CN203316011U - Structure for improving coal-fired boiler tail smoke denitration input rate - Google Patents

Structure for improving coal-fired boiler tail smoke denitration input rate Download PDF

Info

Publication number
CN203316011U
CN203316011U CN2013204215272U CN201320421527U CN203316011U CN 203316011 U CN203316011 U CN 203316011U CN 2013204215272 U CN2013204215272 U CN 2013204215272U CN 201320421527 U CN201320421527 U CN 201320421527U CN 203316011 U CN203316011 U CN 203316011U
Authority
CN
China
Prior art keywords
scr
coal
scr reactor
flue
input rate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013204215272U
Other languages
Chinese (zh)
Inventor
张方炜
陈赢展
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Power Engineering Co Ltd of China Power Engineering Consulting Group
Original Assignee
North China Electric Power Design Institute of China Power Engineering Consulting Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power Design Institute of China Power Engineering Consulting Group Corp filed Critical North China Electric Power Design Institute of China Power Engineering Consulting Group Corp
Priority to CN2013204215272U priority Critical patent/CN203316011U/en
Application granted granted Critical
Publication of CN203316011U publication Critical patent/CN203316011U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Chimneys And Flues (AREA)
  • Treating Waste Gases (AREA)

Abstract

The utility model discloses a structure for improving the coal-fired boiler tail smoke denitration input rate. The structure comprises an SCR reactor and an SCR upstream heat exchanger. A branch flue is formed between a first inlet flue of the SCR reactor and a second inlet flue of the SCR upstream heat exchanger. An adjustment stop plate is arranged on the branch flue. According to the structure, smoke on the high-temperature portions is led into the inlet of the SCR reactor, the temperature inside the SCR reactor can effectively rise, the temperature of the smoke at the inlet of the SCR reactor can be effectively guaranteed to be within the optimal reduction temperature range, and therefore the denitration input rate is improved. The structure for improving the coal-fired boiler tail smoke denitration input rate is simple in structure, low in manufacturing cost and capable of being popularized in multiple coal fired power stations.

Description

Improve the structure of coal-burning boiler tail flue gas denitration devoting rate
Technical field
The relevant energy-saving and emission-reduction of the utility model field, particularly a kind of structure that there is important function to improving coal-fired unit SCR denitrogenation devoting rate.
Background technology
China's energy resource structure be take coal as main, and in Technology of Electrical Power Generation, coal-fired unit occupies main share.At present, China's coal burning machine kludge has approached 80%, surpasses nearly 40 percentage points of world average level.In the coal resources upstream, because Coal Quality can not get paying attention to, downstream often occurs that coal quality changes greatly, causes boiler coke, undercapacity, even pollutant emission exceeds standard.Especially aspect pollutant emission, under the appearance of a series of policies and regulations of country (especially " fossil-fuel power plant atmospheric pollutant emission standard 2011 "), electricity power enterprise continues to increase under pressure, even the environmental protection equipment design is qualified, but under the condition of extraneous ature of coal fluctuation, the pollutant removing condition can not meet, and causes pollutant to exceed standard.
For NOx removes, at coal type change, particularly, in the performing low-load running of machine set situation, SCR reactor inlet flue-gas temperature is on the low side, has a strong impact on the denitration devoting rate.The cardinal principle of SCR denitride technology is, ammonia is reacted with nitrogen oxide, generates nitrogen and water, and precondition is to have catalyst (as vanadic anhydride) and rational reaction temperature (300 ℃~420 ℃).But due to the ature of coal reason, often occur the too low situation of temperature in the SCR reactor, and some unit, for a long time in the underrun state, causes and can't normally spray ammonia at present, has a strong impact on denitration efficiency.Part electricity power enterprise, for improving denitration efficiency, adopts the method that strengthens the ammonia amount, has not only increased the denitrogenation cost, and may cause ammonia leakage, causes secondary pollution.
The utility model content
The technical problem that the utility model solves is providing a kind of structure that can improve the SCR reactor inlet temperature, practical operation situation according to unit, reasonable approach is for improving the SCR reactor inlet temperature the most, the raising of flue-gas temperature also is conducive to the operation of downstream air preheater, to improving first and second air temperature, prevent that the air preheater cold end corrosion from having played certain effect.
The technological means that the utility model adopts is: a kind of structure that improves coal-burning boiler tail flue gas denitration devoting rate, it comprises SCR reactor and SCR upstream heat exchanger, be provided with by-pass flue between second gas approach of in the first gas approach and the heat exchange of SCR upstream of SCR reactor, answering device, this by-pass flue is provided with controllable register.
The beneficial effect that the utility model produces is as follows: the present invention introduces the SCR reactor inlet by the high temperature position flue gas, can effectively improve SCR inside reactor temperature, can effectively guarantee that SCR reactor inlet flue-gas temperature is within best reduction temperature scope, thereby improve the denitrogenation devoting rate.The utility model is simple in structure, cheap, can in numerous coal fired power plants, promoted.
In addition, the present invention also possesses following advantage.
(1) the present invention only need be installed by-pass flue additional at SCR entrance pipeline section place and its heat transmission equipment entrance pipeline section place, upstream, and remodeling method is simple, and with low cost.
(2) the present invention is in actual moving process, and the valve that only needs to regulate on by-pass flue can conveniently be controlled the SCR inlet temperature, simple and easy to do.
(3) the present invention also is conducive to optimization downstream, downstream air preheater operating condition, and then improves whole boiler efficiency.
(4) the present invention has certain coordinative role to the heat distribution of boiler part heat transmission equipment.
The accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
The specific embodiment
As shown in Figure 1, a kind of structure that improves coal-burning boiler tail flue gas denitration devoting rate, it comprises SCR reactor 4 and SCR upstream heat exchanger 3, be provided with by-pass flue 1 between second gas approach 31 of in the first gas approach 41 and the heat exchange of SCR upstream of SCR reactor 4, answering device 3, this by-pass flue 1 is provided with controllable register 2.
In the situation that in the first gas approach 41 of SCR reactor 4, flue-gas temperature is on the low side, by regulating the controllable register 2 on by-pass flue 1, the flue gas of the second gas approach 31 positions of upstream heat exchanger 3 can be imported, rationally to control the high-temperature flue gas flow, improve the catalytic reduction reaction temperature, and then improve the denitrogenation devoting rate.Wherein, this upstream heat exchanger 3 can be generally low-level (stack-gas) economizer, superheater or reheater etc.

Claims (1)

1. a structure that improves coal-burning boiler tail flue gas denitration devoting rate, it comprises SCR reactor and SCR upstream heat exchanger, it is characterized in that, be provided with by-pass flue between second gas approach of in the first gas approach and the heat exchange of SCR upstream of SCR reactor, answering device, this by-pass flue is provided with controllable register.
CN2013204215272U 2013-07-16 2013-07-16 Structure for improving coal-fired boiler tail smoke denitration input rate Expired - Fee Related CN203316011U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013204215272U CN203316011U (en) 2013-07-16 2013-07-16 Structure for improving coal-fired boiler tail smoke denitration input rate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013204215272U CN203316011U (en) 2013-07-16 2013-07-16 Structure for improving coal-fired boiler tail smoke denitration input rate

Publications (1)

Publication Number Publication Date
CN203316011U true CN203316011U (en) 2013-12-04

Family

ID=49655413

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013204215272U Expired - Fee Related CN203316011U (en) 2013-07-16 2013-07-16 Structure for improving coal-fired boiler tail smoke denitration input rate

Country Status (1)

Country Link
CN (1) CN203316011U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104132358A (en) * 2014-06-12 2014-11-05 广东电网公司电力科学研究院 Coal-fired power plant boiler system suitable for low-load operation and combustion adjusting method of boiler system
CN105423322A (en) * 2015-12-17 2016-03-23 华电郑州机械设计研究院有限公司 Low-load system increasing denitration flue gas temperature
CN109876662A (en) * 2019-04-19 2019-06-14 中国科学院过程工程研究所 SCR denitration system and method for denitration suitable for cement producing line kiln exit gas

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104132358A (en) * 2014-06-12 2014-11-05 广东电网公司电力科学研究院 Coal-fired power plant boiler system suitable for low-load operation and combustion adjusting method of boiler system
CN105423322A (en) * 2015-12-17 2016-03-23 华电郑州机械设计研究院有限公司 Low-load system increasing denitration flue gas temperature
CN109876662A (en) * 2019-04-19 2019-06-14 中国科学院过程工程研究所 SCR denitration system and method for denitration suitable for cement producing line kiln exit gas

Similar Documents

Publication Publication Date Title
CN204395778U (en) A kind of ultra-clean exhaust system for fluidized-bed combustion boiler
CN104296543A (en) Denitration and waste heat recovery integrated furnace
CN204710105U (en) A kind of full load equipment for denitrifying flue gas of Industrial Boiler
CN103277788A (en) SCR temperature regulating system of boiler and method for regulating smoke temperature of SCR inlet of boiler
CN203927880U (en) A kind of economizer that improves SCR system underrun denitration ability
CN203316011U (en) Structure for improving coal-fired boiler tail smoke denitration input rate
CN203517748U (en) Temperature controllable coal economizer
CN208786167U (en) A kind of system of the wide load denitration of air water cooperative achievement
CN205447779U (en) Prevent gas temperature governing system of SCR flue gas denitration system sintering of catalyst
CN110822461A (en) Method for realizing wide-load denitration by bypass grading economizer
CN203364109U (en) SCR temperature regulating system of boiler
CN202762308U (en) Deep energy-saving system based on flue gas desulfurization and denitrification process optimization
CN202018186U (en) System using boiler flue gas waste heat for drying brown coal
CN204395745U (en) A kind of clean exhaust system for fluidized-bed combustion boiler
CN203940456U (en) A kind of high-efficient energy-saving environment friendly heat energy utilization system taking fine coal as fuel
CN203784915U (en) Working temperature control device of SCR (selective catalytic reduction) denitrification reactor of thermal power plant
CN207237700U (en) Flue-gas denitration process system
CN203595114U (en) Natural circulation drum boiler with smoke warning system
CN202769702U (en) Closing-to-wall air adding device on sidewall of opposed firing boiler
CN103900073A (en) Economizer for improving denitrification capacity of SCR system during low-load operation
CN203927879U (en) A kind of economizer that improves SCR operational percentage under running on the lower load
CN107152673A (en) A kind of device for improving coal-fired electric generation furnace denitration inlet flue gas temperature
CN203963976U (en) Be suitable for the coal-fired plant boiler system of underrun
CN103343953A (en) Forced circulation drum boiler with smoke temperature rising system
CN203075835U (en) Accident spraying system for preventing SCR (Selective Catalytic Reduction) denitration catalyst from overheating

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA POWER ENGINEERING CONSULTING GROUP NORTH CHI

Free format text: FORMER NAME: NORTH CHINA ELECTRIC POWER DESIGN INSTITUTE OF CHINA POWER ENGINEERING CONSULTING GROUP CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 100120 Beijing city Xicheng District Street No. 24

Patentee after: NORTH CHINA POWER ENGINEERING CO., LTD. OF CHINA POWER ENGINEERING CONSULTING Group

Address before: 100120 Beijing city Xicheng District Street No. 24

Patentee before: NORTH CHINA POWER ENGINEERING CO., LTD. OF CHINA POWER ENGINEERING CONSULTING Group

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131204