CN201474095U - Combined connection device of reverse construction concrete beam steel bar and positive construction type steel column - Google Patents

Combined connection device of reverse construction concrete beam steel bar and positive construction type steel column Download PDF

Info

Publication number
CN201474095U
CN201474095U CN2009202094099U CN200920209409U CN201474095U CN 201474095 U CN201474095 U CN 201474095U CN 2009202094099 U CN2009202094099 U CN 2009202094099U CN 200920209409 U CN200920209409 U CN 200920209409U CN 201474095 U CN201474095 U CN 201474095U
Authority
CN
China
Prior art keywords
concrete beam
executing
steel column
reinforcing
execute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009202094099U
Other languages
Chinese (zh)
Inventor
陈学光
杨红岩
郑春华
王岩峰
王东
亓立刚
崔爱珍
陈玉德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN2009202094099U priority Critical patent/CN201474095U/en
Application granted granted Critical
Publication of CN201474095U publication Critical patent/CN201474095U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to a combined connection device of a reverse construction concrete beam steel bar and a positive construction type steel column. The reverse construction concrete beam steel bar and the positive construction type steel column are connected by a positive construction concrete beam; the connection device comprises a weldable straight-thread sleeve with the internal surface being straight thread, and a welding joint of a fusion channel wall rod; the reverse construction concrete beam steel bar reserves a section of steel bar at the outer side of a reverse construction structure; the weldable straight-thread sleeve is welded on the positive construction type steel column; one end of a longitudinal steel bar of the positive construction concrete beam is connected with the weldable straight-thread sleeve, and the other end thereof is connected with the reserved section of the reverse construction concrete beam steel bar by the welding joint of the fusion channel wall rod. The welding joint of the fusion channel wall rod and the connecting joint of the weldable straight-thread sleeve in the combined connection device can all reach the mechanical index which is equal to or even super higher to the strength of a base material.

Description

Inverse concrete beam reinforcing with just executing the steel column combined connection apparatus
Technical field
The utility model is a kind of against executing concrete beam reinforcing and just executing the steel column combined connection apparatus, especially refer to a kind of against executing concrete beam reinforcing and just executing steel column " but molten ledge bar weldering+welded sleeve " combined connection apparatus, it is a kind of reinforcing bar nodal connection device of reverse construction, affiliated science and technology field is engineering construction, and affiliated specialty is building structure and construction technology.
Background technology
Contrary sequence method is a kind of construction technology of building foundation pit supporting, and it reaches the purpose of supporting foundation pit by rationally utilizing the drag of building underground structure self.Contrary sequence method has that foundation pit deformation is little, support and engineering structures unite two into one and have advantages such as tangible economic benefit to be used in deep-foundation pit engineering, particularly in large-scale and core area, megapolis underground space development, the super large ultra-deep foundation pit adopts " reverse construction " economic benefit more remarkable.But reverse construction is compared with traditional suitable practice, also has that difficulty of construction is big, complicated construction technique, supporting construction connected node and just inverse connected node need to carry out the problems such as specially treated.The experience that adopts reverse construction was abroad just arranged before 30 years, and particularly in Japan, the practice of reverse construction and research have accumulated a large amount of experiences.China also adopted reverse construction in nearly ten years successively, had obtained rich practice experience equally, and increasing now large-scale base pit engineering has adopted the reverse construction technology.
In the reverse construction, just executing structure and contrary to execute being connected of structure be one of difficult point of reverse construction always, particularly in the super highrise building reverse construction, if just executing structural column steel column or reinforced concrete composite structure post, because of the operating space is restricted, contrary execute concrete beam reinforcing and just execute steel column and be connected difficult more.Traditional just inverse structure reinforcing bars connects, and generally select the modes such as straight screw sleeve, overlap welding, side bar weldering to connect, but above-mentioned several connected mode all exists drawback.
Straight screw sleeve be connected inverse during supporting construction reserved steel bar length can reduce, it has increased inverse operating space; But for huge ultradeep foundation pit, inverse time phase is generally longer, reserved steel bar silk head protection difficulty, to just execute phase reserved steel bar silk head may be destroyed; And weldable steel muscle branch sleeve (such as reinforced concrete composite structure) decentraction on beam reserved steel bar position and the later stage steel column during inverse, the above-mentioned two situations straight screw sleeve connects all can't guarantee quality of connection; Inverse beam reserved steel bar is when just executing steel column and be connected, and reserved steel bar and steel column are all located, adopts straight screw sleeve to connect to need reinforcing bar to rotate flexible, but being scale, this position reinforcing bar connects, and not flexible, the ordinary straight screw shell can't connect at all.
Overlap welding, side bar weldering operating procedure are simple, and the reserved steel bar joint need not special protection, satisfies weld length and can weld; But inverse phase reinforcing bar length in reserve is long than the straight screw sleeve connected mode, and inverse operating space is impacted; When inverse structure limit to just executing space, profile steel concrete column limit littler (the adjacent splice of regulation and stipulation stagger 35d all can not satisfy), if a beam steel joint part is positioned at structural column, overlap welding or side bar welding steel muscle tie up the reinforcing bars of structural columns position, and reinforcing bars of structural columns can't colligation; Big when the structural beams bar diameter, row is many, spacing hour between the single reinforcing bar, welding quality is difficult to guarantee, bar spacing is too small and affect concrete pouring quality after the welding.
Summary of the invention
Because above-mentioned existing inverse concrete beam reinforcing and the deficiency of just executing the steel column jockey, the technical problem that solve is: provide a kind of and solve inverse concrete beam reinforcing and just execute steel column and be connected difficult jockey.
For solving the problems of the technologies described above, the utility model provides a kind of tensile strength etc. strong or surpass the mother metal tensile strength properties, can realize just connecting under the narrow space against executing structure, the contrary concrete beam reinforcing and the combined connection apparatus of just executing steel column " but molten ledge bar weldering+welded sleeve " executed of easy construction, this linkage can be widely used in two ends and be fixed (as being steel column against the structure of just executing of executing connecting portion just), common straight thread connecting sleeve can't be constructed, just contrary executing connects reserved steel bar off normal silk head and can't be screwed in the straight screw sleeve and reinforcing bar connects intensive, the just contrary connecting portion of executing that the operating space is little.
A kind of inverse concrete beam reinforcing with just executing the steel column combined connection apparatus, be connected just to execute beams of concrete with just executing between the steel column at inverse concrete beam reinforcing, this jockey comprises welded straight screw sleeve and the molten ledge bar weldering welding point that an inner surface is straight thread, this inverse concrete beam reinforcing is reserved with one section reinforcing bar in the outside of inverse structure, the described straight screw sleeve that welds is welded on and just executes on the steel column, this is just being executed beams of concrete longitudinal reinforcement one end and can weld straight screw sleeve and be connected, and the other end is connected with one section inverse concrete beam reinforcing of described reservation by described molten ledge bar weldering welding point;
The described beams of concrete longitudinal reinforcement of just executing is processed formed straight thread silk head end with welding the end that straight screw sleeve is connected for the straight thread mantle fiber, and with the other end of molten ledge bar weldering welding point welding for adopting the flat formed flush end of cutting of anodontia sawing;
Described molten ledge bar weldering welding point comprises an angle steel;
The described beams of concrete longitudinal reinforcement of just executing fuses by welding with the end of reserving inverse concrete beam reinforcing, and the fillet in parallel shear between reinforcing bar and the angle steel is at least three layers;
Described against executing the concrete beam reinforcing length in reserve greater than 60mm.
Adopt reinforcing bar combined connection apparatus of the present utility model, in construction following advantage arranged:
1. can solve because of inverse time phase long, to just executing a phase reserved steel bar straight thread silk subject to severe risks of damage, and cause the problem that can not use straight screw sleeve to connect, and can realize steel bar connector with parent material of reinforcement rebar tensile strength, quality of connection is reliable.
2. contrary when executing the beam reserved steel bar and being connected with steel column, all locate against executing structure and just executing steel column, reinforcing bar is that scale connects, and not flexible adopts " but molten ledge bar weldering+welded sleeve " reinforcing bar combined connection apparatus to solve the problem that the ordinary straight screw shell can't connect at all.
3. adopt " but molten ledge bar weldering+welded sleeve " reinforcing bar combined connection apparatus, stretch out the length of inverse structure reserved steel bar as long as can connect greater than 60mm, for inverse structure and the follow-up construction of just executing structure all provide relatively rich operating space, reduced difficulty of construction.
4. molten ledge bar plumb joint volume and action required space are more much smaller than side bar weldering and overlap welding, when structural beams bar diameter and density are all big, adopt " but molten ledge bar weldering+welded sleeve " reinforcing bar combined connection apparatus, can guarantee welding quality of reinforcing steel, bar spacing changes not quite after the welding, does not affect concrete pouring quality.
5. the contrary beam reserved steel bar of executing is a problem that is difficult to solution in the reverse construction with just executing the beam steel decentraction, straight thread connecting sleeve can't use because of can not or not being screwed into fully, can be before adopting molten ledge bar weldering to connect with the reinforcing bar pre-bending of joint both sides, can weld connection behind the essentially concentric, solve the reinforcing bar decentraction and connected difficult problem.
Description of drawings
Fig. 1 for inverse concrete beam reinforcing of the present utility model with just execute steel column and be connected top view;
Fig. 2 is the sectional drawing of Fig. 1 along A-A;
Fig. 3 is a connection diagram of welding straight screw sleeve of the present utility model;
Fig. 4 is a molten ledge bar welding steel muscle connected node top view of the present utility model;
Fig. 5 is the sectional drawing of Fig. 4 along B-B;
Fig. 6 is the sectional drawing of Fig. 4 along C-C.
The specific embodiment
Inverse concrete beam reinforcing of the present utility model with just executing the steel column combined connection apparatus, its structure connects as shown in Figures 1 and 2, is just executing steel column 20 and is being connected by just executing beams of concrete 30 with inverse structure 10; During inverse the beam steel 11 of inverse structure 10 is reserved; During just executing earlier lifting be welded with can weld straight screw sleeve 40 just execute steel column 20, longitudinal reinforcement 31 1 ends that to just execute then beams of concrete 30 with can weld straight screw sleeve 40 and be connected, the other end links together by the reservation beam steel 11 of molten ledge bar weldering welding point 50 with inverse structure 10, last colligation beams of concrete stirrup 32, complete and other operations are finished the after-pouring concrete in beam stirrup 32 whole colligations, the most inverse structure 10 with just execute steel column 20 and reliably be connected.
Of the present utility model against executing concrete beam reinforcing and just executing the steel column combined connection apparatus, it is the linkage of " but molten ledge bar weldering+welded sleeve ", as shown in Figures 1 and 2, engineering shown in the figure is a reinforced concrete composite structure, foundation ditch is a reverse construction, has reserved the contrary concrete beam reinforcing 11 of executing in the contrary outside of executing structure 10 earlier during contrary the executing, and reserves connected mode and is molten ledge bar weldering, the reinforcing bar length in reserve is greater than 60mm, and the concrete length in reserve of present embodiment is 100mm; During just executing, just executing steel column 20 when produce in factory, is that the welded straight screw sleeve 40 of straight thread welds with steel column 20 with inner surface, is welded with the steel column 20 that can weld straight screw sleeve 40 and makes to finish and be transported to job site lifting earlier and put in place.
The job site will be reserved the termination of beam steel 11 reservations and clean out, measure and reserve beam steel 11 to the concrete size between the steel column 20 1 side listriums, just executing concrete beam longitudinal reinforcement 31 by this dimensioned, the one end carries out the straight thread mantle fiber in advance to be handled to form straight thread silk head end, the other end adopts flat formation of anodontia sawing to cut flush end, as shown in Figure 3, straight thread silk head end and the inner surface straight thread interlock mutually that can weld straight screw sleeve 40 that described beam longitudinal reinforcement 31 is handled through the straight thread mantle fiber, so with beam longitudinal reinforcement 31 by straight thread with can weld straight screw sleeve 40 and be connected, reinforcing bar exposes screw thread and is no more than two buttons; After the connection of straight thread silk head end finishes, Fig. 4 is to shown in Figure 6 for another example, adopting molten ledge bar weldering welding point 50 that reserved steel bar 11 is cut flush end with beam longitudinal reinforcement 31 is connected, use molten ledge bar weldering two reinforcing bars 11,31 to be held with the flush end position of cutting of just executing beam longitudinal reinforcement 31 at the contrary reservation beam steel 11 of executing with angle steel 51, after 51 strikings of seam crossing angle steel backing plate, answer continuous sequence, make the fusion of two reinforcing bars 11 and 31 ends, also should add three layers of weldering fillets in parallel shear between reinforcing bar 11,31 and the angle steel backing plate 51, weld seam should be full, and the surface should be smooth.
Through technology tension test check, molten ledge bar weldering welding point 50 of the present utility model and can weld straight screw sleeve 40 jointings and all can reach the mechanical index strong even superpower with mother metal etc.

Claims (5)

1. contrary execute concrete beam reinforcing and just executing the steel column combined connection apparatus for one kind, it is characterized in that, be connected just to execute concrete beam with just executing between the steel column at the contrary concrete beam reinforcing of executing, this linkage comprises a welded straight screw sleeve and the molten ledge bar weldering welding point that an inner surface is a straight thread, should contrary execute concrete beam reinforcing and be reserved with one section reinforcing bar in the contrary outside of executing structure, the described straight screw sleeve that welds is welded on and just executes on the steel column, this is just being executed concrete beam longitudinal reinforcement one end and can weld straight screw sleeve and be connected, and the other end a section by described molten ledge bar weldering welding point and described reservation is connected against executing concrete beam reinforcing.
2. according to claim 1 against executing concrete beam reinforcing and just executing the steel column combined connection apparatus, it is characterized in that, the described concrete beam longitudinal reinforcement of just executing is handled formed straight thread silk head end with welding the end that straight screw sleeve is connected for the straight thread mantle fiber, and with the other end of molten ledge bar weldering welding point welding for adopting the flat formed flush end of cutting of anodontia sawing.
3. according to claim 1ly contrary execute concrete beam reinforcing and just execute the steel column combined connection apparatus, it is characterized in that described molten ledge bar weldering welding point comprises an angle steel.
4. according to claim 3 against executing concrete beam reinforcing and just executing the steel column combined connection apparatus, it is characterized in that, the described concrete beam longitudinal reinforcement of just executing passes through the welding fusion with the contrary end of executing concrete beam reinforcing of reservation, and the fillet in parallel shear between reinforcing bar and the angle steel is at least three layers.
5. according to claim 1ly contrary execute concrete beam reinforcing and just execute the steel column combined connection apparatus, it is characterized in that, describedly contraryly execute the concrete beam reinforcing length in reserve greater than 60mm.
CN2009202094099U 2009-09-08 2009-09-08 Combined connection device of reverse construction concrete beam steel bar and positive construction type steel column Expired - Fee Related CN201474095U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009202094099U CN201474095U (en) 2009-09-08 2009-09-08 Combined connection device of reverse construction concrete beam steel bar and positive construction type steel column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009202094099U CN201474095U (en) 2009-09-08 2009-09-08 Combined connection device of reverse construction concrete beam steel bar and positive construction type steel column

Publications (1)

Publication Number Publication Date
CN201474095U true CN201474095U (en) 2010-05-19

Family

ID=42410342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009202094099U Expired - Fee Related CN201474095U (en) 2009-09-08 2009-09-08 Combined connection device of reverse construction concrete beam steel bar and positive construction type steel column

Country Status (1)

Country Link
CN (1) CN201474095U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101949215A (en) * 2010-11-05 2011-01-19 中国建筑第八工程局有限公司 Mounting construction method of steel structure support seat
CN101949199A (en) * 2010-09-06 2011-01-19 王昌勇 Connecting structure and method for SRC (Steel Reinforced Concrete) steel rib and RC (Reinforced Concrete) beam steel
CN102505760A (en) * 2011-11-17 2012-06-20 东南大学 Prefabricated combined beam and column node member
CN103628571A (en) * 2013-12-09 2014-03-12 广州市第一建筑工程有限公司 Beam-column joint for reverse construction method and construction method
CN106223492A (en) * 2016-07-18 2016-12-14 中国建筑第八工程局有限公司 Steel column and the attachment structure of concrete beam reinforcing and method of attachment
CN111590229A (en) * 2020-06-17 2020-08-28 中铁十四局集团建筑工程有限公司 Combined connection method for concrete beam steel bars and section steel columns
CN115306162A (en) * 2022-09-01 2022-11-08 中铁十一局集团有限公司 Reverse construction welding connection construction method for section steel column and large-size section concrete beam

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101949199A (en) * 2010-09-06 2011-01-19 王昌勇 Connecting structure and method for SRC (Steel Reinforced Concrete) steel rib and RC (Reinforced Concrete) beam steel
CN101949215A (en) * 2010-11-05 2011-01-19 中国建筑第八工程局有限公司 Mounting construction method of steel structure support seat
CN102505760A (en) * 2011-11-17 2012-06-20 东南大学 Prefabricated combined beam and column node member
CN103628571A (en) * 2013-12-09 2014-03-12 广州市第一建筑工程有限公司 Beam-column joint for reverse construction method and construction method
CN106223492A (en) * 2016-07-18 2016-12-14 中国建筑第八工程局有限公司 Steel column and the attachment structure of concrete beam reinforcing and method of attachment
CN111590229A (en) * 2020-06-17 2020-08-28 中铁十四局集团建筑工程有限公司 Combined connection method for concrete beam steel bars and section steel columns
CN115306162A (en) * 2022-09-01 2022-11-08 中铁十一局集团有限公司 Reverse construction welding connection construction method for section steel column and large-size section concrete beam
CN115306162B (en) * 2022-09-01 2023-09-26 中铁十一局集团有限公司 Reverse construction and welding connection construction method for steel column and large-size section concrete beam

Similar Documents

Publication Publication Date Title
CN201474095U (en) Combined connection device of reverse construction concrete beam steel bar and positive construction type steel column
CN103088920B (en) Pre-tensioning prestressed composite beam structural system and construction method thereof
CN101748804B (en) Node structure of concrete filled steel tube column and reinforced concrete beam and construction technology thereof
CN100999913B (en) Node of steel tube concrete pole and steel reinforced concrete beam and processing method thereof
CN107476476A (en) One kind is greatly across steel bar truss floor support plate and reinforced beam combination constructing method thereof
CN107849831A (en) Method for carrying out pushing tow/construction bridge using prefabricated panel and steel-pipe concrete truss
CN103088915A (en) Cast-in-site column with column cap and construction method
CN108487453B (en) Connecting structure and connecting method for steel tube concrete column and reinforced concrete beam
CN104831818A (en) Connection node of precast reinforced concrete beam and laminated column
CN211499378U (en) Closely piece together two-way rib superimposed sheet node structure that does not go out
CN203096949U (en) Pre-tensioning method prestressing force superposed beam structural system
CN110424529B (en) Prefabricated cantilever beam balcony and construction method
CN100519963C (en) Node of round carbon fiber reinforced plastic steel pipe concrete column and armoured concrete frame girder
CN200999389Y (en) Panel point for steel pipe concrete column and reinforced concrete beam
CN103924676B (en) Prestressing force connects beams of concrete concrete-filled circular steel tube column node
CN104652430A (en) Composite reinforcement partially prestressed concrete solid square pile and manufacturing method thereof
CN211596368U (en) U-shaped steel-prestressed reinforced concrete bent cap and steel tube concrete column joint structure
CN108104263A (en) A kind of novel fabricated steel-regeneration concrete combination frame structural system
CN115772848A (en) Single-layer reinforcement hollow prefabricated pier with built-in metal corrugated pipe
CN203373774U (en) Subsection steel-bar-distribution pre-stressed concrete continuous wall
CN114197511B (en) Assembly type steel reinforced concrete light foundation and assembly method thereof
CN212896859U (en) Beam and wall connecting node of bolt-tube concrete structure
CN211775038U (en) Bolt-joint reinforced precast concrete wallboard, wall structure and structure system of wall structure
CN203097109U (en) Pre-tensioning pre-stressing superposed secondary beam prefabricated component
CN210086065U (en) Open storehouse reinforcement structure suitable for continuous box girder bridge longitudinal prestressing force pipeline

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100519

Termination date: 20180908