utility model mentality of designing is described; rather than to the restriction of the utility model mentality of designing; any combination, increase or modification that does not exceed the utility model mentality of designing, all fall in protection domain of the present utility model.

Claims (5)

1. two chambers disjunctor glass tempering furnace, comprise glass toughening double-chamber furnace, it is characterized in that: described two table glass annealing furnace (1,2) docking ports are without fire door and directly closed and butted or sealing docking.
2. according to claim 1 pair of chamber disjunctor glass tempering furnace, it is characterized in that: being respectively equipped with thermal insulative board (3) and two thermal insulative boards (3) lower surface in the mouth of described two table glass annealing furnace (1,2) docking ports is the glass transfer passage that ceramic deflector roll (5) forms.
3. according to claim 2 pair of chamber disjunctor glass tempering furnace, is characterized in that: be provided with process furnace silk (4) between described two thermal insulative boards (3).
4. according to 1 or 3 described pair of chamber disjunctor glass tempering furnace of claim, it is characterized in that: the Heating temperature between described two thermal insulative boards (3) is higher than the terminal temperature of First glass tempering furnace (1), lower than the second table glass annealing furnace (2) top temperature.
5. according to claim 1 pair of chamber disjunctor glass tempering furnace is characterized in that: described direct closed and butted or sealing docking section are provided with thermal insulation layer.
CN2013203103693U 2013-05-31 2013-05-31 Double-chamber joined glass toughening furnace Expired - Lifetime CN203333467U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203103693U CN203333467U (en) 2013-05-31 2013-05-31 Double-chamber joined glass toughening furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203103693U CN203333467U (en) 2013-05-31 2013-05-31 Double-chamber joined glass toughening furnace

Publications (1)

Publication Number Publication Date
CN203333467U true CN203333467U (en) 2013-12-11

Family

ID=49702157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203103693U Expired - Lifetime CN203333467U (en) 2013-05-31 2013-05-31 Double-chamber joined glass toughening furnace

Country Status (1)

Country Link
CN (1) CN203333467U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104291668A (en) * 2013-05-31 2015-01-21 张亚青 Double-chamber connected glass toughening furnace and heat-loss-free heating method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104291668A (en) * 2013-05-31 2015-01-21 张亚青 Double-chamber connected glass toughening furnace and heat-loss-free heating method

Similar Documents

Publication Publication Date Title
CN103667666B (en) The sheet material heat treating method of continuous roller bottom type heat treatment furnace
CN101922862A (en) Three-section four-door long-tunnel energy-saving type microwave sintering furnace
CN104313295B (en) Roller-bottom type sheet material continuous tempering furnace and tempering method thereof
CN102620559B (en) Novel tunnel-type folded-rail continuous sintering furnace and sintering method thereof
CN110607429B (en) Roller hearth type plate continuous furnace and tempering method thereof
CN203333467U (en) Double-chamber joined glass toughening furnace
CN202785968U (en) Heater for forming and annealing plate glass
CN101975509B (en) Glazed hollow bead fuel gas expansion furnace complete plant
CN206430540U (en) A kind of drying furnace system of temperature automatic adjustment control
CN203295556U (en) Heat-treatment furnace system for waste heat recovery
CN103822469B (en) Chamber type electric resistance furnace
CN202022847U (en) Glass toughening double-chamber furnace
CN204690079U (en) A kind of double-regenerative heating furnace
CN104561515A (en) Continuous plate blank heating furnace and heating method thereof
CN204281557U (en) A kind of glass annealing crystallization all-in-one oven
CN102747202A (en) Biomass annealing furnace
CN201925932U (en) Novel air-single regenerative and air-gas dual regenerative general heating furnace
CN202543046U (en) Forced convection heating device for low emissivity coated glass
CN202393206U (en) Novel tunnel type folding rail continuous sintering kiln
CN201867036U (en) Complete gas expansion furnace for vitrification of micro bead
CN104291668A (en) Double-chamber connected glass toughening furnace and heat-loss-free heating method
CN204401072U (en) Continous way bar plate heating stove
CN104178605B (en) Two roller bed conveyors roller furnace
CN202011832U (en) Tempering furnace outlet heating device
CN202692680U (en) Natural gas heating furnace burners distributed structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hangzhou Jinggong Machinery Co.,Ltd.

Assignor: Zhang Yaqing

Contract record no.: 2015330000183

Denomination of utility model: Double-chamber connected glass toughening furnace and heat-loss-free heating method

Granted publication date: 20131211

License type: Exclusive License

Record date: 20150629

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
TR01 Transfer of patent right

Effective date of registration: 20210820

Address after: No.1, Fengyun Road, Renhe street, Yuhang District, Hangzhou City, Zhejiang Province

Patentee after: HANGZHOU JINGGONG MACHINERY Co.,Ltd.

Address before: 310002 Room 102, No. 20, shianwan lane, Shangcheng District, Hangzhou City, Zhejiang Province

Patentee before: Zhang Yaqing

TR01 Transfer of patent right
CX01 Expiry of patent term

Granted publication date: 20131211

CX01 Expiry of patent term