- Publication number
- CN203247503U CN203247503U CN 201320244573 CN201320244573U CN203247503U CN 203247503 U CN203247503 U CN 203247503U CN 201320244573 CN201320244573 CN 201320244573 CN 201320244573 U CN201320244573 U CN 201320244573U CN 203247503 U CN203247503 U CN 203247503U
- Authority
- CN
- China
- Prior art keywords
- connector
- steel strands
- anchor
- bridge prestressing
- connector body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model relates to a connector for multiple steel strands for road and bridge prestressing. In the prior art, steel strands are connected and fixed usually in the mode that the steel strands at the two ends are connected through a connecting cylinder and two steel working clamping piece sets in the connecting cylinder, the connection mode is suitable for the connection of a single-hole anchorage device with a single steel strand, but multiple connectors are needed when multiple steel strands are connected at the same time, therefore, cost is increased, and work efficiency is lowered. The connector for the multiple steel strands for road and bridge prestressing comprises a corrugated pipe A (1), wherein the corrugated pipe A is connected with an anchor bearing plate (2), the anchor bearing plate is connected with a connector body (3), working clamping pieces (4) are installed on the connector body, the connector body is installed inside a protection cover (5), the protection cover is connected with a corrugated pipe B (7) through a constraint ring (6), a right end steel strand (8) penetrates through the connector body and is installed on an extrusion anchor (9), and the extrusion anchor is connected with the connector body. The connector is used for connecting the multiple steel strands.
Description
Technical field:
The utility model relates to a kind of bridge prestressing force with many steel hinge line connectors.
Background technology:
In the road and bridge construction member, except adopting reinforcing bar, adopt in a large number steel strand, its main cause is because steel strand intensity is large, easily anchoring etc., but in the connection of steel strand, still lack particularly large-tonnage wire rope connector of the coupling that is connected firmly.
For fixing of prestress wire, two kinds of pre-tensioning system and post stretching are arranged, the key of prestressing technique is anchor rod, anchor rod is to guarantee one of key that prestressed reinforced concrete construction is safe and reliable, the stressed of ground tackle wanted evenly, being connected and fixed of the steel strand of prior art, generally by connecting cylinder and the connection of interior two groups of steel work clip sheets realization two ends steel strand of be connected, be applicable to single hole anchor device and be connected connection with single steel strand, when connecting simultaneously for many, need to adopt many group connectors, increase cost, reduce operating efficiency.
Summary of the invention:
The purpose of this utility model provides a kind of bridge prestressing force with many steel hinge line connectors.
Above-mentioned purpose realizes by following technical scheme:
A kind of bridge prestressing force is with many steel hinge line connectors; its composition comprises: bellows A; described bellows A is connected with anchor plate; described anchor plate is connected with connector; work clip sheet is installed on the described connector, and described connector is installed in the protective cover, and described protective cover is connected with bellows B by the constraint circle; the right-hand member steel strand pass described connector and are installed on the extruding anchor, and described extruding anchor is connected with described connector.
Described bridge prestressing force is equipped with the left end steel strand with many steel hinge line connectors on the described work clip sheet, described left end steel hinge line passes described bellows A by spiral bar, described connector, described anchor plate.
Described bridge prestressing force is equipped with stack with many steel hinge line connectors on the described protective cover.
Beneficial effect:
The utility model compact conformation, easy to connect, firm, can connect simultaneously many group steel strand.
The utility model can provide firmly as the large-tonnage wire rope connector and connect.
Single product of the present utility model has substituted many groups connector, has reduced construction cost, has improved operating efficiency.
Description of drawings:
Accompanying drawing 1 is structural representation of the present utility model.
Accompanying drawing 2 is A-A sectional views of accompanying drawing 1.
The specific embodiment:
Embodiment 1:
A kind of bridge prestressing force is with many steel hinge line connectors; its composition comprises: bellows A; piece number: 1, described bellows A is connected with anchor plate 2, and described anchor plate is connected with connector 3; work clip sheet 4 is installed on the described connector; described connector is installed in the protective cover 5, and described protective cover is by constraint circle 6 and bellows B, and piece number: 7 connect; right-hand member steel strand 8 pass described connector and are installed on the extruding anchor 9, and described extruding anchor is connected with described connector.
Embodiment 2:
With many steel hinge line connectors, left end steel strand 10 are installed on the described work clip sheet according to embodiment 1 described bridge prestressing force, described left end steel hinge line passes described bellows A by spiral bar 11, described connector, described anchor plate.
Embodiment 3:
With many steel hinge line connectors, stack 12 is installed on the described protective cover according to embodiment 1 or 2 described bridge prestressing force.
Claims (3)
1. a bridge prestressing force is with many steel hinge line connectors; its composition comprises: bellows A; it is characterized in that: described bellows A is connected with anchor plate; described anchor plate is connected with connector; work clip sheet is installed on the described connector, and described connector is installed in the protective cover, and described protective cover is connected with bellows B by the constraint circle; the right-hand member steel strand pass described connector and are installed on the extruding anchor, and described extruding anchor is connected with described connector.
2. bridge prestressing force according to claim 1 is with many steel hinge line connectors, it is characterized in that: the left end steel strand are installed on the described work clip sheet, and described left end steel hinge line passes described bellows A by spiral bar, described connector, described anchor plate.
3. bridge prestressing force according to claim 1 and 2 is characterized in that: on the described protective cover stack is installed with many steel hinge line connectors.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201320244573 CN203247503U (en) | 2013-02-01 | 2013-05-08 | Connector for multiple steel strands for road and bridge prestressing |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320058340 | 2013-02-01 | ||
CN201320058340.0 | 2013-02-01 | ||
CN 201320244573 CN203247503U (en) | 2013-02-01 | 2013-05-08 | Connector for multiple steel strands for road and bridge prestressing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203247503U true CN203247503U (en) | 2013-10-23 |
Family
ID=49373950
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201320244573 Expired - Fee Related CN203247503U (en) | 2013-02-01 | 2013-05-08 | Connector for multiple steel strands for road and bridge prestressing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203247503U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106245537A (en) * | 2016-09-28 | 2016-12-21 | 天津银龙高科新材料研究院有限公司 | A kind of compressor wire beam device |
CN106245538A (en) * | 2016-09-28 | 2016-12-21 | 天津银龙高科新材料研究院有限公司 | A kind of construction equipment of anchoring prestress steel strand wires |
CN107386126A (en) * | 2017-09-05 | 2017-11-24 | 安徽金星预应力工程技术有限公司 | Continuous bridge use for tendon spreading anchor |
-
2013
- 2013-05-08 CN CN 201320244573 patent/CN203247503U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106245537A (en) * | 2016-09-28 | 2016-12-21 | 天津银龙高科新材料研究院有限公司 | A kind of compressor wire beam device |
CN106245538A (en) * | 2016-09-28 | 2016-12-21 | 天津银龙高科新材料研究院有限公司 | A kind of construction equipment of anchoring prestress steel strand wires |
CN107386126A (en) * | 2017-09-05 | 2017-11-24 | 安徽金星预应力工程技术有限公司 | Continuous bridge use for tendon spreading anchor |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101696591A (en) | Steel strand connector | |
CN203247503U (en) | Connector for multiple steel strands for road and bridge prestressing | |
CN203510449U (en) | Novel tension device for pipe pile production | |
CN101745983A (en) | A kind of tubular pile pre-stress stretching device | |
CN202644524U (en) | Tubular pile steel reinforcement cage mixed with non-prestressed reinforcing steel bar | |
WO2014132198A3 (en) | Reinforcement, structure and method for underground reinforced concrete constructions | |
CN101864827A (en) | Anchor design of pre-stressed carbon fiber reinforced plastic rib group | |
CN205976231U (en) | Steel strand wires connector work systems | |
CN102561599A (en) | Connector of steel stranded wires and finished twisted steel | |
CN203270439U (en) | Prestressed anchorage device used for road and bridge construction | |
CN105019669A (en) | U-shaped suspension ring structure | |
CN202391018U (en) | Connector between steel strand and finished deformed bar | |
CN203514921U (en) | Electricity approaching stay wire replacing tool | |
CN203756202U (en) | Rapid feeder for vertical anchor cable | |
CN201687495U (en) | Truss interlocker | |
CN203049892U (en) | Structure for steel strand polymer mortar reinforced concrete structural member | |
CN204492327U (en) | A kind of Assembled safety enclosing railings | |
CN201810327U (en) | Steel strand anchor rod of extruding anchor with external threads | |
CN203361736U (en) | Temporary reinforcement device for electric pole | |
CN202482901U (en) | Pull-out test steel hoop for prestressed concrete pipe pile | |
CN203514917U (en) | Annular rebar sea sand concrete high-strength electrical pole | |
CN2589597Y (en) | Prefabricated aramid fiber reinforced tube concrete component | |
CN205591545U (en) | Instrument is consolidated to log template | |
CN2719979Y (en) | Anchor special for prestressed fanglun fiber sheet material | |
CN202298923U (en) | Equidistant clip |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |