CN203297798U - High pressure delivery pipeline pipe end connector structure - Google Patents

High pressure delivery pipeline pipe end connector structure Download PDF

Info

Publication number
CN203297798U
CN203297798U CN2013203149697U CN201320314969U CN203297798U CN 203297798 U CN203297798 U CN 203297798U CN 2013203149697 U CN2013203149697 U CN 2013203149697U CN 201320314969 U CN201320314969 U CN 201320314969U CN 203297798 U CN203297798 U CN 203297798U
Authority
CN
China
Prior art keywords
pipe
pipe end
high pressure
outer sleeve
inner embedded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2013203149697U
Other languages
Chinese (zh)
Inventor
沈金章
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Jinding Oil Pipe Fittings Co Ltd
Original Assignee
Wuxi Jinding Oil Pipe Fittings Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Jinding Oil Pipe Fittings Co Ltd filed Critical Wuxi Jinding Oil Pipe Fittings Co Ltd
Priority to CN2013203149697U priority Critical patent/CN203297798U/en
Application granted granted Critical
Publication of CN203297798U publication Critical patent/CN203297798U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Pipeline Systems (AREA)

Abstract

The utility model discloses a high pressure delivery pipeline pipe end connector structure. The high pressure delivery pipeline pipe end connector structure comprises an inner embedded pipe, an outer sleeve and two pipe end structures, wherein the two pipe end structures are connected through the inner embedded pipe, and the two ends of the inner embedded pipe are inserted into the two pipe end structures; a thread is arranged outside each pipe end structure, and the outer sleeve is connected with the two pipe end structures through the threads; an annular step surface is arranged on the inner side of the end portion of each pipe end structure, wherein the radial width of the annular step surface is equal to the thickness of the inner embedded pipe, the inner embedded pipe is made to be installed inside the annular step surface in an embedded mode, and a sealing gasket is arranged between the inner embedded pipe and the annular step surface. According to the high pressure delivery pipeline pipe end connector structure, the two pipe end structures are connected through the outer sleeve, and the inner embedded pipe tightly abuts against the sealing gaskets between the two pipe end structures so as to realize sealing connection; due to the existence of the outer sleeve, the inner embedded pipe can bear pressure; besides, the tension of the inner embedded pipe is restricted by the annular step surfaces, and therefore the effect that the inner embedded pipe is in tight fit with the pipe end structures can be ensured.

Description

A kind of high pressure delivery pipes pipe end interface structure
Technical field
The utility model relates to a kind of high pressure delivery pipes pipe end interface structure, belongs to high-pressure delivery petroleum pipeline technical field.
Background technique
Sealing problem after the petroleum pipeline docking is a very important problem, prior art often uses flange-interface connect and seal, its structure is comparatively complicated, and the pulling force that in the process of flange-interface sealing, bolt bears is larger, the pulling force that bolt bears is delivered on flange, also easily flange is brought damage, so higher to the requirement of flange.Simultaneously, owing to bearing for a long time large effect of stress, the bolt that flange and adpting flange are used after using a period of time, will inevitably produce the fatigue stress phenomenon, so more of a specified duration more easily appearance of service time damages.
Simultaneously, in the process of high pressure, conveying at a high speed, the sealing under the pipe high-pressure environment is also the technical problem that prior art faces due to petroleum pipeline, adopts conventional flange to connect and can not meet the high pressure that day by day increases, the requirement that high speed is carried.
The model utility content
In order to solve the excessive technical problem of pipe end constructions seal structure complex, stress of petroleum pipeline, solve simultaneously the problem of petroleum pipeline pressure-bearing, the utility model provides a kind of high pressure delivery pipes pipe end interface structure.
The purpose of this utility model is carried out specific implementation by the following technical programs:
a kind of high pressure delivery pipes pipe end interface structure, comprise embedded pipe, outer sleeve and two pipe end constructions, connect by embedded pipe between two described pipe end constructions, it is inner that two described pipe end constructions are inserted at the two ends of described embedded pipe, the outside of each pipe end constructions is provided with screw thread, described outer sleeve is connected with two pipe end constructions by screw thread, the inboard, end of each described pipe end constructions is provided with the annular table terrace, radial width at described annular table terrace is identical with the thickness of described embedded pipe, make described embedded pipe built be arranged on the annular table terrace inner, tell between the annular table terrace and be provided with sealing gasket at described embedded pipe and institute.
The middle part of described outer sleeve is provided with integrated hexagon nut structure.
a kind of high pressure delivery pipes pipe end interface structure described in the utility model, by outer sleeve, two pipe end constructions are connected, and be tightly connected by embedded pipe top tight sealing pad and then realization between two pipe end constructions, existence due to outer sleeve, embedded pipe itself can pressure-bearing, and by the tension force of ring-shaped step in the face of embedded pipe, limited, can guarantee that embedded tube and tube end structure closely cooperates, and because sealing gasket itself does not contact with ambient air, so can extend the working life of sealing gasket, delay the deterioration phenomenon of sealing gasket, and reduce the problem of the corrosion of sealing gasket.
Description of drawings
Below according to drawings and embodiments the utility model is described in further detail.
Fig. 1 is a kind of structural drawing of high pressure delivery pipes pipe end interface structure.
In figure: 1, embedded pipe; 2, outer sleeve; 3, pipe end constructions; 4, hexagon nut structure.
Embodiment
as shown in Figure 1, the described a kind of high pressure delivery pipes pipe end interface structure of the utility model embodiment, comprise embedded pipe, outer sleeve and two pipe end constructions, connect by embedded pipe between two described pipe end constructions, it is inner that two described pipe end constructions are inserted at the two ends of described embedded pipe, the outside of each pipe end constructions is provided with screw thread, described outer sleeve is connected with two pipe end constructions by screw thread, the inboard, end of each described pipe end constructions is provided with the annular table terrace, radial width at described annular table terrace is identical with the thickness of described embedded pipe, make described embedded pipe built be arranged on the annular table terrace inner, tell between the annular table terrace and be provided with sealing gasket at described embedded pipe and institute.
The middle part of described outer sleeve is provided with integrated hexagon nut structure.
a kind of high pressure delivery pipes pipe end interface structure described in the utility model, by outer sleeve, two pipe end constructions are connected, and be tightly connected by embedded pipe top tight sealing pad and then realization between two pipe end constructions, existence due to outer sleeve, embedded pipe itself can pressure-bearing, and by the tension force of ring-shaped step in the face of embedded pipe, limited, can guarantee that embedded tube and tube end structure closely cooperates, and because sealing gasket itself does not contact with ambient air, so can extend the working life of sealing gasket, delay the deterioration phenomenon of sealing gasket, and reduce the problem of the corrosion of sealing gasket.

Claims (2)

1. high pressure delivery pipes pipe end interface structure, it is characterized in that, comprise embedded pipe, outer sleeve and two pipe end constructions, connect by embedded pipe between two described pipe end constructions, it is inner that two described pipe end constructions are inserted at the two ends of described embedded pipe, the outside of each pipe end constructions is provided with screw thread, described outer sleeve is connected with two pipe end constructions by screw thread, the inboard, end of each described pipe end constructions is provided with the annular table terrace, radial width at described annular table terrace is identical with the thickness of described embedded pipe, make described embedded pipe built be arranged on the annular table terrace inner, tell between the annular table terrace and be provided with sealing gasket at described embedded pipe and institute.
2. a kind of high pressure delivery pipes pipe end interface structure as claimed in claim 1, is characterized in that, the middle part of described outer sleeve is provided with integrated hexagon nut structure.
CN2013203149697U 2013-06-04 2013-06-04 High pressure delivery pipeline pipe end connector structure Expired - Fee Related CN203297798U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013203149697U CN203297798U (en) 2013-06-04 2013-06-04 High pressure delivery pipeline pipe end connector structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013203149697U CN203297798U (en) 2013-06-04 2013-06-04 High pressure delivery pipeline pipe end connector structure

Publications (1)

Publication Number Publication Date
CN203297798U true CN203297798U (en) 2013-11-20

Family

ID=49573805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013203149697U Expired - Fee Related CN203297798U (en) 2013-06-04 2013-06-04 High pressure delivery pipeline pipe end connector structure

Country Status (1)

Country Link
CN (1) CN203297798U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103292089A (en) * 2013-06-04 2013-09-11 无锡金顶石油管材配件制造有限公司 Pipe-end port structure for high-pressure delivery pipelines
CN106595316A (en) * 2016-11-30 2017-04-26 宝钢工程技术集团有限公司 Metallurgical spray gun with replaceable gun head
CN106595317A (en) * 2016-11-30 2017-04-26 宝钢工程技术集团有限公司 Multifunctional metallurgical spray gun

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103292089A (en) * 2013-06-04 2013-09-11 无锡金顶石油管材配件制造有限公司 Pipe-end port structure for high-pressure delivery pipelines
CN106595316A (en) * 2016-11-30 2017-04-26 宝钢工程技术集团有限公司 Metallurgical spray gun with replaceable gun head
CN106595317A (en) * 2016-11-30 2017-04-26 宝钢工程技术集团有限公司 Multifunctional metallurgical spray gun

Similar Documents

Publication Publication Date Title
CN202647010U (en) Withhold type hose sealing joint
CN203297798U (en) High pressure delivery pipeline pipe end connector structure
CN201615300U (en) High-pressure pipeline flange connecting structure
CN203297793U (en) Embedded sealing connector structure of high-pressure conveying pipeline
CN202452002U (en) Groove-type movable joint
CN203384527U (en) Pipe connector
CN204647617U (en) Hair power station cooling water pipeline
CN103292089A (en) Pipe-end port structure for high-pressure delivery pipelines
CN204254022U (en) A kind of valve cutting ferrule linkage structure
CN204005015U (en) Seal assembly
CN104565626A (en) Auxiliary sealing structure for spherical joint
CN203297797U (en) High pressure delivery pipeline embedded connector structure
CN203297794U (en) High pressure delivery pipeline contact seal connector structure
CN203297792U (en) Pipe end port structure of petroleum pipeline
CN104633324A (en) Pipe spherical joint reinforcement sealing structure
CN203614947U (en) Engine joint component
CN203273106U (en) Embedded type high-pressure petroleum transportation pipeline
CN203273107U (en) Embedded type high-pressure petroleum transportation pipeline
CN103292081A (en) Embedded sealing port structure for high-pressure delivery pipelines
CN203517068U (en) High-pressure connector
CN203297805U (en) Embedded type high-pressure petroleum conveying pipeline
CN103292082B (en) Embedded port structure for high-pressure delivery pipelines
CN203273080U (en) High-pressure conveying pipeline
CN204704505U (en) Novel common movable pipe joint
CN202118417U (en) 45-degree-buckling hose connector with screw nut

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131120

Termination date: 20140604