CN203296395U - Reserved spool goes out floor finished product protection device - Google Patents
Reserved spool goes out floor finished product protection device Download PDFInfo
- Publication number
- CN203296395U CN203296395U CN2013202375332U CN201320237533U CN203296395U CN 203296395 U CN203296395 U CN 203296395U CN 2013202375332 U CN2013202375332 U CN 2013202375332U CN 201320237533 U CN201320237533 U CN 201320237533U CN 203296395 U CN203296395 U CN 203296395U
- Authority
- CN
- China
- Prior art keywords
- protection device
- finished product
- goes out
- product protection
- out floor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009408 flooring Methods 0.000 claims description 8
- 238000003466 welding Methods 0.000 claims description 6
- 239000002699 waste material Substances 0.000 abstract description 5
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 239000000047 product Substances 0.000 description 8
- 230000003014 reinforcing effect Effects 0.000 description 5
- 238000009434 installation Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 238000004064 recycling Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 239000012467 final product Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses a reserve spool goes out floor finished product protection device, fixed foot (2) are 3, 3 fixed foot (2) circumference evenly weld on the outer circumference of sleeve pipe (1). Simple manufacture, simple to operate are swift, the waste material is recycled and is practiced thrift the cost. The utility model relates to a more reliable reservation spool goes out floor finished product protection device, simple manufacture, simple to operate are swift, waste material recycle, low cost's protection device.
Description
Technical field
The utility model relates to a kind of construction finished product protective device, particularly relates in some large-scale Gongjian's project construction processes and reserves the finished product protection device that spool goes out flooring.
Background technology
In set aside pre-embedded spool work progress is installed; for guaranteeing the accurate positioning at each pre-stationary point of spool; need be at place, the pre-stationary point of each spool welded reinforcement as an overfill protection; and in some large-scale commercial buildings or Gongjian's project, the reserved spool strong point of its large span flooring can't fix, very easily smash easily that spool causes pre-embedded pipe to stop up, waste of material is serious when off normal, form removable etc.
The utility model content
Technical problem to be solved in the utility model be to provide a kind of fabrication and installation efficiently reserved spool go out flooring finished product protection device.
In order to solve the problems of the technologies described above, the reserved spool that the utility model provides goes out flooring finished product protection device, and fixing feet is 3, and 3 circumferential uniform weldings of described fixing feet are on the excircle of sleeve pipe.
Adopt the reserved spool of technique scheme to go out flooring finished product protection device; utilize the remaining waste-material-preparing packaged tube of on-the-spot pipe laying; utilize building site reinforcing bar waste-material-preparing apparatus for converting fixing feet; Construction in Preparatory Stage can be processed prefabricated, greatly shorten installation period, make simple, quick and easy for installation, the waste material recycling is cost-saving.
The utility model finished product protection device; in work progress; by Design Requirement Drawing, accurately find fast the position of this reserved spool, adopt spot welding or tied silk colligation and baseplate reinforcing bar to fix in this device, not only guarantee the accuracy of locating but also can better protect reserved spool.
The utility model is that a kind of reliable reserved spool goes out flooring finished product protection device, makes simple, quick and easy for installation, waste material recycling, protective device with low cost.
The accompanying drawing explanation
Fig. 1 is the utility model side structure schematic diagram.
Fig. 2 is the utility model plane structure schematic diagram.
The specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.
Referring to Fig. 1 and Fig. 2,3 circumferential uniform weldings of fixing feet 2 are on the excircle of sleeve pipe 1.
Referring to Fig. 1 and Fig. 2, device is made: sleeve pipe 1 adopts the remaining coating steel pipe of building-site or welded steel pipe clout, diameter is DN32-DN50, concrete size is determined by the radical of reserved spool, cut into the short tube of 50mm length, the reinforcing bar clout of Φ 6 or Φ 8 is chosen at fixing feet 2 scenes, and reinforcing bar end bending length 50mm can complete making with the sleeve pipe welding.
Device is installed: according to Design Requirement Drawing, accurately find the position of this reserved spool, this novel practical device is fixed on herein, and the device fixed form is to adopt spot welding or tied silk to bundle with baseplate reinforcing bar end pin sweep, and the later stage spool lays and passes sleeve pipe and get final product.
Claims (1)
1. a reserved spool goes out flooring finished product protection device, it is characterized in that: fixing feet (2) is 3, and the circumferential uniform welding of 3 described fixing feet (2) is on the excircle of sleeve pipe (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013202375332U CN203296395U (en) | 2013-05-03 | 2013-05-03 | Reserved spool goes out floor finished product protection device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013202375332U CN203296395U (en) | 2013-05-03 | 2013-05-03 | Reserved spool goes out floor finished product protection device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203296395U true CN203296395U (en) | 2013-11-20 |
Family
ID=49572416
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013202375332U Expired - Fee Related CN203296395U (en) | 2013-05-03 | 2013-05-03 | Reserved spool goes out floor finished product protection device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203296395U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109339469A (en) * | 2018-11-16 | 2019-02-15 | 上海宝冶集团有限公司 | The protective device of spool at hand hole is reserved when a kind of lifting for PC plate |
-
2013
- 2013-05-03 CN CN2013202375332U patent/CN203296395U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109339469A (en) * | 2018-11-16 | 2019-02-15 | 上海宝冶集团有限公司 | The protective device of spool at hand hole is reserved when a kind of lifting for PC plate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103061504B (en) | Concrete slab Pipe installing hole to be provided construction mould and construction method | |
CN201474095U (en) | Combined connection device of reverse construction concrete beam steel bar and positive construction type steel column | |
CN203296395U (en) | Reserved spool goes out floor finished product protection device | |
CN202611719U (en) | Device for controlling thickness of tunnel secondary lining steel bar protection layer | |
CN204626453U (en) | The supporting device of pipeline in Urban Underground pipe gallery | |
CN103924679B (en) | Prestressed concrete beam and circular steel pipe concrete column combined joint connected with regular rebars | |
CN203050108U (en) | Concrete slab pipe installation reserved hole construction mold | |
CN202611223U (en) | Recyclable bolt type scaffold wall connection piece | |
CN204343343U (en) | Reflection wave method pipe location quick access device | |
CN104295082A (en) | Method for recycling anchor ring of steel beam of overhanging frame and anchor ring component used by method | |
CN204139622U (en) | Adjustable segmented column steel bar positioning fixture | |
CN201177107Y (en) | Convenient construction pipe fitting | |
CN103306473A (en) | Tool type anchoring part for overhanging scaffold | |
CN202787020U (en) | Road engineering dowel bar localizer | |
CN202273402U (en) | A vertical steel pipe spreading device | |
CN210766402U (en) | Steel strand wires draw gear | |
CN203569558U (en) | Bored pile reinforcement cage locating device | |
CN102477771A (en) | Method for reinforcing node between plastic steel pipe concrete column and steel frame beam | |
CN103556825A (en) | Construction method for reserved pipe sleeve in concrete of structural layers of high-rise building | |
CN204139162U (en) | Concrete tubular pile pile splicing structure | |
CN102995890A (en) | Scaffold hard tying device capable of realizing efficient recycling | |
CN107525594A (en) | A kind of new embedded concrete temperature tube and installation method | |
CN205008515U (en) | Drag hook muscle post forming instrument | |
CN204299190U (en) | A kind of portable concrete strip thickness control device | |
CN207092538U (en) | The reserved and fixed structure at hole in a kind of aluminum alloy formwork system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131120 Termination date: 20180503 |
|
CF01 | Termination of patent right due to non-payment of annual fee |