CN203288633U - Installation tool and wiring box installing system - Google Patents
Installation tool and wiring box installing system Download PDFInfo
- Publication number
- CN203288633U CN203288633U CN2013203279760U CN201320327976U CN203288633U CN 203288633 U CN203288633 U CN 203288633U CN 2013203279760 U CN2013203279760 U CN 2013203279760U CN 201320327976 U CN201320327976 U CN 201320327976U CN 203288633 U CN203288633 U CN 203288633U
- Authority
- CN
- China
- Prior art keywords
- briquetting
- erecting tools
- exerting pressure
- jump ring
- drive division
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P70/00—Climate change mitigation technologies in the production process for final industrial or consumer products
- Y02P70/50—Manufacturing or production processes characterised by the final manufactured product
Landscapes
- Photovoltaic Devices (AREA)
Abstract
The utility model provides an installation tool and a wiring box installing system. The installing tool includes a press block including a connection end and a pressure exerting end arranged oppositely; a drive part connected with the connection end of the press block and driving the pressing block to move linearly; a support receiving the drive part. The utility model also discloses a wiring box installing system including the above installation tool. When the installation tool provided by the invention is being used, the support is fixed on a specific working position. The drive part drives the press block to move and the pressure exerting end of the press block is made to contact with a to-be-installed object. The press block keeps moving and exerts pressure to the to-be-installed object, so that the to-be-installed object is installed in place gradually. Then the drive part drives the press block to separate with the to-be-installed object. Therefore, the installation is complete. Since a worker does not need to perform installation in a bare-handed manner, labor strength of the worker is reduced, working efficiency is improved and force application stability is improved. Therefore, installation reliability is guaranteed. At the same time, the installation tool provided by the utility model also has characteristics of simple structure and low manufacturing cost.
Description
Technical field
The utility model relates to the production technical field of solar panel, more specifically, relates to a kind of erecting tools and terminal box installation system.
Background technology
In the process of solar panel assembling, convergent belt need to be installed in terminal box.Be provided with jump ring on the box body of terminal box, convergent belt is pressed together in the box body of terminal box by jump ring.
In prior art, the free-hand card with jump ring of staff presses in the draw-in groove of box body.
The shortcoming of the artificial pressing jump ring of prior art: 1. large, the inefficiency of intensity of workers.2. the application of force is unstable, easily damages solar module.Because terminal box is arranged on solar module, thereby staff's pressing jump ring exerts oneself easily to cause hidden the splitting of cell piece of solar module when excessive, thereby cause, produces waste.3. firmly excessive, cause the jump ring distortion, can't push down convergent belt.
Relational language is explained:
Terminal box: a kind of box body that contains the positive and negative electrode lead-in wire that solar module uses.
Convergent belt: the special wire of solar module conduction use.
The utility model content
The utility model aims to provide a kind of erecting tools and terminal box installation system, to solve the free-hand installation of prior art thing to be installed, has application of force shakiness, large, the ineffective problem of intensity of workers.
For solving the problems of the technologies described above,, according to an aspect of the present utility model, provide a kind of erecting tools, comprising: briquetting, briquetting comprise the link that is oppositely arranged and the end of exerting pressure; Drive division, drive division is connected with the link of briquetting, and drives the briquetting rectilinear motion; Support, drive division is arranged on support.
Further, the face of exerting pressure of the end of exerting pressure of briquetting is cambered surface.
Further, be provided with angle between the direction of motion of the face of exerting pressure of the end of exerting pressure of briquetting and briquetting.
Further, the end of exerting pressure of briquetting has the groove of exerting pressure.
Further, the cell wall of the groove of exerting pressure comprises spigot surface and stop surface, and spigot surface is cambered surface.
Further, drive division comprises: body, body are arranged on support; Guide rod, guide rod and body are slidably connected, and an end of guide rod is connected with the link of briquetting.
Further, support comprises: connecting plate, drive division are arranged on connecting plate; At least four supporting legs, the upper end of each supporting leg all is connected with connecting plate, and forms and press space between at least four supporting legs and connecting plate, and briquetting is positioned at presses space.
Further, the lower end of each supporting leg is provided with the hang part that stretches out towards pressing space.
Further, drive division is the orthoscopic cylinder.
According to another aspect of the present utility model, a kind of terminal box installation system is provided, comprise terminal box, terminal box comprises box body and jump ring, jump ring is arranged on box body, and the terminal box installation system also comprises erecting tools, and erecting tools is above-mentioned erecting tools, the support of erecting tools is connected with box body, and the briquetting of erecting tools is with the jump ring butt or separate.
Briquetting in the utility model is connected with the drive division on being arranged on support, and drive division drives briquetting and moves along a straight line.While using the erecting tools in the utility model, support is fixed on place, a certain service position, drive division drives the briquetting motion, the end of exerting pressure of briquetting is contacted with thing to be installed, briquetting continues motion, to thing to be installed, exerts pressure and thing to be installed progressively is in place, then drive division driving briquetting separates with thing to be installed, completes installation.Due to the no longer free-hand installation of staff, thus alleviated the staff labour intensity, improved operating efficiency, improved the stability of the application of force, thereby guaranteed the reliability of installing.Simultaneously, the erecting tools in the utility model also has characteristics simple in structure, low cost of manufacture.
Description of drawings
The accompanying drawing that forms the application's a part is used to provide further understanding of the present utility model, and illustrative examples of the present utility model and explanation thereof are used for explaining the utility model, do not form improper restriction of the present utility model.In the accompanying drawings:
Fig. 1 has schematically shown the structural representation of the terminal box installation system in the utility model;
Fig. 2 has schematically shown the right view (briquetting and jump ring released state) of Fig. 1; And
The structural representation of the terminal box installation system when Fig. 3 has schematically shown briquetting in the utility model and jump ring butt state.
Reference numeral in figure: 10, briquetting; 11, link; 12, the end of exerting pressure; 12a, the groove of exerting pressure; 12b, spigot surface; 12c, stop surface; 20, drive division; 21, body; 22, guide rod; 30, support; 31, connecting plate; 32, supporting leg; 33, hang part; 40, terminal box; 41, box body; 42, jump ring; 50, solar module; 60, convergent belt.
Embodiment
Below in conjunction with accompanying drawing, embodiment of the present utility model is elaborated, but the multitude of different ways that the utility model can be defined by the claims and cover is implemented.
, as first aspect of the present utility model, provide a kind of erecting tools.As shown in Figure 1 to Figure 3, erecting tools comprises: briquetting 10, briquetting 10 comprise the link 11 that is oppositely arranged and the end 12 of exerting pressure; Drive division 20, drive division 20 is connected with the link 11 of briquetting 10, and drives briquetting 10 rectilinear motions; Support 30, drive division 20 is arranged on support 30.While using the erecting tools in the utility model, support 30 is fixed on place, a certain service position, drive division 20 drives briquetting 10 motions, the end of exerting pressure of briquetting 10 is contacted with thing to be installed, briquetting 10 continues motion, to thing to be installed, (for example: the jump ring 42 of terminal box 40) and thing to be installed progressively is in place exerts pressure, then drive division 20 driving briquettings 10 separate with thing to be installed, complete installation.Due to the no longer free-hand installation of staff, thus alleviated the staff labour intensity, improved operating efficiency, improved the stability of the application of force, thereby guaranteed the reliability of installing.Simultaneously, the erecting tools in the utility model also has characteristics simple in structure, low cost of manufacture.
Preferably, the face of exerting pressure of the end 12 of exerting pressure of briquetting 10 is cambered surface.In a not shown embodiment, end 12 sides towards thing to be installed of exerting pressure of briquetting 10 have curved surfaces.Because the end 12 of exerting pressure is arcuate structure, thereby when briquetting 10 was pressed thing to be installed, briquetting 10 and object light to be installed were slipped tactile, and the arcuate structure of the end 12 of exerting pressure has good guide effect, thereby guarantees that thing to be installed is in place smoothly.For example in the example of the jump ring 42 of pressing terminal box 40 (please refer to Fig. 3), one end of jump ring 42 is fixed on box body 41, and the perk when free state of the other end of jump ring 42, when pressing jump ring 42, the free end of jump ring 42 rotates with respect to the stiff end of jump ring 42.Because end 12 the face of exerting pressure of exerting pressure of briquetting 10 is cambered surface, thereby when briquetting 10 is pressed the free end of jump ring 42 and is moved, the active force that briquetting 10 imposes on jump ring 42 is all the time perpendicular to cambered surface and along the free-ended direction of motion of jump ring 42, the arc face of exerting pressure of the end 12 of exerting pressure of briquetting 10 plays guide effect, thereby be convenient to briquetting 10, jump ring 42 is in place.
Preferably, be provided with angle between the direction of motion of the face of exerting pressure of the end 12 of exerting pressure of briquetting 10 and briquetting 10.Further, angle is less than 90 degree.Because the angle between the direction of motion of end 12 the face of exerting pressure of exerting pressure of briquetting 10 and briquetting 10 is spent less than 90, namely the plane at link 11 places of the plane at end 12 places of exerting pressure of briquetting 10 and briquetting 10 is obliquely installed, thereby end 12 the face of exerting pressure of exerting pressure plays the effect of guiding when pressing thing to be installed, thereby guarantees that thing to be installed is in place smoothly.For example in the example of the jump ring 42 of pressing terminal box 40 (please refer to Fig. 3), one end of jump ring 42 is fixed on box body 41, and the perk when free state of the other end of jump ring 42, when pressing jump ring 42, the free end of jump ring 42 rotates with respect to the stiff end of jump ring 42.Because the angle between the direction of motion of end 12 the face of exerting pressure of exerting pressure of briquetting 10 and briquetting 10 is spent less than 90, thereby when briquetting 10 is pressed the free end of jump ring 42 and is moved, the active force that briquetting 10 imposes on jump ring 42 is all the time perpendicular to the face of exerting pressure that is obliquely installed of the end 12 of exerting pressure and along the free-ended direction of motion of jump ring 42, the face of exerting pressure of the end 12 of exerting pressure of briquetting 10 plays guide effect, thereby be convenient to briquetting 10, jump ring 42 is in place.
Preferably, as shown in Figures 2 and 3, the end 12 of exerting pressure of briquetting 10 has the groove of exerting pressure 12a.Owing to being provided with the groove 12a that exerts pressure, thereby when briquetting 10 pressing thing to be installed, an end of thing to be installed can be connected in the groove 12a that exerts pressure, and the groove 12a that exerts pressure treats installation material and plays the effect of guiding, location, thereby guarantees to install smoothly.
Preferably, the cell wall of the groove 12a that exerts pressure comprises spigot surface 12b and stop surface 12c, and spigot surface 12b is cambered surface (please refer to Fig. 2 and Fig. 3).Owing to being provided with spigot surface 12b, thereby briquetting 10 is in when motion, and thing to be installed moves along spigot surface 12b, owing to being provided with stop surface 12c, thereby avoids thing to be installed to be out of shape owing to move.In embodiment as shown in Figure 1 to Figure 3, the free end of jump ring 42 is provided with card, in the draw-in groove that snaps in box body 41.When briquetting 10 pressed down, the free end of jump ring 42 stretched in the groove 12a that exerts pressure, and along with pressing down gradually of briquetting 10, jump ring 42 moves along the spigot surface 12b of the groove 12a that exerts pressure, until the card of jump ring 42 is connected to the stop surface 12c place of the groove 12a that exerts pressure.Limited the position of the card of jump ring 42 due to stop surface 12c, thereby avoided jump ring 42 in the process that presses down, can't snap in smoothly the problem in the draw-in groove of box body 41 because of the card perk, the erecting tools in the utility model has the high characteristics of dependability.
Preferably, drive division 20 comprises: body 21, body 21 are arranged on support 30; Guide rod 22, guide rod 22 is slidably connected with body 21, and an end of guide rod 22 is connected (please refer to Fig. 1 to Fig. 3) with the link 11 of briquetting 10.Because guide rod 22 and body 21 are slidably connected, thereby when drive division 20 is worked, the briquetting 10 that is connected with guide rod 22 is with respect to body 21 free movements, thereby guaranteed the dependability of erecting tools.
Preferably, drive division 20 is the orthoscopic cylinder.Certainly, drive division 20 can be driven by motor.
Preferably, as shown in Figure 1 to Figure 3, support 30 comprises: connecting plate 31, drive division 20 are arranged on connecting plate 31; At least four supporting legs 32, the upper end of each supporting leg 32 all is connected with connecting plate 31, and forms and press space between at least four supporting legs 32 and connecting plate 31, and briquetting 10 is positioned at presses space.For example in the example of the jump ring 42 of pressing terminal box 40, supporting leg 32 is connected with terminal box 40, is used for terminal box 40 and erecting tools are fixed, and the end 12 of exerting pressure of briquetting 10 is towards jump ring 42, and briquetting 10 can vertically motion in pressing space.Owing to being provided with at least four supporting legs 32, thereby erecting tools and terminal box 40 stable connections, guaranteed the functional reliability of erecting tools.
Preferably, the lower end of each supporting leg 32 is provided with towards pressing the hang part 33(that stretches out in space and please refer to Fig. 1).For example in the example of the jump ring 42 of pressing terminal box 40, because support 30 is provided with hang part 33, thereby support 30 is fixed by hook with terminal box 40.Because support 30 and terminal box 40 are fixed by hook, thereby be convenient to staff's installation or removal erecting tools on terminal box 40, thereby improved the dependability of erecting tools.
, as second aspect of the present utility model, provide a kind of terminal box installation system.As shown in Figure 1 to Figure 3, the terminal box installation system comprises terminal box 40, terminal box 40 comprises box body 41 and jump ring 42, jump ring 42 is arranged on box body 41, the terminal box installation system also comprises erecting tools, erecting tools is above-mentioned erecting tools, and the support 30 of erecting tools is connected with box body 41, and the briquetting 10 of erecting tools is with jump ring 42 butts or separate.Before staff's pressing jump ring 42, an end of convergent belt 60 need to be placed on the draw-in groove place of box body 41, so that jump ring 42 is while being engaged to draw-in groove, can convergent belt 60 is fixing.
As shown in Figures 2 and 3, when briquetting 10 presses down jump ring 42, briquetting 10 moves downward with respect to the body 21 of drive division 20, namely body 21 moves upward with respect to briquetting 10, because body 21 is connected with support 30, thereby support 30 moves upward with respect to briquetting 10, and namely briquetting 10 is in the process that presses down, support 30 is subject to an active force that makes progress, thereby reduced erecting tools, imposes on the active force of terminal box 40.Because terminal box 40 is arranged on solar module 50, thereby the active force that imposes on terminal box 40 when erecting tools is while reducing, namely reduced the active force that terminal box 40 imposes on solar module 50, thereby the hidden danger of splitting of the cell piece that has reduced solar module 50, improved installation reliability.
As shown in Figure 1, jump ring 42 is a plurality of, and briquetting 10 can be in place a plurality of jump rings 42 simultaneously, thereby has improved operating efficiency.
Terminal box installation system in the utility model has simple to operate, time saving and energy saving characteristics.
The foregoing is only preferred embodiment of the present utility model, be not limited to the utility model, for a person skilled in the art, the utility model can have various modifications and variations.All within spirit of the present utility model and principle, any modification of doing, be equal to replacement, improvement etc., within all should being included in protection range of the present utility model.
Claims (10)
1. an erecting tools, is characterized in that, comprising:
Briquetting (10), described briquetting (10) comprise the link (11) that is oppositely arranged and the end (12) of exerting pressure;
Drive division (20), described drive division (20) is connected with the described link (11) of described briquetting (10), and drives described briquetting (10) rectilinear motion;
Support (30), described drive division (20) is arranged on described support (30).
2. erecting tools according to claim 1, is characterized in that, the described face of exerting pressure of exerting pressure end (12) of described briquetting (10) is cambered surface.
3. erecting tools according to claim 1, is characterized in that, is provided with angle between the face of exerting pressure of the described end (12) of exerting pressure of described briquetting (10) and the direction of motion of described briquetting (10).
4. erecting tools according to claim 1, is characterized in that, the described end (12) of exerting pressure of described briquetting (10) has the groove of exerting pressure (12a).
5. erecting tools according to claim 4, is characterized in that, the cell wall of the described groove of exerting pressure (12a) comprises spigot surface (12b) and stop surface (12c), and described spigot surface (12b) is cambered surface.
6. erecting tools according to claim 1, is characterized in that, described drive division (20) comprising:
Body (21), described body (21) are arranged on described support (30);
Guide rod (22), described guide rod (22) is slidably connected with described body (21), and an end of described guide rod (22) is connected with the described link (11) of described briquetting (10).
7. erecting tools according to claim 1, is characterized in that, described support (30) comprising:
Connecting plate (31), described drive division (20) are arranged on described connecting plate (31);
At least four supporting legs (32), the upper end of each described supporting leg (32) all is connected with described connecting plate (31), and form and press space between described at least four supporting legs (32) and described connecting plate (31), described briquetting (10) is positioned at the described space of pressing.
8. erecting tools according to claim 7, is characterized in that, the lower end of each described supporting leg (32) is provided with towards the described hang part (33) that stretches out in space of pressing.
9. erecting tools according to claim 1, is characterized in that, described drive division (20) is the orthoscopic cylinder.
10. terminal box installation system, comprise terminal box (40), described terminal box (40) comprises box body (41) and jump ring (42), described jump ring (42) is arranged on described box body (41), it is characterized in that, described terminal box installation system also comprises erecting tools, described erecting tools is the described erecting tools of any one in claim 1 to 9, the support of described erecting tools (30) is connected with described box body (41), and the briquetting of described erecting tools (10) is with described jump ring (42) butt or separate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013203279760U CN203288633U (en) | 2013-06-07 | 2013-06-07 | Installation tool and wiring box installing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013203279760U CN203288633U (en) | 2013-06-07 | 2013-06-07 | Installation tool and wiring box installing system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203288633U true CN203288633U (en) | 2013-11-13 |
Family
ID=49544984
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013203279760U Expired - Fee Related CN203288633U (en) | 2013-06-07 | 2013-06-07 | Installation tool and wiring box installing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203288633U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107611222A (en) * | 2017-09-19 | 2018-01-19 | 营口金辰机械股份有限公司 | Solar battery component junction box automatic charging device and the fixture coordinated with the feeding device |
-
2013
- 2013-06-07 CN CN2013203279760U patent/CN203288633U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107611222A (en) * | 2017-09-19 | 2018-01-19 | 营口金辰机械股份有限公司 | Solar battery component junction box automatic charging device and the fixture coordinated with the feeding device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203288633U (en) | Installation tool and wiring box installing system | |
CN204108183U (en) | Breaker conducting system rigid line shaped device | |
CN207719070U (en) | A kind of smart home switch being easily installed | |
CN203459813U (en) | Double-position clamp | |
CN203156751U (en) | Feeding robot | |
CN203193803U (en) | SOCKET camera module test system | |
CN204135652U (en) | Universal pressing tool | |
CN105215173A (en) | A kind of diel of engine pipe cap and engine production technology for pipe cap | |
CN202507220U (en) | Assembling equipment for sealing strip for cover plate of lamp | |
CN204074882U (en) | Rush slab equipment | |
CN205032588U (en) | Urea sensor presses gear ring equipment | |
CN202910173U (en) | Punching riveting die with multiple punches | |
CN202050311U (en) | Improved structure of motor casing | |
CN205799682U (en) | A kind of plastic sheath side wall slot mechanism | |
CN204243804U (en) | A kind of mobile phone charging bracket | |
CN216896939U (en) | Detachable portable lighting down lamp | |
CN204307783U (en) | A kind of automatic dispensing machine | |
CN204289490U (en) | A kind of graphite nail platform | |
CN203887512U (en) | Jig for assembling iron part and spring of mouse | |
CN204927429U (en) | Electricity core dress steel sheet anchor clamps | |
CN203993018U (en) | A kind of semi-automatic mounting equipment | |
CN203197190U (en) | Auxiliary device for assembling box body component | |
CN203919164U (en) | Fast hydraulic pressure punching jig | |
CN202964479U (en) | Hold-down mechanism of frame | |
CN202910139U (en) | Stamping device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131113 Termination date: 20160607 |
|
CF01 | Termination of patent right due to non-payment of annual fee |