CN203319737U - Emergency processing system for sudden water pollution accidents - Google Patents

Emergency processing system for sudden water pollution accidents Download PDF

Info

Publication number
CN203319737U
CN203319737U CN2013203719296U CN201320371929U CN203319737U CN 203319737 U CN203319737 U CN 203319737U CN 2013203719296 U CN2013203719296 U CN 2013203719296U CN 201320371929 U CN201320371929 U CN 201320371929U CN 203319737 U CN203319737 U CN 203319737U
Authority
CN
China
Prior art keywords
efficient adsorption
pontoon bridge
water pollution
bridge framework
panel assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN2013203719296U
Other languages
Chinese (zh)
Inventor
李青云
陈进
赵良元
林莉
吴敏
赵鑫
黄茁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changjiang River Scientific Research Institute Changjiang Water Resources Commission
Changjiang Waterway Planning Design and Research Institute
Original Assignee
Changjiang River Scientific Research Institute Changjiang Water Resources Commission
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changjiang River Scientific Research Institute Changjiang Water Resources Commission filed Critical Changjiang River Scientific Research Institute Changjiang Water Resources Commission
Priority to CN2013203719296U priority Critical patent/CN203319737U/en
Application granted granted Critical
Publication of CN203319737U publication Critical patent/CN203319737U/en
Anticipated expiration legal-status Critical
Withdrawn - After Issue legal-status Critical Current

Links

Images

Landscapes

  • Water Treatment By Sorption (AREA)

Abstract

The utility model provides an emergency processing system for sudden water pollution accidents. The emergency processing system comprises a movable floating bridge frame and a plurality of efficient adsorption plate devices which are detachably mounted at the bottom of the movable floating bridge frame; a worker operation region is distributed on the movable floating bridge frame; each efficient adsorption plate device comprises a rectangular outer frame; the side wall of the outer frame is provided with a plurality of parallel clamping grooves; the clamping grooves are internally provided with efficient adsorption plates; each efficient adsorption plate is in a mesh plate structure; active carbon fibers are distributed on the front and back side faces of the efficient adsorption plates; connection devices are mounted in the middles of front and back edge frames and left and right edge frames. The emergency processing system can rapidly and effectively solve the problems of sudden organic pollutants and metal pollution of flowing or static water regions of lakes, rivers, reservoirs and the like. The system is friendly to the environment, has no secondary pollution, can be assembled simply and quickly and is capable of coping with the sudden water pollution accidents flexibly. The emergency processing system can also be used as an emergency processing stand-by device of flood prevention and emergency rescuing, water source protection and the like.

Description

A kind of sudden water pollution accident emergent treatment system
Technical field
The utility model relates to water and pollutes processing technology field, specifically a kind of sudden water pollution accident emergent treatment system.
Background technology
In recent years, the domestic and international sudden water pollution accident caused due to boats and ships shipping, chemical enterprise burst accident, oil leakage, sewage discharge and lake eutrophication etc. frequently occurs.From general water, pollute different, sudden water pollution accident has extremely strong Unpredictability and diversity, can cause a large amount of pollutant emissions in the short period of time, can cause the heavy losses of waterhead area pollution and potable water system, affect contaminated littoral resident's livelihood, havoc periphery ecotope, mishandlingly also can stay far-reaching sequela.Therefore, solving the water body sudden water pollution accident has been current key technical problem urgently to be resolved hurrily.
Water body sudden water pollution accident pollution source mainly includes organic pollutants, heavy metal contamination.Processing about organic pollutant mainly adds the sorbent materials such as the oxygenants such as potassium permanganate, ozone and gac, by pollutant oxidation, Adsorption, the pollution of heavy metal is by regulating water pH value, add the suitable flocculation agents such as aluminium salt, molysite and make pollutent generate flco, finally removed by precipitation.Although above method can reduce the pollutent in water, oxidation style takes effect slowly for the mobility water body, and there is complicated operation in this kind of method for natural water, and easily causes the problem of secondary pollution; And add pharmaceutical chemicals flocculent precipitation pollutent, throw out is processed complicated, if the later stage is not processed these throw outs, its impact on water surrounding also can be larger.
Chinese patent (the application number: CN201210444688.3), announced a kind of connecting rod flighting schedule adsorption unit that is applied to the sudden water pollution emergency processing that is called " a kind of connecting rod flighting schedule adsorption unit that is applied to the sudden water pollution emergency processing " in the utility model name.This utility model is used and is driven rocker arrangement to make the filter bag heaving and dipping that the granular adsorption material is housed on connecting rod, add the strong convection diffusion, make the sorbing material in filter bag that fluidisation to a certain degree occur, increased the touch opportunity of the hazardous and noxious substances such as sorbing material and organism or heavy metal in the filter bag.This kind of method drives rocker arrangement to need manual control, and this device design is complicated, for the improvement of pollution in wide area current water or impounded body, increased manpower and material resources, expends excessive, very flexible.
Chinese patent (the application number: CN201120367052.4) that is called " Biodegradable floating bed that the oil spill seawater has adsorption function " in the utility model name, announced a kind of Biodegradable floating bed that the oil spill seawater is there is to adsorption function, floating bed consists of the compound porous plate of poly beta-hydroxybutyrate, be connected with the silk screen bag of poly beta-hydroxybutyrate under floating bed, in the silk screen bag, filling has the adsorption function granule adsorbent to petroleum hydrocarbon, thereby to being subject to the oil spill seawater to carry out the physical adsorption processing.The whole adsorbable greasy dirt of this oil spot treatment device, need whole device is taken out from water after greasy dirt absorption is saturated and process greasy dirt, thereby increased manpower, tackles sudden oil pollution handiness poor; The adsorption filament mesh bag is right cylinder, and sorbing material wherein is the greasy dirt in planar water fully, thereby has reduced adsorption efficiency.
Chinese patent (the application number: CN201220032956.6) that is called " a kind of charcoal wetland floating bed " in the utility model name, floating bed comprises the slot type implant bed, be provided with connecting hole on the slot type implant bed, be filled with the charcoal filler in the groove of slot type implant bed, plant wetland plant in the charcoal filler, rely on biological activated carbon absorption and wetland plant to absorb the nutritive substance in water.In this kind of wetland floating bed, biological activated carbon is mainly as the matrix of plant-growth, so its adsorption is limited, adsorbs saturated manipulation of regeneration flexibly; This floating bed is mainly or relies on the purifying water body that is used for of plant to pollute, but the cleaning action onset of plant is slower, for sudden water pollution is more difficult, proves effective.
Chinese patent (the application number: CN201210204145.4) that is called " be applied to the absorption fluidized-bed of sudden water pollution emergency processing and utilize it to carry out the method for sudden water pollution emergency processing " in the utility model name, announced while fully not spreading in water pollution group, fluidizer is installed aboard ship, will be polluted group's suction with pump and wherein be processed; Or at the front end of conveyance canal regulating sluice, hand bracket is installed, and at the inner absorption body of wall of filling of hand bracket, at the upstream face of absorption body of wall, the absorption fluidized-bed is installed, will in water suction fluidized-bed, carry out the organic pollutant processing by syphonic effect.For the pollution in wide area water body, this water body by whole waters is drawn on ship and carries out dystopy improvement, then enters the more difficult effect of gathering of mode in water body.
As can be seen here, above-mentioned sudden water pollution treatment unit or device design are complicated, increase manpower and materials; Or need to from water, integral body take out after handling, very flexible, can not tackle sudden water pollution accident by rapid-assembling; Or adopt plant floating bed or dystopy processing, for sudden water pollution is more difficult, prove effective.Due to imprevision row and the complicacy of sudden water pollution, the type of polluted-water is various, therefore, but develops a kind of environmental friendliness, does not produce secondary pollution, assembling is simple, emergent treatment system in-situ treatment, handiness fast is very important.
Summary of the invention
The purpose of this utility model is for the deficiencies in the prior art, providing a kind of flows or the sudden water pollution emergent treatment system in static waters for lake, river, reservoir, waterhead area etc., this emergent treatment system can carry out in-situ treatment to the burst Pollution water body, can be used for solving the sudden water pollution problem such as organic pollutant, heavy metal of the insoluble water body in large of prior art.
A kind of sudden water pollution accident emergent treatment system, comprise removable pontoon bridge framework and a plurality of efficient adsorption panel assembly that is removably mounted on removable pontoon bridge framework bottom, be laid with personnel's operating area above removable pontoon bridge framework, described efficient adsorption panel assembly comprises the housing of a rectangular shape, a plurality of parallel draw-in grooves are set on the sidewall of housing, the efficient adsorption plate is installed in draw-in groove, the efficient adsorption plate is the mesh plate structure, and the positive and negative side of efficient adsorption plate is laid with activated carbon fiber; Frame mid-way, removable pontoon bridge framework all around is equipped with coupling device.
Sudden water pollution accident emergent treatment system as above, also be provided with buoyancy regulating device on removable pontoon bridge framework, and described buoyancy regulating device is the buoyant spheres that the plastic hollow material is made, and offers tool plug opening on buoyant spheres.
Sudden water pollution accident emergent treatment system as above, be provided with the screw shape connecting joint of the Link Port be connected on removable pontoon bridge framework on buoyant spheres.
Sudden water pollution accident emergent treatment system as above, be laid with a plurality of efficient adsorption panel assembly mounting points above described removable pontoon bridge framework, mounting points is the rectangular parallelepiped hollow type, a plurality of efficient adsorption panel assembly slots of the symmetrical laying in middle both sides, the efficient adsorption panel assembly inserts in efficient adsorption panel assembly slot.
Sudden water pollution accident emergent treatment system as above, coupling device adopts the hook mode, and before removable pontoon bridge framework and the left side is coupling hook, and after removable pontoon bridge framework and the right is to coordinate the Link Port of hook with coupling hook.
Sudden water pollution accident emergent treatment system as above, at the upper and lower two ends of efficient adsorption plate central part, also be provided with for regulating the direction adjusting apparatus of efficient adsorption plate direction, upper and lower direction of both ends setting device is connected, direction adjusting apparatus adopts the screw tightening device, efficient adsorption panel assembly bottom is provided with the efficient adsorption plate and is connected and fixed a little, is connected and fixed a little and is connected with the direction adjusting apparatus of efficient adsorption plate lower end central authorities.
Efficient adsorption panel assembly on the removable pontoon bridge framework of the utility model is by contacting with the direct of polluted-water, rely on the efficient adsorption effect to carry out original position to polluted-water and process on the spot, can fast, effectively solve that lake, river, reservoir etc. flow or sudden organic pollution thing, the heavy metal in static waters dye problem.Native system has environmental friendliness, does not produce secondary pollution, assembles the characteristics such as reply sudden water pollution accident simple, quick, handiness.The utility model also can be used as the emergency processing stand-by plant of flood fighting, waterhead area protection etc.
The accompanying drawing explanation
Fig. 1 is the structure schematic top plan view of one of them embodiment of the utility model sudden water pollution accident emergent treatment system;
Fig. 2 is the structure schematic side view of one of them embodiment of the utility model sudden water pollution accident emergent treatment system;
Fig. 3 is the skeleton view of efficient adsorption panel assembly in one of them embodiment of the utility model sudden water pollution accident emergent treatment system;
Fig. 4 is the side-view of efficient adsorption plate in one of them embodiment of the utility model sudden water pollution accident emergent treatment system;
Fig. 5 is the vertical view that one of them embodiment of the utility model sudden water pollution accident emergent treatment system builds the pontoon bridge body on current water;
Fig. 6 is the vertical view that one of them embodiment of the utility model sudden water pollution accident emergent treatment system builds floating barrier on impounded body.
In figure: the removable pontoon bridge framework of 1-integrated form, 2-personnel operating area, 3-efficient adsorption panel assembly, the 4-coupling device, 5-buoyancy regulating device, 6-efficient adsorption plate, 7-efficient adsorption panel assembly slot, the 8-direction adjusting apparatus, 9-activated carbon fiber, 10-flowing polluted water body, 11-pontoon bridge anchoring device, 12-pontoon bridge system, the static polluted-water of 13-, 14-floating barrier system.
Embodiment
Below in conjunction with the accompanying drawing in the utility model, the technical scheme in the utility model is clearly and completely described.
Figure 1 shows that the structure schematic top plan view of a kind of sudden water pollution accident emergent treatment system of the utility model embodiment, this system comprises removable pontoon bridge framework 1 and a plurality of efficient adsorption panel assembly 3 that is removably mounted on removable pontoon bridge framework 1 bottom.
Described removable pontoon bridge framework 1 can be large by buoyancy, hardness is high, the environment-friendly materials of good toughness (for example polyethylene) are made, because it has lightweight, good toughness, the advantages such as hardness is high, buoyancy is large, acid and alkali-resistance, can stand that the invasion and attack of Environmental variations and low temperature, combination change flexibly, the life-span is long, antiultraviolet is anti-aging, and pollution-free, welding, not recyclable.Make stable the floating on the water surface of whole pontoon bridge framework by material self buoyancy.Described removable pontoon bridge framework 1 employing edge is solid, the structure of hollow, can produce larger buoyancy, but single removable pontoon bridge framework 1 buoyancy load-bearing 1 people's weight.
Also be provided with buoyancy regulating device 5 on removable pontoon bridge framework 1, the buoyant spheres that buoyancy regulating device 5 is made for the plastic hollow material, offer the tool plug opening opening of stopper (with) on buoyant spheres; Also be provided with screw shape connecting joint on buoyant spheres, the screw-like connecting joint is connected on the Link Port on removable pontoon bridge framework 1, and the screw-like connecting joint can keep the strength of joint of buoyancy regulating device 5 and removable pontoon bridge framework 1; By tool plug opening, the water body of can packing in buoyant spheres, thus force down the center of gravity of whole buoyancy regulating device 5, improve the ability of wind and wave resistance; By the adjusting of buoyancy, but single removable pontoon bridge framework 1 buoyancy load-bearing 2-3 people weight.
Be laid with personnel's operating area 2 above removable pontoon bridge framework 1, the relevant treatment unit of supporting installation that operator can handiness on removable pontoon bridge framework 1, as assembling or dismounting efficient adsorption panel assembly 3; If it is saturated that efficient adsorption panel assembly 3 reaches absorption, the scientific research personnel can carry out the work such as replacing of new efficient adsorption plate by the personnel's operating area 2 on removable pontoon bridge framework 1.
Please further with reference to figure 2, be laid with a plurality of efficient adsorption panel assembly 3 mounting points above described removable pontoon bridge framework 1, mounting points is the rectangular parallelepiped hollow type, a plurality of efficient adsorption panel assembly slots 7 of the symmetrical laying in middle both sides, can directly insert efficient adsorption panel assembly 3 in efficient adsorption panel assembly slot 7, efficient adsorption panel assembly slot 7 can adopt the bayonet type opening, after efficient adsorption panel assembly 3 inserts, can fix by the bayonet type opening.This bayonet type is installed site and can a plurality ofly be laid on removable pontoon bridge framework 1, for flexible Fast Installation dismounting efficient adsorption panel assembly 3, but also can be according to the supporting relevant efficient adsorption panel assembly 3 of different pollutent handinesies.
Please further with reference to figure 3, described efficient adsorption panel assembly 3 comprises the housing of a rectangular shape, a plurality of parallel draw-in grooves are set on the sidewall of housing, efficient adsorption plate 6 is installed in draw-in groove, efficient adsorption plate 6 is the mesh plate structure, and the positive and negative side of efficient adsorption plate 6 is laid with activated carbon fiber 9 (as shown in Figure 4).Described efficient adsorption panel assembly 3 can improve the active adsorption area of whole adsorption unit in polluted-water greatly, improve adsorption efficiency, with traditional absorption probe or adsorbing bar, compare, efficient adsorption plate 6 more can be given full play to the efficient adsorption effect of sorbing material to heavy metal in water and organic pollutant, can realize at short notice that pollutent is removed, go deep into the pollutents such as the organic pollutant in quick adsorption removal water, heavy metal in water.In addition, efficient adsorption panel assembly 3, owing to adopting the card slot type mounting means, so can easily install, dismantle, can disassemble efficient adsorption panel assembly 3 after sorbing material reaches capacity from pontoon bridge, change new efficient adsorption panel assembly.Adsorb saturated efficient adsorption panel assembly and can reach by the regeneration of regneration of adsorbent material device the purpose recycled on the coast.Select the regenerations such as acid-alkali regeneration or heat regeneration according to sorbing material, and the corresponding regenerating unit of supporting laying.
On described removable pontoon bridge framework 1, coupling device 4 also is installed, coupling device 4 is laid in removable pontoon bridge framework 1 frame mid-way, all around; Coupling device 4 can adopt the hook mode, and before removable pontoon bridge the framework 1 and left side is coupling hook, and after removable pontoon bridge framework 1 and the right is to coordinate the Link Port of hook with coupling hook.Please refer to Fig. 5, as when the river generation sudden water pollution, can connect a plurality of removable pontoon bridge frameworks 1 by coupling device 4 and form pontoon bridge systems 12, pontoon bridge system 12 two ends are fixed on the two sides, river by pontoon bridge anchoring device 11; If stream pollution is very serious, can parallelly build a plurality of pontoon bridge systems 12 with efficient fast processing sudden organic pollution or heavy metal pollution problem.Please refer to Fig. 6, as in reservoir or the lake property sent out water pollution accident, thereby can by a removable pontoon bridge framework 1 all around four coupling devices 4 connect a plurality of removable pontoon bridge frameworks 1 and be built into large-area floating barrier system 14 and cover whole polluted waters, cover the whole water surface and remove the pollutents such as organic pollutant in water and heavy metal by the efficient adsorption effect of efficient adsorption panel assembly 3.
Preferably, please refer to Fig. 4, on efficient adsorption plate 6, also be provided with for regulating the direction adjusting apparatus 8 of efficient adsorption plate 6 directions, direction adjusting apparatus 8 is in efficient adsorption plate two ends central part Shang Xia 6, upper and lower direction of both ends setting device 8 is connected, direction adjusting apparatus 8 adopts and is similar to the screw tightening device, by efficient adsorption plate 6 is inserted in efficient adsorption panel assembly 3.Efficient adsorption panel assembly 3 bottoms are provided with the efficient adsorption plate and are connected and fixed a little, be connected and fixed a little and can be connected with the direction adjusting apparatus 8 of efficient adsorption plate lower end central authorities, can be by first efficient adsorption plate 6 being arranged to certain direction, by tightening direction setting device 8, direction adjusting apparatus 8 and the efficient adsorption panel assembly 3 bottom tie points of efficient adsorption plate 6 bottoms are fixedly connected, thereby fix its direction.Therefore, adjustable high-efficient adsorption plate 6 and efficient adsorption panel assembly 3 in conjunction with firm degree, thereby according to the water (flow) direction adjusting angle, can regulate efficient adsorption plates 6 downstream, reach tiltedly to water (flow) direction over against current by described direction adjusting apparatus 8.
The utility model can carry out handiness for different polluted-water types, different pollutant types and assemble fast, can round-the-clock polluted-water be purified, this system, for the emergency processing of sudden water pollution event, has suitable handiness and practicality.
The above; it is only embodiment of the present utility model; but protection domain of the present utility model is not limited to this; anyly belong to those skilled in the art in the technical scope that the utility model discloses; the variation that can expect easily or replacement, within all should being encompassed in protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain of claim.

Claims (7)

1. a sudden water pollution accident emergent treatment system, it is characterized in that: comprise removable pontoon bridge framework (1) and a plurality of efficient adsorption panel assembly (3) that is removably mounted on removable pontoon bridge framework (1) bottom, be laid with personnel's operating area (2) above removable pontoon bridge framework (1), described efficient adsorption panel assembly (3) comprises the housing of a rectangular shape, a plurality of parallel draw-in grooves are set on the sidewall of housing, efficient adsorption plate (6) is installed in draw-in groove, efficient adsorption plate (6) is the mesh plate structure, the positive and negative side of efficient adsorption plate (6) is laid with activated carbon fiber (9), frame mid-way, removable pontoon bridge framework (1) all around is equipped with coupling device (4).
2. sudden water pollution accident emergent treatment system as claimed in claim 1 is characterized in that: described removable pontoon bridge framework (1) is made by polyethylene that edge is solid, the structure of hollow.
3. sudden water pollution accident emergent treatment system as claimed in claim 1, it is characterized in that: also be provided with buoyancy regulating device (5) on removable pontoon bridge framework (1), the buoyant spheres that described buoyancy regulating device (5) is made for the plastic hollow material, offer tool plug opening on buoyant spheres.
4. sudden water pollution accident emergent treatment system as claimed in claim 3, is characterized in that: the screw shape connecting joint that is provided with the Link Port be connected on removable pontoon bridge framework (1) on buoyant spheres.
5. sudden water pollution accident emergent treatment system as claimed in claim 1, it is characterized in that: be laid with a plurality of efficient adsorption panel assemblies (3) mounting points above described removable pontoon bridge framework (1), mounting points is the rectangular parallelepiped hollow type, the symmetrical a plurality of efficient adsorption panel assembly slots (7) of laying in middle both sides, efficient adsorption panel assembly (3) inserts in efficient adsorption panel assembly slot (7).
6. sudden water pollution accident emergent treatment system as claimed in claim 1, it is characterized in that: coupling device (4) adopts the hook mode, be that the front and left side of removable pontoon bridge framework (1) is coupling hook, after removable pontoon bridge framework (1) and the right is to coordinate the Link Port of hook with coupling hook.
7. sudden water pollution accident emergent treatment system as claimed in claim 1, it is characterized in that: at the upper and lower two ends of efficient adsorption plate (6), central part also is provided with for regulating the direction adjusting apparatus (8) of efficient adsorption plate (6) direction, upper and lower direction of both ends setting device (8) is connected, direction adjusting apparatus (8) adopts the screw tightening device, efficient adsorption panel assembly (3) bottom is provided with the efficient adsorption plate and is connected and fixed a little, is connected and fixed a little and is connected with the direction adjusting apparatus (8) of efficient adsorption plate (6) lower end central authorities.
CN2013203719296U 2013-06-26 2013-06-26 Emergency processing system for sudden water pollution accidents Withdrawn - After Issue CN203319737U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203719296U CN203319737U (en) 2013-06-26 2013-06-26 Emergency processing system for sudden water pollution accidents

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203719296U CN203319737U (en) 2013-06-26 2013-06-26 Emergency processing system for sudden water pollution accidents

Publications (1)

Publication Number Publication Date
CN203319737U true CN203319737U (en) 2013-12-04

Family

ID=49659106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203719296U Withdrawn - After Issue CN203319737U (en) 2013-06-26 2013-06-26 Emergency processing system for sudden water pollution accidents

Country Status (1)

Country Link
CN (1) CN203319737U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103332761A (en) * 2013-06-26 2013-10-02 长江水利委员会长江科学院 Sudden water pollution accident emergency treatment system
CN105883957A (en) * 2014-10-17 2016-08-24 北京圣海通科技有限公司 Water pollutant eliminating system with double fixed end arrangement
CN112850957A (en) * 2021-01-08 2021-05-28 刘孝金 Sewage treatment device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103332761A (en) * 2013-06-26 2013-10-02 长江水利委员会长江科学院 Sudden water pollution accident emergency treatment system
CN103332761B (en) * 2013-06-26 2014-07-09 长江水利委员会长江科学院 Sudden water pollution accident emergency treatment system
CN105883957A (en) * 2014-10-17 2016-08-24 北京圣海通科技有限公司 Water pollutant eliminating system with double fixed end arrangement
CN112850957A (en) * 2021-01-08 2021-05-28 刘孝金 Sewage treatment device
CN112850957B (en) * 2021-01-08 2022-07-12 山东沂蒙水务工程有限公司 Sewage treatment device

Similar Documents

Publication Publication Date Title
CN103332761B (en) Sudden water pollution accident emergency treatment system
CN101531405B (en) Process and device for movably adsorbing poisonous and harmful substances in natural water areas
CN203319737U (en) Emergency processing system for sudden water pollution accidents
KR20120017867A (en) Electrode for electrokinetic soil remediation and soil remediation system using the same
CN102372383A (en) Integrated restoring system for water body polluted by hydrochloric ether
CN102167424B (en) U-shaped flow treatment method for saliferous hardly degraded organic wastewater
CN102897867A (en) Connecting rod fluctuation type adsorption device applied to sudden water contamination emergency treatment
CN218403760U (en) Emergency device for reducing water pollution by trash adsorption
CN205045872U (en) Floating interception purifier that oxygenates
CN203558905U (en) Purification device for water quality of bay
CN107705868B (en) Radionuclide collection device in ocean
CN211226565U (en) Adsorption repairing filler for water body repairing wastewater treatment
CN211547659U (en) River course ecological protection environment prosthetic devices
CN101838026B (en) Adsorption dam for emergency treatment of sudden heavy metal pollution of natural water body
CN203474505U (en) Movable adsorption device for toxic and harmful substances in natural water area
CN103638903B (en) A kind of sorbing material and its preparation method
CN102249455B (en) Rural drinking water purification system with arsenic removal function
CN104628074B (en) Assembled emergency treatment device that a kind of easy accumulating being applied to sudden water pollution and fast-assembling are used and method
CN105664875A (en) Processing process of enteromorpha for sewage treatment
CN213475688U (en) Black and odorous water body treatment device
CN205328659U (en) A rescue system device for acute water pollution
CN218478552U (en) Farmland contains heavy metal sewage treatment plant
CN211141805U (en) Ecological restoration device for sewage draining outlet
CN211035317U (en) Graphene continuous filtering and adsorbing wastewater treatment device
CN217479224U (en) Permeable reaction wall for repairing underground water in shallow bed rock area

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20131204

Effective date of abandoning: 20140709

AV01 Patent right actively abandoned

Granted publication date: 20131204

Effective date of abandoning: 20140709

RGAV Abandon patent right to avoid regrant