CN203270585U - Riprap leveling device - Google Patents
Riprap leveling device Download PDFInfo
- Publication number
- CN203270585U CN203270585U CN 201320012521 CN201320012521U CN203270585U CN 203270585 U CN203270585 U CN 203270585U CN 201320012521 CN201320012521 CN 201320012521 CN 201320012521 U CN201320012521 U CN 201320012521U CN 203270585 U CN203270585 U CN 203270585U
- Authority
- CN
- China
- Prior art keywords
- pipe
- leveling
- leveling device
- jackstone
- riprap
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Abstract
The utility model relates to water bottom foundation bed leveling equipment, and discloses a riprap leveling device. The riprap leveling device comprises a riprap pipe, wherein a global positioning system (GPS) and a leveling head which are respectively arranged on the top and at the bottom of the riprap pipe; the leveling head is used for leveling a foundation bed; the GPS is used for determining the planar position and the bottom elevation of the riprap pipe; the riprap pipe comprises an upper part and a lower part; the upper part is a fixed main pipe; the lower part is a telescopic balance pipe; the balance pipe is connected with the leveling head; and the leveling head is provided with a sonar system for detecting a sea bottom groove bed and the elevation of the foundation bed. The riprap leveling device is simple in structure; the riprap pipe is used for riprapping the foundation bed; and when the elevation deviation of the foundation bed exceeds a certain range, the leveling head is used for leveling the foundation bed, so that the tamping and the leveling of the foundation bed are guaranteed, and the planeness of the foundation bed is high.
Description
Technical field
The utility model relates to water-bed base bed flattening equipment, relates in particular to a kind of water-bed rubble mound foundation levelling head.
Background technology
In the laying leveling construction on marine (Ha Noi) immersed tube tunnel basis, need to carry out rubble leveling in the good foundation trench of excavation before immersed tube is installed, then with prefabricated immersed tube floating clouds to bedding top and carry out the sinking installation.
Riprap foundation is in order to replace original soft layer; to improve the supporting capacity of ground; make the load that superstructure transmits reach equably ground; to satisfy distortion and stable requirement; and take full advantage of its water permeability; reduce the water-head of building front and back, avoid seepage flow, avoid the scour of wave and current with the protection ground.Bedding need to be tamped leveling, and guarantees that it is a plane, requires to be horizontal plane or inclined-plane.
The utility model content
The technical problem that (one) will solve
The purpose of this utility model is to provide a kind of rubble leveling device, to guarantee the flatness of bedding.
(2) technical scheme
For solving the problems of the technologies described above, the utility model provides a kind of rubble leveling device, comprise the jackstone pipe, the top of described jackstone pipe and bottom are respectively equipped with GPS navigation system and leveling head, described leveling head is used for bedding and strikes off, and described GPS navigation system is used for confirming plan-position and the end absolute altitude of jackstone pipe.
Wherein, described jackstone pipe comprises up and down two parts, and top is fixing supervisor, and the bottom is telescopic balance pipe, and described balance pipe is connected with described leveling head.
Wherein, described balance pipe is stretched by the Driven by Hydraulic Cylinder of being located on described jackstone pipe.
Wherein, described hydraulic cylinder is made as many, and many described hydraulic cylinders are evenly distributed on described balance pipe.
Wherein, described hydraulic cylinder is made as four.
Wherein, described leveling head is provided with sonar system, and described sonar system is for detection of seabed troughstand and bedding absolute altitude.
Wherein, also be provided with clinometer for detection of jackstone pipe inclined degree on described jackstone pipe.
Wherein, be provided with level-sensing device for detection of controlling level in described jackstone pipe.
Wherein, described level-sensing device adopts Plumb-bob Material Level Meter.
Wherein, described jackstone pipe is provided with the multistage feeding mouth.
(3) beneficial effect
A kind of rubble leveling device that the utility model provides, simple in structure, adopt the jackstone pipe to the bedding jackstone, bedding adopts leveling head to strike off processing when existing the high deviation of calibration to surpass certain limit, has guaranteed the compacting leveling of bedding, and the flatness of bedding is high.
Description of drawings
Fig. 1 is the structural representation of a kind of rubble leveling device of the utility model;
Fig. 2 is sonar system structural representation in the utility model.
In figure: 1, jackstone pipe; 2, leveling head; 31, calibration sonar; 32, lay the measurement sonar; 4, bedding.
The specific embodiment
Below in conjunction with drawings and Examples, the specific embodiment of the present utility model is described in further detail.Following examples are used for explanation the utility model, but are not used for limiting scope of the present utility model.
As Fig. 1, a kind of rubble leveling device of the present utility model, comprise jackstone pipe 1, the top of jackstone pipe 1 and bottom are respectively equipped with GPS navigation system and leveling head 2, jackstone pipe 1 is used for the bedding jackstone, leveling head 2 is used for bedding is struck off, and the GPS navigation system is used for confirming plan-position and the end absolute altitude of jackstone pipe 1.
Jackstone pipe 1 comprises up and down two parts, and top is fixing supervisor, and the bottom is telescopic balance pipe, and balance pipe is connected with leveling head 2.Balance pipe is stretched by the Driven by Hydraulic Cylinder of being located on jackstone pipe 1.This hydraulic cylinder can be made as many, and many hydraulic cylinders are evenly distributed on balance pipe, act on simultaneously the length of adjustment pipe, to satisfy the required precision of rubble leveling; And being provided with the hydraulic cylinder extension sensor on every hydraulic cylinder, this telescoping sensor is used for accurately measuring the flexible stroke of hydraulic cylinder.Hydraulic cylinder can be made as four.
Confirm the plan-position and end absolute altitude of jackstone pipe 1 by the GPS navigation system after, the balance pipe flexible stroke that carries out is repeatedly confirmed, guarantee that hydraulic cylinder extension length can satisfy accommodation and lay needs, thus, lifting jackstone pipe 1 again in the process of deployment at an accommodation.
Be provided with the level-sensing device for detection of controlling level in jackstone pipe 1, this level-sensing device can adopt Plumb-bob Material Level Meter.Measure by weight controlling level in the jackstone pipe is controlled within the specific limits, need to stop during measurement adopting weight to measure after conveying again, its reason is that the building stones of avoiding weight to be fallen bury, and damages wire rope when mentioning weight.In process of deployment, weight can continuously be measured controlling level in the jackstone pipe with certain frequency.The pulling force of controlling the winch of weight can not be too small, and too small words make weight to regain because the speed of laying piece makes weight to spread into bedding along with rubble, should control when pulling force keeps weight to drop down onto charge level to stop.
Also be provided with the clinometer for detection of jackstone pipe inclined degree on jackstone pipe 1, the inclined degree of jackstone pipe detected according to clinometer is revised position and the height of jackstone pipe, to guarantee the flatness of bedding.
This rubble leveling device also comprises sonar system, and this sonar system is arranged on leveling head 2, for detection of seabed troughstand and bedding absolute altitude.As shown in Figure 2, sonar system comprises calibration sonar 31 and lays and measure sonar 32, and the sonar velocity of sound of calibration sonar 31 is transferred to a suitable value, and the velocity of sound of then laying of bedding 4 being measured sonar 32 transfers to calibrate sonar 31 identical.Be subjected to the impact of the factors such as the depth of water, water temperature, salt concentration to make measured value produce error due to sonar, therefore all need to calibrate during each absolute altitude of measuring bedding.
A kind of rubble leveling device that technique scheme provides, be used for the construction of seabed/river bed bedding, it is simple in structure, the jackstone pipe is to the bedding jackstone, if surpass ± 40mm according to the high deviation of calibration of the testing result bedding of sonar system, can adopt leveling head to strike off processing, guarantee the compacting leveling of bedding, the flatness of bedding is high.The 2nd GPS navigation system by jackstone pipe top receives three-dimensional coordinate data and controls in conjunction with the absolute altitude that the stroke of jackstone length of tube, jackstone pipe angle of inclination and bottom liquid cylinder pressure carries out the rubble bedding, and its certainty of measurement is controlled accurately.
The above is only preferred embodiment of the present utility model; should be understood that; for those skilled in the art; under the prerequisite that does not break away from the utility model know-why; can also make some improvement and replacement, these improvement and replacement also should be considered as protection domain of the present utility model.
Claims (10)
1. rubble leveling device, it is characterized in that, comprise the jackstone pipe, the top of described jackstone pipe and bottom are respectively equipped with GPS navigation system and leveling head, described leveling head is used for bedding and strikes off, and described GPS navigation system is used for confirming plan-position and the end absolute altitude of jackstone pipe.
2. rubble leveling device as claimed in claim 1, is characterized in that, described jackstone pipe comprises up and down two parts, and top is fixing supervisor, and the bottom is telescopic balance pipe, and described balance pipe is connected with described leveling head.
3. rubble leveling device as claimed in claim 2, is characterized in that, described balance pipe is stretched by the Driven by Hydraulic Cylinder of being located on described jackstone pipe.
4. rubble leveling device as claimed in claim 3, is characterized in that, described hydraulic cylinder is made as many, and many described hydraulic cylinders are evenly distributed on described balance pipe.
5. rubble leveling device as claimed in claim 4, is characterized in that, described hydraulic cylinder is made as four.
6. rubble leveling device as claimed in claim 1, is characterized in that, described leveling head is provided with sonar system, and described sonar system is for detection of seabed troughstand and bedding absolute altitude.
7. rubble leveling device as claimed in claim 1, is characterized in that, also is provided with the clinometer for detection of jackstone pipe inclined degree on described jackstone pipe.
8. rubble leveling device as claimed in claim 1, is characterized in that, is provided with the level-sensing device for detection of controlling level in described jackstone pipe.
9. rubble leveling device as claimed in claim 8, is characterized in that, described level-sensing device adopts Plumb-bob Material Level Meter.
10. rubble leveling device as claimed in claim 1, is characterized in that, described jackstone pipe is provided with the multistage feeding mouth.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320012521 CN203270585U (en) | 2013-01-10 | 2013-01-10 | Riprap leveling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320012521 CN203270585U (en) | 2013-01-10 | 2013-01-10 | Riprap leveling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203270585U true CN203270585U (en) | 2013-11-06 |
Family
ID=49501026
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320012521 Expired - Lifetime CN203270585U (en) | 2013-01-10 | 2013-01-10 | Riprap leveling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203270585U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103669328A (en) * | 2013-12-04 | 2014-03-26 | 中交一航局第二工程有限公司 | Underwater structure riprap foundation bed vibration compaction and vibration leveling device and construction method |
CN103924574A (en) * | 2013-01-10 | 2014-07-16 | 中交第一航务工程局有限公司 | Riprap leveling device |
CN104674818A (en) * | 2015-02-16 | 2015-06-03 | 中交第一航务工程局有限公司 | Construction device and construction method for deepwater gravel foundation bed |
CN104762973A (en) * | 2015-02-16 | 2015-07-08 | 中交一航局第二工程有限公司 | Height control system for stone throwing in deep water |
-
2013
- 2013-01-10 CN CN 201320012521 patent/CN203270585U/en not_active Expired - Lifetime
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103924574A (en) * | 2013-01-10 | 2014-07-16 | 中交第一航务工程局有限公司 | Riprap leveling device |
CN103924574B (en) * | 2013-01-10 | 2016-02-03 | 中交第一航务工程局有限公司 | Rubble leveling device |
CN103669328A (en) * | 2013-12-04 | 2014-03-26 | 中交一航局第二工程有限公司 | Underwater structure riprap foundation bed vibration compaction and vibration leveling device and construction method |
CN104674818A (en) * | 2015-02-16 | 2015-06-03 | 中交第一航务工程局有限公司 | Construction device and construction method for deepwater gravel foundation bed |
CN104762973A (en) * | 2015-02-16 | 2015-07-08 | 中交一航局第二工程有限公司 | Height control system for stone throwing in deep water |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103924597B (en) | Platform-type jackstone leveling ship and construction method thereof | |
CN203846501U (en) | Platform-type riprap leveling ship | |
CN103924574B (en) | Rubble leveling device | |
CN103938703B (en) | A kind of pipe jacking construction method | |
CN203270585U (en) | Riprap leveling device | |
CN105350509A (en) | Filing layered sedimentation monitoring device and method | |
CN202380564U (en) | Beach waterspout structure | |
CN107034931A (en) | Steel-pipe pile testing apparatus for verticality and deep water steel pipe pile construction method | |
CN104674818A (en) | Construction device and construction method for deepwater gravel foundation bed | |
CN104762973B (en) | A kind of deep water jackstone elevation control system | |
CN104406568A (en) | Device and method for monitoring settlement of ground surface in deep water area | |
CN212772503U (en) | Caisson installation double-GPS measurement positioning device | |
CN103644892A (en) | Measuring device and method for layered settlement of soil body of deep foundation pit | |
CN102383436B (en) | Accurate positioning construction method of double-wall steel cofferdam | |
KR100931061B1 (en) | Soft ground settlement measuring device and settlement method according to it | |
CN107100213A (en) | Soil disturbance monitoring system and monitoring method of the bridge construction of pile groups to adjacent piles | |
CN106759542A (en) | The deformation monitoring of deep basal pit and the method for Deformation Prediction | |
CN106939593A (en) | One kind closes on both wired construction of diaphragm wall technique | |
CN101655405B (en) | Pore water pressure gauge and use method thereof | |
CN209605800U (en) | A kind of automatic static level apparatus for measuring vertical displacement based on laser measurement | |
CN206873514U (en) | Steel-pipe pile testing apparatus for verticality | |
CN103741726A (en) | Open caisson settling volume measuring method | |
CN103938662B (en) | Underwater loading pilot system | |
CN111042109A (en) | Pile sinking process for land overlength PHS inclined pile | |
CN115728792A (en) | Checking method for full-floating gravel foundation bed laying measuring equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20131106 Effective date of abandoning: 20160203 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |