CN203293352U - Die for utilizing building waste materials to prefabricate triangular building blocks - Google Patents
Die for utilizing building waste materials to prefabricate triangular building blocks Download PDFInfo
- Publication number
- CN203293352U CN203293352U CN2013203600287U CN201320360028U CN203293352U CN 203293352 U CN203293352 U CN 203293352U CN 2013203600287 U CN2013203600287 U CN 2013203600287U CN 201320360028 U CN201320360028 U CN 201320360028U CN 203293352 U CN203293352 U CN 203293352U
- Authority
- CN
- China
- Prior art keywords
- building block
- die cavity
- triangle
- die
- triangular
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Moulds, Cores, Or Mandrels (AREA)
Abstract
The utility model discloses a die for utilizing building waste materials to prefabricate triangular building blocks. The die comprises a rectangular main die cavity enclosed with a template, at least two groups of continuous right angled isosceles triangle partition plates are arranged in the main die cavity along the length direction, and a middle triangular building block die cavity is separated in the main die cavity through the right angled isosceles triangle partition plates. A straight partition plate is arranged in the middle triangular building block die cavity to divide the middle triangular building block die cavity into two column side triangular building block die cavities. The building waste materials (such as crushed brick, cleared sand and broken stones) in construction are mixed with cement and combined with the die to prefabricate a middle triangular block and column side triangular blocks, prefabricated blocks are simple and convenient to construct in construction, and construction quality is improved.
Description
Technical field
The utility model relates to the mould that utilizes the prefabricated triangle building block of construction waste.
Background technology
In the high goose feather brick masonry of 200mm, middle corner block and the corner block on post limit occur under the general framework beam, construction is built by laying bricks or stones more tired.
The utility model content
The utility model technical issues that need to address are to provide a kind of mould that utilizes the prefabricated triangle building block of construction waste, can utilize this Mold Making triangle building block, facilitate the high goose feather brick masonry construction under Vierendeel girder.
The technical solution of the utility model is: a kind of mould that utilizes the prefabricated triangle building block of construction waste, comprise the rectangle master die cavity that is surrounded by template, be provided with along its length the continuous right angled isosceles triangle dividing plate of at least two groups in described main die cavity, this right angled isosceles triangle dividing plate is separated out middle triangle building block die cavity in main die cavity.
Preferably, described template is the thick steel plate of 20mm or plank.
Preferably, be provided with a straight baffle in described middle triangle building block die cavity middle triangle building block die cavity is divided into two post limit triangle building block die cavitys.
Preferably, described straight baffle one end is for outstanding isosceles right triangle and insert inboard, right angled isosceles triangle dividing plate right angle, and the corresponding described straight baffle of described template is provided with slot, and the described straight baffle other end inserts this slot.
Construction waste (waste materials such as the sand of brickbat, cleaning, rubble) in the utility model utilization construction adds cement and again mixes system, in conjunction with prefabricated its middle corner block of this mould and the corner block on post limit, prefabricated section is being built middle easy construction by laying bricks or stones, and construction quality is improved.
Description of drawings
Fig. 1 is middle triangle block structure schematic diagram;
Fig. 2 is post limit triangle block structure schematic diagram;
Fig. 3 is for utilizing the right angled isosceles triangle dividing plate to be separated out structural representation after middle triangle building block die cavity in main die cavity;
Fig. 4 is for utilizing right angled isosceles triangle dividing plate and straight baffle to be separated out structural representation after post limit triangle building block die cavity;
Fig. 5 is straight baffle and right angled isosceles triangle dividing plate and template fit structure schematic diagram.
The specific embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present utility model is described further:
As shown in Figures 1 to 5, the utility model utilizes the mould 1 of the prefabricated triangle building block of construction waste, comprise the rectangle master die cavity that is surrounded by template 10, be provided with along its length the continuous right angled isosceles triangle dividing plate 11 of at least two groups in described main die cavity, this right angled isosceles triangle dividing plate is separated out middle triangle building block die cavity 12 in main die cavity.Described template is the thick steel plate of 20mm or plank.Be provided with a straight baffle 13 in described middle triangle building block die cavity middle triangle building block die cavity is divided into two post limit triangle building block die cavitys 14.Described straight baffle one end is for outstanding isosceles right triangle 130 and insert inboard, right angled isosceles triangle dividing plate right angle, and the corresponding described straight baffle of described template is provided with slot 101, and the described straight baffle other end inserts this slot.
Utilize the construction method of construction waste and the prefabricated triangle building block of above-mentioned mould to be: at first to produce above-mentioned mould, secondly the sand that cleans out in brickbat, rubble and building construction process is added cement and the water system of again mixing and produce the triangle building block in mould.
First with the template welding, form the main die cavity of rectangle while making mould, then weld the right angled isosceles triangle dividing plate and form middle triangle building block die cavity in main die cavity, and straight baffle is inserted the right angled isosceles triangle dividing plate, middle triangle building block die cavity can be divided into two post limit triangle building block die cavitys.
Utilize the method for the prefabricated triangle building block of mould to be, first prefabricated middle triangle building block 2, then the building block of prefabricated post limit triangle 3.During prefabricated middle triangle building block 2, material is injected middle triangle building block cavity forming after the demoulding get final product; Prefabricated post limit triangle building block 3, insert the right angled isosceles triangle dividing plate with straight baffle and middle triangle building block die cavity can be divided into two post limit triangle building block die cavitys, then material is injected intermediolateral column limit triangle building block cavity forming after the demoulding get final product.
Claims (4)
1. mould that utilizes the prefabricated triangle building block of construction waste, it is characterized in that: comprise the rectangle master die cavity that is surrounded by template (10), be provided with along its length the continuous right angled isosceles triangle dividing plate (11) of at least two groups in described main die cavity, this right angled isosceles triangle dividing plate is separated out middle triangle building block die cavity (12) in main die cavity.
2. the mould that utilizes the prefabricated triangle building block of construction waste according to claim 1, it is characterized in that: described template is the thick steel plate of 20mm or plank.
3. the mould that utilizes the prefabricated triangle building block of construction waste according to claim 1, is characterized in that: be provided with a straight baffle (13) in described middle triangle building block die cavity (12) middle triangle building block die cavity is divided into two post limit triangle building block die cavitys (14).
4. the mould that utilizes the prefabricated triangle building block of construction waste according to claim 3, it is characterized in that: described straight baffle one end is for outstanding isosceles right triangle (130) and insert inboard, right angled isosceles triangle dividing plate right angle, the corresponding described straight baffle of described template is provided with slot (101), and the described straight baffle other end inserts this slot.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013203600287U CN203293352U (en) | 2013-06-20 | 2013-06-20 | Die for utilizing building waste materials to prefabricate triangular building blocks |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013203600287U CN203293352U (en) | 2013-06-20 | 2013-06-20 | Die for utilizing building waste materials to prefabricate triangular building blocks |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203293352U true CN203293352U (en) | 2013-11-20 |
Family
ID=49569390
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013203600287U Expired - Lifetime CN203293352U (en) | 2013-06-20 | 2013-06-20 | Die for utilizing building waste materials to prefabricate triangular building blocks |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203293352U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103341907A (en) * | 2013-06-20 | 2013-10-09 | 浙江海天建设集团有限公司 | Die and construction method for utilizing building wastes to prefabricate triangular building blocks |
-
2013
- 2013-06-20 CN CN2013203600287U patent/CN203293352U/en not_active Expired - Lifetime
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103341907A (en) * | 2013-06-20 | 2013-10-09 | 浙江海天建设集团有限公司 | Die and construction method for utilizing building wastes to prefabricate triangular building blocks |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10273691B2 (en) | Method of constructing a reinforced compound concrete beam containing demolished concrete lumps | |
CN105298020B (en) | Semi-precast circular steel pipe regenerated mixed concrete pillar and preparation method thereof | |
CN106245821B (en) | A kind of lightweight steel construction lightweight concrete prefabrication and assembly construction wall and its construction method | |
CN207578686U (en) | Self-adaptive precast concrete block manufacturing mold | |
CN109262811A (en) | It is fast to spell assembling-type precast laminated floor slab mold | |
CN102433958A (en) | Prefabricated wall board construction member | |
CN102717426B (en) | High-strength gypsum block making machine | |
CN109098434A (en) | Shear wall with short piers mold method | |
CN203293352U (en) | Die for utilizing building waste materials to prefabricate triangular building blocks | |
CN102383352A (en) | Method for constructing foam lightweight concrete poured roadbed | |
CN208343121U (en) | Prefabricated assembled steel structure concrete wallboard mould | |
CN202131701U (en) | Multifunctional hollow brick | |
CN103341907A (en) | Die and construction method for utilizing building wastes to prefabricate triangular building blocks | |
CN103061509A (en) | Construction process for implementing post-cast strip casting by post-cast strip stiff steel pipe support system | |
CN103664089B (en) | The shaping full-range technique of a kind of body of wall | |
CN203891301U (en) | Connecting structure with two layers of four adjacent building blocks and reinforced masonry thereof | |
CN110421683A (en) | A kind of production technology of building structure integration heat-insulation wall plate | |
CN202498617U (en) | Mold used for special-shaped wallboard | |
CN206267523U (en) | A kind of constructional column based on standard knot combination is poured uses template | |
CN205928992U (en) | Prefabricated machine of mortar hollow brick | |
CN203805118U (en) | Thickness-adjustable mould for manufacturing reinforcement protection layer cushion blocks | |
CN207646941U (en) | A kind of Constructional Col-umn Construction combination tool | |
CN102198692B (en) | Die for production of three-row-hole recycled concrete | |
CN205713066U (en) | Casting concrete non-dismantling formwork and for forming the mould of non-dismantling formwork | |
CN205777500U (en) | A kind of for secondary structure constructional column stigma concrete shaping mould plate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20131120 |